Permit GraphShortlistSan Francisco building permits since 2000

Seton Pacific Construction

Contractor license
894714
State license record
Based in
San Francisco
On San Francisco permits
Jun 2014 to Dec 2020
Last 24 months
0 permits filed

5 permits since 2000: 4 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 5 have no building type on record and are shown as other.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Dec 17, 2020Completed
final sign-off Aug 2021
1532 Harrison Stinstall fire water from check valve to building. ref 2016-0725-3262 "s"-4, showing 10 feet of 6-inch pipe not included in original plans.
Details
Permit
202012171276
Permit issued
Mar 5, 2021
Final sign-off
Aug 4, 2021

install fire water from check valve to building. ref 2016-0725-3262 "s"-4, showing 10 feet of 6-inch pipe not included in original plans.

Open the permit page

$14,350
Aug 10, 2018Completed
final sign-off Mar 2019
1750 Mcallister Strevision to app#201509025870 (s4). remodel of existing highrise building. moving location of point of connection on city water main and back flow preventor- needs flush and hydro-.
Details
Permit
201808106998
Permit issued
Aug 15, 2018
Final sign-off
Mar 29, 2019

revision to app#201509025870 (s4). remodel of existing highrise building. moving location of point of connection on city water main and back flow preventor- needs flush and hydro-.

Open the permit page

$20,000
Oct 15, 2014Completed
final sign-off Nov 2014
45 Lansing Stinstall of 8" ductile iron fire water pipe, from the curb to the face of the building. t.i. pa#201009140800
Details
Permit
201410158947
Permit issued
Oct 16, 2014
Final sign-off
Nov 5, 2014

install of 8" ductile iron fire water pipe, from the curb to the face of the building. t.i. pa#201009140800

Open the permit page

$8,000
Jun 24, 2014Completed
final sign-off Jul 2014
8 Octavia Stinstalling 6 inch ductile iron fire water pipe from the curb to face of building. ref sprinkler app #2012.0803.6517-s5/r1
Details
Permit
201406249225
Permit issued
Jun 24, 2014
Final sign-off
Jul 7, 2014

installing 6 inch ductile iron fire water pipe from the curb to face of building. ref sprinkler app #2012.0803.6517-s5/r1

Open the permit page

$8,000
Jun 9, 2014Never finaled
issued Jun 2014, no final
8 Octavia Stinstallation of 6" di fire water line, installation from sfwd lateral to face of bldg. ref #2012.0803.6517/s-5.
Details
Permit
201406097813
Permit issued
Jun 9, 2014

installation of 6" di fire water line, installation from sfwd lateral to face of bldg. ref #2012.0803.6517/s-5.

Open the permit page

$8,000