Back to bathroom remodel contractors
Shing Hing Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Apr 2019
- Last 24 months
- 0 permits filed
53 permits since 2000: 43 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 23 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2017 | Completed final sign-off Nov 2018 | 730 38th Av | 1st floor remodeling: adding a new office and new full bathroom at ground floorDetails
1st floor remodeling: adding a new office and new full bathroom at ground floor | $40,000 |
| Apr 26, 2017 | Completed final sign-off Dec 2017 | 72 Middlefield Dr | work at ground floor only - extend 3' from rear of ground floor to line up with 2nd floor exterior wall. renovate as built bathroom & replace all bathroom fixtures with new. renovate existing family room to become a new bedroom. renovate existing bedroom to have bigger closet.Details
work at ground floor only - extend 3' from rear of ground floor to line up with 2nd floor exterior wall. renovate as built bathroom & replace all bathroom fixtures with new. renovate existing family room to become a new bedroom. renovate existing bedroom to have bigger closet. | $20,000 |
| Apr 21, 2017 | Completed final sign-off Feb 2018 | 219 Monterey Bl | remodel a bathroom in the first floor. replace (2) exhaust fans. all new lites shall be led, remodel kitchen install sheetrock for a full bathroom. rev. to pa#201703020574. to comply with complaints #201652542 & 199703854Details
remodel a bathroom in the first floor. replace (2) exhaust fans. all new lites shall be led, remodel kitchen install sheetrock for a full bathroom. rev. to pa#201703020574. to comply with complaints #201652542 & 199703854 | $7,500 |
| Nov 18, 2016 | Expired or cancelled cancelled Dec 2020 | 734 07th Av | remove walls between, living dining kitche to create open living/dining/kitchen; remodel (e) master bedroom & closets into 2 bedrooms & closets; remodel (e) 2 bedroom & closets into master bedroom & new bath.Details
remove walls between, living dining kitche to create open living/dining/kitchen; remodel (e) master bedroom & closets into 2 bedrooms & closets; remodel (e) 2 bedroom & closets into master bedroom & new bath. | $50,000 |
| Mar 24, 2015 | Completed final sign-off May 2015 | 271 Dolores St | remodel bathroom, remove tiles for tub & floor tile,toilet,keep the tub,install new tiles for tub & floor,install vanity/sink,toilet wall lights,no alteration of wall window & door.Details
remodel bathroom, remove tiles for tub & floor tile,toilet,keep the tub,install new tiles for tub & floor,install vanity/sink,toilet wall lights,no alteration of wall window & door. | $3,500 |
| Oct 9, 2014 | Completed final sign-off Jul 2015 | 1204 Powhattan Av | remodel kitchen & 2 full bathrooms. replace (e) decking with new (less than 50%). all lighting will be high efficacy.Details
remodel kitchen & 2 full bathrooms. replace (e) decking with new (less than 50%). all lighting will be high efficacy. | $28,000 |
| Oct 9, 2014 | Completed final sign-off May 2015 | 1137 Potrero Av | unit 1137 (2/f): remodel kitchen, 1 bath, 1/2 bath, all lighting will be hi efficacy. unit 1139 (3/f): remodel kitchen, 1 full bath, 1/2 bath.Details
unit 1137 (2/f): remodel kitchen, 1 bath, 1/2 bath, all lighting will be hi efficacy. unit 1139 (3/f): remodel kitchen, 1 full bath, 1/2 bath. | $65,000 |
| Nov 25, 2013 | Completed final sign-off Jun 2014 | 1027 Russia Av | revision to 201002015705 - remodel master bathroom on 2nd floor with new plumbing fixtures.Details
revision to 201002015705 - remodel master bathroom on 2nd floor with new plumbing fixtures. | $8,000 |
