Back to bathroom remodel contractors
Serge Colombeau Const
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Apr 2016
- Last 24 months
- 0 permits filed
114 permits since 2000: 91 completed, 7 never finaled, 16 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 13 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2014 | Never finaled issued Aug 2014, no final | 1681 Noe St | remove (e) bathroom & washer & dryer closet and relocate between living room & bedroom. modify structural support at (e) storage mezzanine.Details
remove (e) bathroom & washer & dryer closet and relocate between living room & bedroom. modify structural support at (e) storage mezzanine. | $12,000 |
| Dec 12, 2013 | Completed final sign-off May 2014 | 45 Joost Av | revision to pa# 201310088754 - add 2x6 to (e) framing at sun room - relocate pantry. remove from scope of work: (n) skylight at (e) cormer, bathroom, pantry, front door/window at 2/f, (n) stair from 1/f to 3/f, (e) stair to remain.Details
revision to pa# 201310088754 - add 2x6 to (e) framing at sun room - relocate pantry. remove from scope of work: (n) skylight at (e) cormer, bathroom, pantry, front door/window at 2/f, (n) stair from 1/f to 3/f, (e) stair to remain. | $3,500 |
| Oct 8, 2013 | Completed final sign-off Jun 2014 | 45 Joost Av | remodel (e) 2nd fl entry and relocate front door. remodel kitchen and dining room. convert (e) 2nd fl utility rooms to a sun room. new stair from 1st through 3rd fl, remodel bath at 2nd and 3rd fl. new closets at 3rd flDetails
remodel (e) 2nd fl entry and relocate front door. remodel kitchen and dining room. convert (e) 2nd fl utility rooms to a sun room. new stair from 1st through 3rd fl, remodel bath at 2nd and 3rd fl. new closets at 3rd fl | $45,000 |
| Apr 6, 2012 | Completed final sign-off Jul 2012 | 434 36th Av | bathroom remodeling, no structural work, replace shower pan, vanity, toilet and tile, new lighting comply with cec150(k)Details
bathroom remodeling, no structural work, replace shower pan, vanity, toilet and tile, new lighting comply with cec150(k) | $11,000 |
| Feb 6, 2012 | Completed final sign-off May 2012 | 521 Hill St | remodeling a kitchen and one bathroom, no structural work, replace cabinets and appliances, tub and vanity, no wall relocation, kitchen area 18'x12', bathroom area 8'x6' lighting must comply with 150(k)Details
remodeling a kitchen and one bathroom, no structural work, replace cabinets and appliances, tub and vanity, no wall relocation, kitchen area 18'x12', bathroom area 8'x6' lighting must comply with 150(k) | $21,000 |
| Oct 17, 2011 | Completed final sign-off Jan 2012 | 75 Loraine Ct | remodel main floor bathroom and poweder room. no structuDetails
remodel main floor bathroom and poweder room. no structu | $15,000 |
| Feb 11, 2011 | Completed final sign-off Jun 2011 | 230 San Jose Av | remodel (e) 3rd floor one bedroom flat; remodel kitchen & bathroom, (n) heat system, (n) electrical outlets in living room & dining room. replace existing windows @ front & side on 3rd floor. in kind.Details
remodel (e) 3rd floor one bedroom flat; remodel kitchen & bathroom, (n) heat system, (n) electrical outlets in living room & dining room. replace existing windows @ front & side on 3rd floor. in kind. | $21,500 |
| Aug 17, 2009 | Completed final sign-off Mar 2010 | 1143 Diamond St | rev. to pa# 2009.06.18.0699 to add full bath in existing conditioned space at garage level, replace rear foundation and dry rot repair at existing upper level deck.Details
rev. to pa# 2009.06.18.0699 to add full bath in existing conditioned space at garage level, replace rear foundation and dry rot repair at existing upper level deck. | $20,000 |
| Aug 11, 2009 | Completed final sign-off Dec 2009 | 80 Diamond St | remodeling bathroom at top floor, retile shower and floor, replace 2 vanities, all fixtures remain in same location, no structural wall affectedDetails
remodeling bathroom at top floor, retile shower and floor, replace 2 vanities, all fixtures remain in same location, no structural wall affected | $18,000 |
| Apr 28, 2008 | Completed final sign-off Oct 2008 | 1524 Willard St | 1st floor: remodel laundry room & half bath; adding one non-bearing wall between bath & laundry room, close-off one existing window. replace kitchen appliances & oven cabinet; add upper bedroom heating duct from basement to 2nd floor. 2nd floor: replace toilet in kind on 2nd floor.Details
1st floor: remodel laundry room & half bath; adding one non-bearing wall between bath & laundry room, close-off one existing window. replace kitchen appliances & oven cabinet; add upper bedroom heating duct from basement to 2nd floor. 2nd floor: replace toilet in kind on 2nd floor. | $15,000 |
| Apr 5, 2007 | Expired or cancelled expired Feb 2008 | 569 Darien Wy | bathroom: add a skylight to app 200703196643Details
bathroom: add a skylight to app 200703196643 | $1,200 |
| Mar 19, 2007 | Expired or cancelled expired Feb 2008 | 569 Darien Wy | bathroom remodeling, replace one window. add washer & dryer.Details
bathroom remodeling, replace one window. add washer & dryer. | $15,000 |
| Sep 18, 2002 | Completed final sign-off Nov 2002 | 2475 16th Av | bathrm remodeling. replace bath tub. reinstall varity. new floor tile. same layoutDetails
bathrm remodeling. replace bath tub. reinstall varity. new floor tile. same layout | $8,000 |
| Feb 7, 2002 | Completed final sign-off Apr 2002 | 184 Parnassus Av | remodel bathroom, remove 1 closet+wall between kitchen/dining room, add 1 bathroomDetails
remodel bathroom, remove 1 closet+wall between kitchen/dining room, add 1 bathroom | $16,000 |
| Feb 21, 2001 | Completed final sign-off Apr 2001 | 498 Waller St | bathroom remodeling. replace fixtures, wall & floor tile.Details
bathroom remodeling. replace fixtures, wall & floor tile. | $4,500 |
| Oct 24, 2000 | Completed final sign-off Dec 2000 | 2645 Scott St | bathroom remodelingDetails
bathroom remodeling | $6,500 |
| May 11, 2000 | Expired or cancelled expired Sep 2000 | 1619 Florida St | frame & drywall, bathroom, closet and walls.Details
frame & drywall, bathroom, closet and walls. | $3,500 |