Back to bathroom remodel contractors
Schrobsdorff Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2011 to Aug 2026
- Last 24 months
- 8 permits filed
96 permits since 2000: 49 completed, 6 in progress, 26 never finaled, 15 expired or cancelled.
Of the 26 never-finaled permits, 4 are 3 to 5 years old, 10 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 10 completed, 9 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2024 | Completed final sign-off Dec 2024 | 1767 48th Av | 2/f: remodel (e) kitchen, (e) bathroom, new toilet room and new door to the (e) rear den.Details
2/f: remodel (e) kitchen, (e) bathroom, new toilet room and new door to the (e) rear den. | $55,000 |
| Jun 10, 2024 | Completed final sign-off Jul 2024 | 125 20th Av | 1st floor: reduction in scope to pa 2022-1116-6667: non structural wall in dressing room and kitchen to remain. new bathroom layoutDetails
1st floor: reduction in scope to pa 2022-1116-6667: non structural wall in dressing room and kitchen to remain. new bathroom layout | |
| Feb 3, 2023 | Never finaled issued Feb 2023, no final | 571 Ivy St | flood damaged repair to bathroom- shower, sheetrock, tile, toilet.Details
flood damaged repair to bathroom- shower, sheetrock, tile, toilet. | $10,000 |
| Dec 19, 2022 | Never finaled issued Dec 2022, no final | 180 Grattan St | revision to pa#2022-0601-5351 fire damage repair,interior work- to 180 grattan-move living room, enlarge opening along grid 1.5, move toilet closet, dry rot reapairr to rear wing. 182 gratton: revise kitchen layout, covert 1/2 bath to full,dry rot repair at rear wing. 184 gratton: same scope as 182Details
revision to pa#2022-0601-5351 fire damage repair,interior work- to 180 grattan-move living room, enlarge opening along grid 1.5, move toilet closet, dry rot reapairr to rear wing. 182 gratton: revise kitchen layout, covert 1/2 bath to full,dry rot repair at rear wing. 184 gratton: same scope as 182 | $40,000 |
| Nov 16, 2022 | Completed final sign-off Jul 2024 | 125 20th Av | unit 125 - non-structural kitchen bathroom remodel; new kitchen & bat remodel; infill (e) window @ side of bldg & enlarge window @ rear of bldg; relocate (e) tankless hwh. mechanical electrical & plumbing to be design build under separate permitDetails
unit 125 - non-structural kitchen bathroom remodel; new kitchen & bat remodel; infill (e) window @ side of bldg & enlarge window @ rear of bldg; relocate (e) tankless hwh. mechanical electrical & plumbing to be design build under separate permit | $98,000 |
| Jun 14, 2021 | Completed final sign-off Jul 2024 | 320 San Carlos St | level 2: remodel of (e) laundry room and closet. new bathroom addition and reconfiguration of laundry and closet. new plumbing includes new water closet, new faucet, new shower, dryer exhaust and washer supply. relocate drain. new electrical includes new ligthing and vanity. new led recessesDetails
level 2: remodel of (e) laundry room and closet. new bathroom addition and reconfiguration of laundry and closet. new plumbing includes new water closet, new faucet, new shower, dryer exhaust and washer supply. relocate drain. new electrical includes new ligthing and vanity. new led recesses | $25,000 |
| Dec 16, 2020 | Never finaled issued Jun 2021, no final | 3763 17th St | remodel (e) closet, convert (e) window in closet to a door. (e) water heater will be moved & replaced w/ tankless. a (n) bathroom will be added in (e) footprint. bathroom will consist of toilet, sink & shower. (n) electrical, lighting & plumbing. bldg does not have fire sprinklers.Details
remodel (e) closet, convert (e) window in closet to a door. (e) water heater will be moved & replaced w/ tankless. a (n) bathroom will be added in (e) footprint. bathroom will consist of toilet, sink & shower. (n) electrical, lighting & plumbing. bldg does not have fire sprinklers. | $50,000 |
| Mar 13, 2020 | Never finaled issued May 2020, no final | 1496 La Playa | remodel 3 bathrooms, add new bath, remodel kitchen. install posts and beams. seismic upgrade. remove and replace all sheetrock to install shearwalls. replace elec and plumbingDetails
remodel 3 bathrooms, add new bath, remodel kitchen. install posts and beams. seismic upgrade. remove and replace all sheetrock to install shearwalls. replace elec and plumbing | $120,000 |
| Aug 23, 2019 | Never finaled issued Aug 2019, no final | 1727 Oakdale Av | remodel bathroom at upper floor. replace in kind. size 6' x 10'Details
remodel bathroom at upper floor. replace in kind. size 6' x 10' | $10,000 |
