Back to bathroom remodel contractors
Sean Carroll
- Based in
- Concord
- On San Francisco permits
- Jan 2021 to May 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2021 | Never finaled issued Jan 2021, no final | 880 Corbett Av | remodeling 3 bathrooms with new vanities, floor and wall tile, bath tubs, plumbing fixtures. replacing bathroom vent fans, replacing all flooring through house. no fire alarm.Details
remodeling 3 bathrooms with new vanities, floor and wall tile, bath tubs, plumbing fixtures. replacing bathroom vent fans, replacing all flooring through house. no fire alarm. | $120,000 |