Shaul Shachar
- Based in
- Tarzana
- On San Francisco permits
- Jun 2013 to Aug 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2013 | Completed final sign-off Aug 2013 | 300 West Portal Av | suite b - erect a non-electric single faced wall signDetails
suite b - erect a non-electric single faced wall sign | $500 |
| Jul 29, 2013 | Completed final sign-off Aug 2013 | 300 West Portal Av | suite b -revision to appl #2013.06.11.9173: move new partition walls closer to entry, partition walls with 3' door. no longer installing sink, no longer remove one of the partition walls, relocate 3 outlets & 1 switch.Details
suite b -revision to appl #2013.06.11.9173: move new partition walls closer to entry, partition walls with 3' door. no longer installing sink, no longer remove one of the partition walls, relocate 3 outlets & 1 switch. | |
| Jun 11, 2013 | Completed final sign-off Aug 2013 | 300 West Portal Av | suite b:remove some partiton walls, add new cabinet and sink. add water cooler. new partiton walls with 3' doorDetails
suite b:remove some partiton walls, add new cabinet and sink. add water cooler. new partiton walls with 3' door | $9,000 |