Scott Donaldson
- Based in
- Fairfax
- On San Francisco permits
- May 2022 to Aug 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2022 | Completed final sign-off Oct 2022 | 531 47th Av | one bath remodel. full gut existing one bathroom remodel. reset shower and vanity and toilet. new lighting, exaust fan , new plumbing for new fiztures. tile one replacement replace one window (same size/location) shower and curb.Details
one bath remodel. full gut existing one bathroom remodel. reset shower and vanity and toilet. new lighting, exaust fan , new plumbing for new fiztures. tile one replacement replace one window (same size/location) shower and curb. | $35,000 |
| May 18, 2022 | Completed final sign-off Nov 2023 | 170 Liberty St | kitchen remodel. demolition as indicated on plans. plumbing, mechanical, electrical modifications as required/indicated. no structural work.Details
kitchen remodel. demolition as indicated on plans. plumbing, mechanical, electrical modifications as required/indicated. no structural work. | $52,000 |