Back to bathroom remodel contractors
Shaz Contruction And Design
- Based in
- Novato
- On San Francisco permits
- Nov 2016 to Oct 2018
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2018 | Expired or cancelled cancelled Dec 2018 | 3444 17th St | (e) bathroom i30sf remove tub shower surround tiles partial sheetrock new bath shower new tub surround walls. replace (e) light fixtures with led, no change on ele. no change or work on (e) sub panel. replace (e) fan with new. replace 5/8" type "x" sheetrockDetails
(e) bathroom i30sf remove tub shower surround tiles partial sheetrock new bath shower new tub surround walls. replace (e) light fixtures with led, no change on ele. no change or work on (e) sub panel. replace (e) fan with new. replace 5/8" type "x" sheetrock | $15,000 |