Back to bathroom remodel contractors
Sebastian Nichols Design Build
- Based in
- San Francisco
- On San Francisco permits
- Jan 2017 to May 2019
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 692 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2017 | Completed final sign-off Oct 2017 | 383 Lombard St | demo (e) bathroom down to studs. install new shower fixtures, new tub with tub surround, install new drywall where needed, new vanity medicine cabinet and continue (e) engineered hardwood floorsDetails
demo (e) bathroom down to studs. install new shower fixtures, new tub with tub surround, install new drywall where needed, new vanity medicine cabinet and continue (e) engineered hardwood floors | $10,000 |
| Feb 21, 2017 | Completed final sign-off Sep 2020 | 425 01st St | one bath remodel: demo (e) tile, tub and vanity in bathroom. re-tile tub surround, floor and back wall with new tile. install new tub, vanity and toilet. non-structural.Details
one bath remodel: demo (e) tile, tub and vanity in bathroom. re-tile tub surround, floor and back wall with new tile. install new tub, vanity and toilet. non-structural. | $10,000 |
| Jan 19, 2017 | Expired or cancelled expired Sep 2019 | 11 Santa Fe Av | voluntary structural upgrade and remodel of lower level as habitable space. new master bedroom, media and master bath on the ground floor. remove 5 cubic yard off material in backyard.Details
voluntary structural upgrade and remodel of lower level as habitable space. new master bedroom, media and master bath on the ground floor. remove 5 cubic yard off material in backyard. | $10,000 |