Schikore Construction
- Based in
- Petaluma
- On San Francisco permits
- Feb 2000 to Jan 2011
- Last 24 months
- 0 permits filed
52 permits since 2000: 37 completed, 1 never finaled, 14 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 52 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2009 | Completed final sign-off Aug 2009 | 21 Napier Ln | no change in stair configuration. approx. (3x) 5'x25'. dry rot repairs on front and rear decks/stairs. less 50% total. replace in kind. replace deck boards, handrail, landing, framing, some trads, somo posts. all repairs in kind.Details
no change in stair configuration. approx. (3x) 5'x25'. dry rot repairs on front and rear decks/stairs. less 50% total. replace in kind. replace deck boards, handrail, landing, framing, some trads, somo posts. all repairs in kind. | $6,000 |
| May 10, 2006 | Completed final sign-off Jul 2006 | 261 Filbert St | (filbert st condo assoc) dryrot repair at entry decks and balconys. less thatn 50% to be replaced. repair in kind.Details
(filbert st condo assoc) dryrot repair at entry decks and balconys. less thatn 50% to be replaced. repair in kind. | $31,000 |