Sean Michael Mchugh Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to Jun 2024
- Last 24 months
- 0 permits filed
31 permits since 2000: 19 completed, 2 in progress, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 expired or cancelled. Typically 168 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2023 | Expired or cancelled expired Feb 2026 | 438 Vicksburg St | new deck at 3rd fl (horizontal addition). new door and clerestory window at bedroom 3.Details
new deck at 3rd fl (horizontal addition). new door and clerestory window at bedroom 3. | $10,000 |
| Sep 27, 2022 | Expired or cancelled expired Feb 2026 | 438 Vicksburg St | replace structural foundation on 1/f. convert portion of (e) garage to conditioned space. replace rear yard stairs to 2/f with 2/f deck within rear yard setback. bath and kitchen interior remodel. add interior stairs from 1/f to 2/f. no addition.Details
replace structural foundation on 1/f. convert portion of (e) garage to conditioned space. replace rear yard stairs to 2/f with 2/f deck within rear yard setback. bath and kitchen interior remodel. add interior stairs from 1/f to 2/f. no addition. | $300,000 |