| Nov 10, 2011 | Never finaled issued Nov 2011, no final | 1491 08th Av | #1 - to comply with complaint #201167269 for bathroom remodel and kitchen remodel. no wall relocation. kitchen & bathroom remodel to comply with california electrical code cec 150(k)8 & 150(k)10 respectively.Details
#1 - to comply with complaint #201167269 for bathroom remodel and kitchen remodel. no wall relocation. kitchen & bathroom remodel to comply with california electrical code cec 150(k)8 & 150(k)10 respectively. | $8,000 |
| Oct 28, 2011 | Completed final sign-off Dec 2011 | 2473 27th Av | remodel existing bathroom. repair living room ceiling replace 1 side window. max ufactor .4Details
remodel existing bathroom. repair living room ceiling replace 1 side window. max ufactor .4 | $6,000 |
| Aug 4, 2011 | Completed final sign-off Sep 2012 | 2170 12th Av | to comply with complaint # 201149586, dated july 13, 2011. legalize (e) storage rooms and full bath room on ground floorDetails
to comply with complaint # 201149586, dated july 13, 2011. legalize (e) storage rooms and full bath room on ground floor | $30,000 |
| Mar 18, 2011 | Completed final sign-off Nov 2011 | 240 San Fernando Wy | revision to pa# 201101188506-sheet a2.1, relocate bathroom & bedroom on 2nd floorDetails
revision to pa# 201101188506-sheet a2.1, relocate bathroom & bedroom on 2nd floor | $5,000 |
| Jan 18, 2011 | Completed final sign-off Nov 2011 | 240 San Fernando Wy | kitchen and bathroom remodelingDetails
kitchen and bathroom remodeling | $10,000 |
| Sep 9, 2010 | Completed final sign-off Aug 2011 | 1338 Hampshire St | relocate e kitchen and bedroom in 1340. add 1 new bathroom in unit 1340Details
relocate e kitchen and bedroom in 1340. add 1 new bathroom in unit 1340 | $30,000 |
| May 24, 2010 | Completed final sign-off Jan 2011 | 18 Huntington Dr | revision to pa# 2010-0301-7352-revise the layout of 2 bedrooms, 1 full bathroom on lower floor. revise the layout of 2 full bathrooms & 1 closet on upper floorDetails
revision to pa# 2010-0301-7352-revise the layout of 2 bedrooms, 1 full bathroom on lower floor. revise the layout of 2 full bathrooms & 1 closet on upper floor | |
| Apr 21, 2010 | Completed final sign-off Jan 2011 | 18 Huntington Dr | change new cabinet in kitchen, replace tile & sheetrock sink counter, toilet bathtub, same location in 2 bathroom @ 2nd floor. no walls to be relocated & no structural work, lighting change must w/cec 150 (k).Details
change new cabinet in kitchen, replace tile & sheetrock sink counter, toilet bathtub, same location in 2 bathroom @ 2nd floor. no walls to be relocated & no structural work, lighting change must w/cec 150 (k). | $10,300 |
| Mar 1, 2010 | Completed final sign-off Jan 2011 | 18 Huntington Dr | remodel lower/ garage floor. new laundry, two new bedrooms, new full bathroom, remove (e) rear door and infill for new windowDetails
remodel lower/ garage floor. new laundry, two new bedrooms, new full bathroom, remove (e) rear door and infill for new window | $15,000 |
| Feb 16, 2010 | Completed final sign-off Jun 2011 | 5116 Geary Bl | demo of non-structural walls. new partition walls, plumbing, electrical, lighting to accomodate dental rooms. storefront changes, handicap bathrooms.Details
demo of non-structural walls. new partition walls, plumbing, electrical, lighting to accomodate dental rooms. storefront changes, handicap bathrooms. | $80,000 |
| Oct 30, 2009 | Completed final sign-off Aug 2011 | 1338 Hampshire St | remodel existing kitchen, full bathroom and 2 bedrooms. add one full bathroom on 2nd fl unit 1338. install new gas furnace and water heater in garage for unit 1338. see pa 200906261438 for compliance w/ nov 200909371.Details
