Scale-Corp
- Based in
- San Francisco
- On San Francisco permits
- Dec 2021 to Oct 2024
- Last 24 months
- 2 permits filed
31 permits since 2000: 28 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 1 in progress, 1 expired or cancelled. Typically 19 days from filing to permit and 64 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2023 | In progress issued Dec 2023 | 105 Lakeview Av | installation of new concrete footing l post at front & rear of property. stairs & rear deck under separate permit.Details
installation of new concrete footing l post at front & rear of property. stairs & rear deck under separate permit. | $6,000 |
| Mar 24, 2023 | Completed final sign-off Jun 2023 | 2171 Pacific Av | to correct scope of work under pa#2018-0815-7444 & 2018-0924-1229; original permits show 50% replacement in kind due to extent of water damage (e) decks 2 decks had to be replaced in kind 100% strenthen the (e) installed guard rail post all roof decks are part of the original constructionDetails
to correct scope of work under pa#2018-0815-7444 & 2018-0924-1229; original permits show 50% replacement in kind due to extent of water damage (e) decks 2 decks had to be replaced in kind 100% strenthen the (e) installed guard rail post all roof decks are part of the original construction | $15,000 |
| Feb 7, 2023 | Expired or cancelled cancelled Jan 2026 | 2171 Pacific Av | add 6 braces to 2 deparate decks on roof top per plans. to reinforce guardrails.Details
add 6 braces to 2 deparate decks on roof top per plans. to reinforce guardrails. | $10,000 |