Permit GraphShortlistSan Francisco building permits since 2000

Sequoia Bay Construction Inc

Contractor license
1126079
State license record
Based in
Burlingame
On San Francisco permits
Sep 2022 to Oct 2026
Last 24 months
6 permits filed

8 permits since 2000: 3 completed, 5 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 3Stairs 2Kitchen remodel 2Bathroom remodel 3

3 bathroom remodel permits: 1 completed, 2 in progress. Typically 358 days from filing to permit and 354 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 27, 2025In progress
issued Dec 2025
2263 28th Avremodel/rearrange kitchen, living, dining, kitchen, bath & bedrooms.add 1-1/2 bath;remove stairs on 2/f. add deck at rear.add 2 beds,media w/ kitchenette,2 full bathroom & laundry on 1/f.replace wdw & doors.upgrade electrical & plumbing system.replce w/h & furnace, infill patio.
Details
Permit
202508274020
Status
issued
Filed
Aug 27, 2025
Permit issued
Dec 11, 2025
Declared cost
$200,000
Address
2263 28th Av

remodel/rearrange kitchen, living, dining, kitchen, bath & bedrooms.add 1-1/2 bath;remove stairs on 2/f. add deck at rear.add 2 beds,media w/ kitchenette,2 full bathroom & laundry on 1/f.replace wdw & doors.upgrade electrical & plumbing system.replce w/h & furnace, infill patio.

Open the permit page

$200,000
Jul 26, 2023Completed
final sign-off Jul 2025
271 Monticello Stlegalize ground level partial garage storage area into habitable space. the proposed habitable space shall have a play room, a bedroom with a closet, a 3 fixture full bathroom, and a storage room. total proposed fl area is 688 sq ft. provide heating source and a tank-less water heater to ground fl.
Details
Permit
202307263041
Status
complete
Filed
Jul 26, 2023
Permit issued
Jul 18, 2024
Final sign-off
Jul 7, 2025
Declared cost
$70,000
Address
271 Monticello St

legalize ground level partial garage storage area into habitable space. the proposed habitable space shall have a play room, a bedroom with a closet, a 3 fixture full bathroom, and a storage room. total proposed fl area is 688 sq ft. provide heating source and a tank-less water heater to ground fl.

Open the permit page

$70,000
Sep 16, 2022In progress
issued May 2024
2122 41st Avremodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property.
Details
Permit
202209162650
Status
issued
Filed
Sep 16, 2022
Permit issued
May 6, 2024
Declared cost
$125,000
Address
2122 41st Av

remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property.

Open the permit page

$125,000