Seamus Melaugh Construction
- Based in
- Millbrae
- On San Francisco permits
- Feb 2022 to Jul 2026
- Last 24 months
- 6 permits filed
8 permits since 2000: 2 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 in progress. Typically 740 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2023 | In progress issued Sep 2024 | 1701 Broderick St | foundation update for lvel 1 addition (unit 1701): (n) bath , kitchenette, bedroom. level 2 & 3 (unit 1703): renovation to (e) floor plan layouts. (n) level 3 interior stair to roof deck. (n) roof deck w/ pop up stair & trellis. 2nd fl rear deckDetails
foundation update for lvel 1 addition (unit 1701): (n) bath , kitchenette, bedroom. level 2 & 3 (unit 1703): renovation to (e) floor plan layouts. (n) level 3 interior stair to roof deck. (n) roof deck w/ pop up stair & trellis. 2nd fl rear deck | $150,000 |
| Feb 11, 2022 | Completed final sign-off Aug 2025 | 70 Malta Dr | to comply with nov# 202066061. full replacement of rear deck at second, ground and basement floor. no changes in dimensions. convert (e) cantilever decks to be simply supported with new structural post.Details
to comply with nov# 202066061. full replacement of rear deck at second, ground and basement floor. no changes in dimensions. convert (e) cantilever decks to be simply supported with new structural post. | $35,000 |