Permit GraphShortlistSan Francisco building permits since 2000

Sf Coast Side Construction Inc

Contractor license
982346
State license record
Based in
Alameda
On San Francisco permits
Jul 2024 to Aug 2024
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllKitchen remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 5, 2024Completed
final sign-off Mar 2025
59 Clipper Stkitchen remodel like for like. no removal of walls
Details
Permit
202408057953
Status
complete
Filed
Aug 5, 2024
Permit issued
Aug 5, 2024
Final sign-off
Mar 21, 2025
Declared cost
$80,000
Address
59 Clipper St

kitchen remodel like for like. no removal of walls

Open the permit page

$80,000
Jul 24, 2024Completed
final sign-off Mar 2025
59 Clipper Stremove existing sink, toilet, tile & tub. replace tub in kind with new tile. switch toilet & sink positions. new gfci for toilet/washlet. provide min 15" clr ea side and 24" front clearance for toilet.
Details
Permit
202407247190
Status
complete
Filed
Jul 24, 2024
Permit issued
Jul 24, 2024
Final sign-off
Mar 21, 2025
Declared cost
$7,000
Address
59 Clipper St

remove existing sink, toilet, tile & tub. replace tub in kind with new tile. switch toilet & sink positions. new gfci for toilet/washlet. provide min 15" clr ea side and 24" front clearance for toilet.

Open the permit page

$7,000