Seth Alexander
- Based in
- Pinole, Ca 94564
- On San Francisco permits
- Apr 2006 to Mar 2024
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2024 | Completed final sign-off Nov 2024 | 2100 Green St | unit 202 - kitchen and bathroom renovation of non-load bearing wall in kitchenDetails
unit 202 - kitchen and bathroom renovation of non-load bearing wall in kitchen | $25,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2016 | 2100 Green St | unit 504: renovate 2 bedrooms, 2 bath apartment including kitchen. windows on separate permitDetails
unit 504: renovate 2 bedrooms, 2 bath apartment including kitchen. windows on separate permit | $150,800 |
| Sep 12, 2013 | Completed final sign-off Feb 2014 | 2100 Green St | unit #402-renovate full bathroom-relocate lavatory, sink, convert tub to shower. remove & replace interior non load bearing walls to facilitate plumbing work. install new tile, flooring & fixturesDetails
unit #402-renovate full bathroom-relocate lavatory, sink, convert tub to shower. remove & replace interior non load bearing walls to facilitate plumbing work. install new tile, flooring & fixtures | $9,800 |
| Sep 26, 2012 | Completed final sign-off Dec 2012 | 1940 Vallejo St | renovate master bedroom, bath including relocation of vanity and change tub to shower. relocate wall scone light and two gfci protected outlets on dedicated circuit. install marble in shower, floor and walls.Details
renovate master bedroom, bath including relocation of vanity and change tub to shower. relocate wall scone light and two gfci protected outlets on dedicated circuit. install marble in shower, floor and walls. | $24,500 |
| Aug 3, 2011 | Completed final sign-off Sep 2011 | 1438 Green St | renovate bath, replace vanities, shower, toilet, light fixtures, tile, and install radiant heat & flooring - electric radiant floor heat, mat < 2kw & controlled by less than 30 min time clock, lights to be high efficiency lights or controlled by "manuel on" occupancy sensor.Details
renovate bath, replace vanities, shower, toilet, light fixtures, tile, and install radiant heat & flooring - electric radiant floor heat, mat < 2kw & controlled by less than 30 min time clock, lights to be high efficiency lights or controlled by "manuel on" occupancy sensor. | $14,568 |
| Apr 11, 2006 | Completed final sign-off Aug 2006 | 214 15th Av | addition of storage space and half bath. 14 lights and 10 outlets.Details
addition of storage space and half bath. 14 lights and 10 outlets. | $15,000 |