Back to bathroom remodel contractors
Service Plus Construction & Restoration
- Based in
- Hayward
- On San Francisco permits
- Feb 2004 to Sep 2009
- Last 24 months
- 0 permits filed
17 permits since 2000: 9 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2005 | Completed final sign-off Jan 2006 | 1097 Green St | water damage repair; such as gen bldng drywall, electrical, plumbing, insulation repair in bath-bedrDetails
water damage repair; such as gen bldng drywall, electrical, plumbing, insulation repair in bath-bedr | $10,000 |
| Aug 3, 2005 | Completed final sign-off Jan 2006 | 1097 Green St | water damage repair-such as drywall, electrical, plumbing, insulation repair in bath, hall. bedrmsDetails
water damage repair-such as drywall, electrical, plumbing, insulation repair in bath, hall. bedrms | $15,000 |