Schilber & Schilber Inc
- Based in
- Modesto
- On San Francisco permits
- Dec 2019 to Dec 2019
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 26, 2019 | Never finaled issued Dec 2020, no final | 2544 03rd St | establish designated cannabis smoking lounge at main floor and lower level floor of extg retail and medical cannabis dispensary. electrical, sprinkler, and hvac on seperate permits.Details
establish designated cannabis smoking lounge at main floor and lower level floor of extg retail and medical cannabis dispensary. electrical, sprinkler, and hvac on seperate permits. | $4,200 |