Selvig Development
- Based in
- San Anselmo
- On San Francisco permits
- Apr 2015 to Dec 2024
- Last 24 months
- 2 permits filed
16 permits since 2000: 6 completed, 2 in progress, 8 never finaled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 31 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 26, 2017 | Completed final sign-off Oct 2017 | 974 Union St | 50% or less repair, 604 inspection repair to roof top access "bridge", patch/fill surface rot, replace deck boards & railing, brush & paint rusted fasteners & plates. paint or cover main beams on weather sides. not visable from street.Details
50% or less repair, 604 inspection repair to roof top access "bridge", patch/fill surface rot, replace deck boards & railing, brush & paint rusted fasteners & plates. paint or cover main beams on weather sides. not visable from street. | $15,000 |