remodel existing kitchen, full bathroom and 2 bedrooms. add one full bathroom on 2nd fl unit 1338. install new gas furnace and water heater in garage for unit 1338. see pa 200906261438 for compliance w/ nov 200909371. | $35,000 |
| Jun 26, 2009 | Completed final sign-off Oct 2010 | 1338 Hampshire St | to comply with comp#200909371(kitchen and bath remodel interior). no change to wndows alteration. in unit 1338. replace kitchen sink, cabinet. replace toilet, tub, sink. install installation.Details
to comply with comp#200909371(kitchen and bath remodel interior). no change to wndows alteration. in unit 1338. replace kitchen sink, cabinet. replace toilet, tub, sink. install installation. | $17,000 |
| May 30, 2008 | Never finaled issued May 2008, no final | 771 24th Av | revision to 200802043865, relocate (e) bathroom, laundry room and voluntary foundation upgrade at rear of building. revise size of study room and closet. relocate door at hall.Details
revision to 200802043865, relocate (e) bathroom, laundry room and voluntary foundation upgrade at rear of building. revise size of study room and closet. relocate door at hall. | $5,000 |
| Jan 28, 2008 | Completed final sign-off May 2008 | 614 Persia Av | running electric wire, one new full bath, one bedroom,remodel and repartition one family room into bedroom and family room on ground floor.Details
running electric wire, one new full bath, one bedroom,remodel and repartition one family room into bedroom and family room on ground floor. | $25,000 |
| Aug 27, 2007 | Never finaled issued Aug 2007, no final | 380 07th Av | to add one playroom. one bedroom. one half bath room on existing ground floor per plan.Details
to add one playroom. one bedroom. one half bath room on existing ground floor per plan. | $18,000 |
| Jun 8, 2007 | Completed final sign-off Dec 2007 | 40 Nahua Av | horizontal addition: construct one story rear stairs down to groundfloor & rear yard. to add one bedroom, one playroom/laundry, one full bathroom and one storage on (e) groundfloor. to add one half bathroom on (e) 2nd floor per plan.Details
horizontal addition: construct one story rear stairs down to groundfloor & rear yard. to add one bedroom, one playroom/laundry, one full bathroom and one storage on (e) groundfloor. to add one half bathroom on (e) 2nd floor per plan. | $26,000 |
| Mar 16, 2007 | Never finaled issued Mar 2007, no final | 2447 27th Av | renovate extg rooms & powder room to a new master bedroom with full bath, reinforce wood beams at new master bedroom ceiling with new steel channels. remove and replace all dry rotted damage floor joists, studs and sheithing at garage level and lower roof at 2nd floorDetails
renovate extg rooms & powder room to a new master bedroom with full bath, reinforce wood beams at new master bedroom ceiling with new steel channels. remove and replace all dry rotted damage floor joists, studs and sheithing at garage level and lower roof at 2nd floor | $30,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2007 | 361 Fair Oaks St | kitchen - new cabinets, refinish floor, paint. bathroom-new tiling, paint. no structural work - in kind.Details
kitchen - new cabinets, refinish floor, paint. bathroom-new tiling, paint. no structural work - in kind. | $8,000 |
| Oct 10, 2006 | Completed final sign-off May 2007 | 41 Foote Av | add 2 bedrooms, 1 half bath, 1 storage/laundry room on existing ground floor per planDetails
add 2 bedrooms, 1 half bath, 1 storage/laundry room on existing ground floor per plan | $22,000 |
| Mar 14, 2006 | Completed final sign-off Jun 2006 | 530 Kansas St | remodel (e) bathroom & kitchen @ unit#2. provide flor light. new cabinets, counters, floors & walls as needed.Details
remodel (e) bathroom & kitchen @ unit#2. provide flor light. new cabinets, counters, floors & walls as needed. | $18,000 |