Back to bathroom remodel contractors
Seddon Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Dec 2025
- Last 24 months
- 1 permit filed
32 permits since 2000: 26 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2025 | Completed final sign-off Apr 2026 | 1020 Vallejo St | unit #3: remodel (e) bathroom. remove and replace tub, vanity & tile.Details
unit #3: remodel (e) bathroom. remove and replace tub, vanity & tile. | $10,000 |
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 2542 Hyde St | remodel kitchen, full bath, install 1/2 bath on 1st fl. no change of layoutDetails
remodel kitchen, full bath, install 1/2 bath on 1st fl. no change of layout | $38,000 |
| Feb 9, 2017 | Completed final sign-off Sep 2021 | 2540 Hyde St | 1 w/c (toilet with sink), 1 light, 1 fan, 1 gfci - no structural work. halft bath at 1st floor.Details
1 w/c (toilet with sink), 1 light, 1 fan, 1 gfci - no structural work. halft bath at 1st floor. | $8,000 |
| Mar 7, 2016 | Completed final sign-off Aug 2016 | 2957 Divisadero St | repair interior spaces where water damages occured - repair interior spaces, replace sheetrock, replace electrical fixtures as needed, r/r powder sink, r/r vanity sink, toilet in master bath,; paint; add smoke detectors/co to meet code, add outlets to meet code.Details
repair interior spaces where water damages occured - repair interior spaces, replace sheetrock, replace electrical fixtures as needed, r/r powder sink, r/r vanity sink, toilet in master bath,; paint; add smoke detectors/co to meet code, add outlets to meet code. | $236,550 |
| Dec 19, 2013 | Completed final sign-off Dec 2015 | 2550 Hyde St | remodel kitchen, laundry 1 1/2 baths (e) exh fan to remain, new plumbing, wiring layout to remain the same, no walls to be moved or added, all lighting shall comply with cec150kDetails
remodel kitchen, laundry 1 1/2 baths (e) exh fan to remain, new plumbing, wiring layout to remain the same, no walls to be moved or added, all lighting shall comply with cec150k | $40,000 |
| Jan 25, 2013 | Completed final sign-off Nov 2013 | 2006 Washington St | remodel kitchen and one bath - non structural. no exterior work.Details
remodel kitchen and one bath - non structural. no exterior work. | $75,000 |
| Oct 2, 2012 | Expired or cancelled expired May 2026 | 2546 Hyde St | remodel kitchen and 1/2 bath, new cabinets, appliances, new gas line, new elec subpanel and wiring. new hot and cold water piping. deferred maintenance. no change on wallsDetails
remodel kitchen and 1/2 bath, new cabinets, appliances, new gas line, new elec subpanel and wiring. new hot and cold water piping. deferred maintenance. no change on walls | $15,000 |
| Jan 29, 2007 | Completed final sign-off Apr 2007 | 2548 Hyde St | remodel existing kitchen & half bath. remove/replace fixtures, cabinets & appliances. flourescent lighting.Details
remodel existing kitchen & half bath. remove/replace fixtures, cabinets & appliances. flourescent lighting. | $17,000 |
| Jan 23, 2002 | Completed final sign-off Aug 2002 | 1921 Sacramento St | remodel exist bathrooms(2)-in 2nd fl. new sheetrock & cabinet works, all work interior, no exteriorDetails
remodel exist bathrooms(2)-in 2nd fl. new sheetrock & cabinet works, all work interior, no exterior | $80,000 |
| Jun 7, 2000 | Expired or cancelled expired Dec 2000 | 1921 Sacramento St | remodel bathroom on first floor, powder roomDetails
remodel bathroom on first floor, powder room | $10,000 |