| Jul 29, 2019 | Never finaled issued Jul 2019, no final | 1366 05th Av | remodel (2) kitchens. no wall removal, unit 1 and 3. remodel (1) bath in unit 1Details
remodel (2) kitchens. no wall removal, unit 1 and 3. remodel (1) bath in unit 1 | $18,000 |
| Feb 2, 2018 | Expired or cancelled expired Sep 2026 | 472 Tehama St | proposed retail. remodel 1st floor to include garage, loading room, ada bathroom, prep kitchen, retail room please note per planning department the existing use at the site is industrial; n/a maherDetails
proposed retail. remodel 1st floor to include garage, loading room, ada bathroom, prep kitchen, retail room please note per planning department the existing use at the site is industrial; n/a maher | $50,000 |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 2 Fallon Pl | replace tub surround in-kind at bathroom: scope of work limited to the tile replacement around bath tub only, no other construction work. n/a maherDetails
replace tub surround in-kind at bathroom: scope of work limited to the tile replacement around bath tub only, no other construction work. n/a maher | $900 |
| Feb 14, 2017 | Completed final sign-off Feb 2018 | 691 14th St | alter existing restroom to create ada code compliant bathroom. per planning code existing use grocery and liquor store. barrier removal. per planning code, existing use grocery and liquor storeDetails
alter existing restroom to create ada code compliant bathroom. per planning code existing use grocery and liquor store. barrier removal. per planning code, existing use grocery and liquor store | $10,000 |
| Jun 1, 2016 | Completed final sign-off May 2017 | 3547 21st St | remodel 2 existing bathroomsDetails
remodel 2 existing bathrooms | $35,000 |
| Apr 12, 2016 | Completed final sign-off Apr 2017 | 4908 California St | remodel kitchen, add a new full bath, relocate laundry room, replace 11 window, not visable from streetDetails
remodel kitchen, add a new full bath, relocate laundry room, replace 11 window, not visable from street | $30,000 |
| Jul 15, 2015 | Completed final sign-off Jan 2016 | 2070 16th Av | remodel bathroom, replace tub, toilet & vanity,install new wallboard, insulation & tile, no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
remodel bathroom, replace tub, toilet & vanity,install new wallboard, insulation & tile, no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $11,200 |
| May 5, 2014 | Expired or cancelled expired Sep 2025 | 4150 17th St | replace kitchen counters & cabinets. replace shower valve in (2 baths, replace (1) tub. tile shower & bath tub surround & floorDetails
replace kitchen counters & cabinets. replace shower valve in (2 baths, replace (1) tub. tile shower & bath tub surround & floor | $15,000 |
| Sep 23, 2013 | Never finaled issued Sep 2013, no final | 3060 24th Av | remodel (1) bathroom. all fixtures to be replaced in kind. no change in opening and wall layout . lighting shall be high efficacy or controlled by manual on sensors.Details
remodel (1) bathroom. all fixtures to be replaced in kind. no change in opening and wall layout . lighting shall be high efficacy or controlled by manual on sensors. | $6,000 |
| Apr 15, 2013 | Never finaled issued Apr 2013, no final | 553 34th Av | remodel (1) kitchen & (2) bathrooms. replace in-kind. replace (7) aluminum windows w/ vinyl. on side street. all opening to remain same size. kitchen-replace cabinets counter wall board & floor. no structural change. bathrms replace fixts & tiles. no structural change. some windows are visible fromDetails
remodel (1) kitchen & (2) bathrooms. replace in-kind. replace (7) aluminum windows w/ vinyl. on side street. all opening to remain same size. kitchen-replace cabinets counter wall board & floor. no structural change. bathrms replace fixts & tiles. no structural change. some windows are visible from | $45,000 |
| Jul 16, 2012 | Completed final sign-off May 2014 | 2267 37th Av | remodel bathroom including tub with showerDetails
remodel bathroom including tub with shower | $11,000 |
| Dec 28, 2011 | Completed final sign-off Mar 2012 | 14 Seymour St | revision to pa #201109295740. first floor: reconfigure floor plan (14 seymour). install (n) 44m btu furnace and relocate (e) water heater. demo (e) full bath and construct (n) 1/2 bath. second floor (16 seymour st). no work. third floor (18 seymour st). no work.Details
revision to pa #201109295740. first floor: reconfigure floor plan (14 seymour). install (n) 44m btu furnace and relocate (e) water heater. demo (e) full bath and construct (n) 1/2 bath. second floor (16 seymour st). no work. third floor (18 seymour st). no work. | $8,000 |