Back to bathroom remodel contractors
Seapoint Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to May 2026
- Last 24 months
- 3 permits filed
38 permits since 2000: 24 completed, 2 in progress, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 1 in progress, 2 never finaled. Typically 61 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued May 2026 | 2708 Union St | 2 bathroom remodels, remove all finished, new plumbing and electrical, new drywall, tiles, paint. new insulationDetails
2 bathroom remodels, remove all finished, new plumbing and electrical, new drywall, tiles, paint. new insulation | $70,000 |
| Oct 23, 2025 | Completed final sign-off Apr 2026 | 1187 Stanyan St | in-kind remodeling of 5 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 2 shower pan(s).Details
in-kind remodeling of 5 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 2 shower pan(s). | $150,000 |
| Mar 14, 2023 | Completed final sign-off Aug 2023 | 1950 Mcallister St | apt 2: new kitchen and bathroom remodel ,new paint, tile and kitchen cabinets, new bathroom vanity. no exterior work. no changes to wall layout.Details
apt 2: new kitchen and bathroom remodel ,new paint, tile and kitchen cabinets, new bathroom vanity. no exterior work. no changes to wall layout. | $30,000 |
| Nov 17, 2022 | Completed final sign-off May 2026 | 161 Beaver St | remodel one bedroom,2 baths,1 kitchen,reconstruct laundry room fl,northwall and roof,add gangway(sloping roof deck)over new laundry roof(laundry room in kind const)no increase in footprint or height)add iron spiral stair from(e) lower patio to(e)upper deck.Details
remodel one bedroom,2 baths,1 kitchen,reconstruct laundry room fl,northwall and roof,add gangway(sloping roof deck)over new laundry roof(laundry room in kind const)no increase in footprint or height)add iron spiral stair from(e) lower patio to(e)upper deck. | $62,455 |
| May 25, 2022 | Completed final sign-off Oct 2024 | 4340 25th St | interior remodel at ground floor - addition of new kitchen, new bathroom and storage area at ground floor. **building envelope will not be englarged. no new unit added.Details
interior remodel at ground floor - addition of new kitchen, new bathroom and storage area at ground floor. **building envelope will not be englarged. no new unit added. | $50,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2024 | 4338 25th St | replace rear decks on 1st and 2nd floor. kitchen and existing bath renovation.Details
replace rear decks on 1st and 2nd floor. kitchen and existing bath renovation. | $45,000 |
| May 12, 2020 | Completed final sign-off Sep 2020 | 3431 Fillmore St | kitchen bath remodel. new kitchen cabinets, replace in kind. new recessed cans in ceiling. partial bath remodel. replace tile in guest bath floor and shower area and install new recessed cans and fan in ceilingDetails
kitchen bath remodel. new kitchen cabinets, replace in kind. new recessed cans in ceiling. partial bath remodel. replace tile in guest bath floor and shower area and install new recessed cans and fan in ceiling | $32,450 |
| Dec 17, 2019 | Completed final sign-off Feb 2023 | 716 41st Av | comply w/ nov #201995372: leglaize bedroom & bathroom on ground floor and rear deck. check plumbing & electrical work are to current code. restore gargage door opening to a min. 7'-6" width.Details
comply w/ nov #201995372: leglaize bedroom & bathroom on ground floor and rear deck. check plumbing & electrical work are to current code. restore gargage door opening to a min. 7'-6" width. | $8,500 |
| Dec 21, 2018 | Completed final sign-off Apr 2022 | 64 Potomac St | interior renovation of kitchen and e bath 2nd fl add new bath at 2nd fl. new structural posts and bems to accomomodate partition changes. remove e chimney, install 4 new windows rear. replace 8 windows in kindDetails
interior renovation of kitchen and e bath 2nd fl add new bath at 2nd fl. new structural posts and bems to accomomodate partition changes. remove e chimney, install 4 new windows rear. replace 8 windows in kind | $125,000 |
| Sep 5, 2018 | Completed final sign-off Oct 2018 | 219 Lake St | bathroom remodel. change out shower fixturs, add 2x lights, new insulation and sheetrock, tiles, and paint. no change of existing floor plan.Details
bathroom remodel. change out shower fixturs, add 2x lights, new insulation and sheetrock, tiles, and paint. no change of existing floor plan. | $3,500 |
| Apr 19, 2018 | Completed final sign-off Apr 2023 | 59 Potomac St | 3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim.Details
3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim. | $671,500 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 3433 Fillmore St | partial bathroom remodeling: replace tile in guest bathroom shower area and floor.Details
partial bathroom remodeling: replace tile in guest bathroom shower area and floor. | $7,500 |
| Feb 2, 2016 | Never finaled issued Dec 2017, no final | 68 Pierce St | rear addition and house renovation including adding living space in attic with 2 bedrooms & 1 bath.Details
rear addition and house renovation including adding living space in attic with 2 bedrooms & 1 bath. | $260,000 |