Back to bathroom remodel contractors
Sf Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2019 to Jul 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 12 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2026 | In progress issued Aug 2026 | 459 27th Av | new 2-story horizontal rear addition. new office and bathroom on 1/f. relocate kitchen and living from 2/f to 1/f. reconfig stairs, add master bedroom on 2/f.Details
new 2-story horizontal rear addition. new office and bathroom on 1/f. relocate kitchen and living from 2/f to 1/f. reconfig stairs, add master bedroom on 2/f. | $485,000 |
| Jun 20, 2024 | In progress issued Jul 2024 | 2645 Anza St | revision to bpa# 202401314952. remodel of powder bathroom and addition of shower, bring up to code. addition of stacked dryer and washer to kitchen remodel.Details
revision to bpa# 202401314952. remodel of powder bathroom and addition of shower, bring up to code. addition of stacked dryer and washer to kitchen remodel. | $28,500 |
| Jan 31, 2024 | Completed final sign-off Nov 2024 | 2645 Anza St | remodel of kitchen and bathroom in kind. new shower pan- bring electrical and plumbing up to code. installation of new interior doors and trim and painting of apartment. not moving walls, no layout change.Details
remodel of kitchen and bathroom in kind. new shower pan- bring electrical and plumbing up to code. installation of new interior doors and trim and painting of apartment. not moving walls, no layout change. | $42,000 |
| Mar 9, 2023 | Completed final sign-off Sep 2023 | 495 21st Av | remodel bathroom and kitchen in kind. install new cabinets and appliances. repaint whole apartment.Details
remodel bathroom and kitchen in kind. install new cabinets and appliances. repaint whole apartment. | $35,000 |
| Sep 10, 2020 | Completed final sign-off Jun 2021 | 2643 Anza St | remodel of kitchen and bath replaced in kind. new shower pan, led cans, cabinets countertopsDetails
remodel of kitchen and bath replaced in kind. new shower pan, led cans, cabinets countertops | $30,000 |
| Nov 7, 2019 | Completed final sign-off Jan 2020 | 3101 Buchanan St | remodel of bathroom. bring bathroom up to current code with building, plumbing and electrical. change tub into shower, toilet & sink stays in the same place. installation of 4 led cans and one pan and gfi plug. painting & tiling also. same size same locationDetails
remodel of bathroom. bring bathroom up to current code with building, plumbing and electrical. change tub into shower, toilet & sink stays in the same place. installation of 4 led cans and one pan and gfi plug. painting & tiling also. same size same location | $15,000 |
| Feb 7, 2019 | Completed final sign-off Apr 2019 | 497 21st Av | remodel of existing bathroom, change bathtub into shower encloser, bring up to title 24, install shower pan, vent fan through roof and vent microwave- exhaust fan through roof also install dishwasher, new closet in bathroom, replace replace closet door.Details
remodel of existing bathroom, change bathtub into shower encloser, bring up to title 24, install shower pan, vent fan through roof and vent microwave- exhaust fan through roof also install dishwasher, new closet in bathroom, replace replace closet door. | $14,500 |