Sgdm Llc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Aug 2023
- Last 24 months
- 0 permits filed
265 permits since 2000: 213 completed, 1 in progress, 31 never finaled, 20 expired or cancelled.
Of the 31 never-finaled permits, 3 are 3 to 5 years old, 26 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 707 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2020 | Completed final sign-off Mar 2025 | 862 42nd Av | new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62Details
new 55 sf horizontal addition @ 1st floor rear building.rebuild 325 sqft @ 1st floor rear-interior remodel 875 sqft @ 1st floor rear, rebuild deck 200 sqft @ 2nd floor rear- add new deck @ 2nd floor rear.add adu on first floor. per ordincance 162-62 | $150,000 |
| Jul 16, 2020 | Never finaled issued Jul 2020, no final | 530 Clipper St | repair rear deck in kind less than 50%. repair and replace 15sqft of dry rot. (deck size is 75sqft)Details
repair rear deck in kind less than 50%. repair and replace 15sqft of dry rot. (deck size is 75sqft) | $3,000 |
| May 12, 2017 | Completed final sign-off Sep 2017 | 243 Molimo Dr | deck repair - replace dry rot damaged lumber to pressure treated lumber. less than 50%Details
deck repair - replace dry rot damaged lumber to pressure treated lumber. less than 50% | $8,000 |
| May 10, 2017 | Expired or cancelled cancelled Jun 2017 | 230 Molimo Dr | deck repair; replace dryrot damaged lumber to pressure treated lumber less than 50%, like for like.Details
deck repair; replace dryrot damaged lumber to pressure treated lumber less than 50%, like for like. | $8,000 |