Sheldon W Doty General Contractor
- Based in
- Pacifica
- On San Francisco permits
- May 2011 to Mar 2017
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 45 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2012 | Completed final sign-off Sep 2012 | 1907 20th St | existing ground floor bathroom renovation within the same building footprint. removing existing shed wall to enlarge existing bathroom. legalize this bathroom.Details
existing ground floor bathroom renovation within the same building footprint. removing existing shed wall to enlarge existing bathroom. legalize this bathroom. | $10,000 |