Back to bathroom remodel contractors
Saturn Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Aug 2026
- Last 24 months
- 23 permits filed
309 permits since 2000: 245 completed, 18 in progress, 32 never finaled, 14 expired or cancelled.
Of the 32 never-finaled permits, 17 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
92 bathroom remodel permits: 83 completed, 2 in progress, 5 never finaled, 2 expired or cancelled. Typically 6 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | In progress issued Jan 2026 | 145 Ulloa St | interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath,Details
interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath, | $425,000 |
| Jan 16, 2025 | Completed final sign-off Sep 2026 | 1631 Grove St | 3 story remodel: new office, office bath, game room, laundry, new windows & rear entry @ g/f w/ new conrete steps. new wood deck & stair at rear yard to main floor w/ new rear facing windows/doors. reconfiguration of 2 bed, kids bath, & primary bed.Details
3 story remodel: new office, office bath, game room, laundry, new windows & rear entry @ g/f w/ new conrete steps. new wood deck & stair at rear yard to main floor w/ new rear facing windows/doors. reconfiguration of 2 bed, kids bath, & primary bed. | $400,000 |
| Nov 18, 2024 | Completed final sign-off Nov 2025 | 1555 Yosemite Av | unit #4: new office and open office partitions and work surfaces. selected bathroom new floor and wall finishes, 2 new doors. upgrade of primary entrance door hardware and interior landing/threshold. replace (e) plumbing fixtures to meet curret code.Details
unit #4: new office and open office partitions and work surfaces. selected bathroom new floor and wall finishes, 2 new doors. upgrade of primary entrance door hardware and interior landing/threshold. replace (e) plumbing fixtures to meet curret code. | $36,000 |
| Aug 9, 2024 | Completed final sign-off Sep 2025 | 55 Ulloa St | interior remodel: 1st flr remove existing concrete slab & interior walls. new concrete slab, remodel existing bathrooms, 2 bdrms,family room, hall. replace interior stair, new side + rear window/door (not visible from puplic way) 2nd fl: remodel kitchen, reframe openings to living & dining rooms,Details
interior remodel: 1st flr remove existing concrete slab & interior walls. new concrete slab, remodel existing bathrooms, 2 bdrms,family room, hall. replace interior stair, new side + rear window/door (not visible from puplic way) 2nd fl: remodel kitchen, reframe openings to living & dining rooms, | $185,000 |
| Aug 6, 2024 | Expired or cancelled expired Jul 2026 | 4245 23rd St | revision to pa#202210285454 to include removal of roof deck, update to rear exterior finishes. south wall expansion 10'" furnther south, updated window types and the addition of a skylight and stacked washer/dryer at hall bath.Details
revision to pa#202210285454 to include removal of roof deck, update to rear exterior finishes. south wall expansion 10'" furnther south, updated window types and the addition of a skylight and stacked washer/dryer at hall bath. | |
| Dec 29, 2023 | Completed final sign-off Sep 2025 | 25 Whitney St | new 1-story rear yard addition w/ roof deck and exterior stair, replace existing interior communication stair between 1st and 2nd floors, new full bathroom @ 1st floor, relocation of laundry @ 1st floor, new fire separation between garage & 1st and 2nd floor living spaces, new roof top pv solarDetails
new 1-story rear yard addition w/ roof deck and exterior stair, replace existing interior communication stair between 1st and 2nd floors, new full bathroom @ 1st floor, relocation of laundry @ 1st floor, new fire separation between garage & 1st and 2nd floor living spaces, new roof top pv solar | $239,306 |
| Aug 8, 2023 | Completed final sign-off Dec 2023 | 2663 16th Av | one in kind bathroom remodel. three in kind exterior patio door replacements.Details
one in kind bathroom remodel. three in kind exterior patio door replacements. | $10,000 |
| May 26, 2023 | Completed final sign-off Nov 2024 | 172 25th Av | replacing fixtures & finishes. in-kind. in kitchen and 3 bathroom.Details
replacing fixtures & finishes. in-kind. in kitchen and 3 bathroom. | $250,000 |
| Dec 27, 2022 | In progress issued Jul 2025 | 1518 07th Av | horizontal rear addition on 2/f & 3/f. new windows and doors at addition. new half-bath/laundy and kitchen expansion on 2/f. new primarty suite at 3/f with new skylight at (e) roof. add new adu on 1st floor.Details
horizontal rear addition on 2/f & 3/f. new windows and doors at addition. new half-bath/laundy and kitchen expansion on 2/f. new primarty suite at 3/f with new skylight at (e) roof. add new adu on 1st floor. | $300,000 |
| Oct 28, 2022 | Completed final sign-off Aug 2026 | 4245 23rd St | interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck.Details
interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck. | $1,200,000 |
| Jan 28, 2022 | Completed final sign-off Nov 2024 | 3030 Pacific Av | interior renovation inlcuding removal of smaller staircase and extending main staircase to basement and 3rd floor. minor kitchen reconfiguration ofdr pantry and closet space. reconfiguration of bathroom and closet space. 2nd & 3rd floor master bedroom and master bathroom. add a full bath at 2nd fl.Details
interior renovation inlcuding removal of smaller staircase and extending main staircase to basement and 3rd floor. minor kitchen reconfiguration ofdr pantry and closet space. reconfiguration of bathroom and closet space. 2nd & 3rd floor master bedroom and master bathroom. add a full bath at 2nd fl. | $1,000,000 |
| Nov 22, 2021 | Completed final sign-off Aug 2022 | 68 Mars St | addition of replacing finishes (in kind) only to one kitchen and one bathroom, no structural work or walls to be moved.Details
addition of replacing finishes (in kind) only to one kitchen and one bathroom, no structural work or walls to be moved. | |
| Sep 22, 2021 | Completed final sign-off Jun 2022 | 2650 Pierce St | remodel 2 (e) bathrooms. retrofit (e) closet to shower. install new closest in adj bedroom.Details
remodel 2 (e) bathrooms. retrofit (e) closet to shower. install new closest in adj bedroom. | $30,000 |
| Aug 30, 2021 | Completed final sign-off May 2022 | 151 Saturn St | to partially comply with #202181502. revision to app#202104198798 to clarify that electrical work will be done in led lights both upstairs bathrooms.Details
to partially comply with #202181502. revision to app#202104198798 to clarify that electrical work will be done in led lights both upstairs bathrooms. | $5,000 |
| Jun 7, 2021 | Completed final sign-off Apr 2023 | 195 Santa Ana Av | interior remodel of master bved/bathroom suite and office. reconfig window locaitons on north elevation and addition of skylights, all not vislbe from street.Details
interior remodel of master bved/bathroom suite and office. reconfig window locaitons on north elevation and addition of skylights, all not vislbe from street. | $450,000 |
| Apr 27, 2021 | Completed final sign-off Mar 2024 | 4018 Cesar Chavez St | 1st fl:replace/expand garage and remodel(e)bathroom and storage spaces.2nd fl:2(n)windows and1(n)exterior door,(n)roof deck above garage,remodel(e)bathroom/laundry.3rd fl:expand(e)dormer,(n)dormer roof to match(e),remodel1(e) bathroom&1(n)bathroom,3(n)skylight&windows.Details
1st fl:replace/expand garage and remodel(e)bathroom and storage spaces.2nd fl:2(n)windows and1(n)exterior door,(n)roof deck above garage,remodel(e)bathroom/laundry.3rd fl:expand(e)dormer,(n)dormer roof to match(e),remodel1(e) bathroom&1(n)bathroom,3(n)skylight&windows. | $295,000 |
| Apr 19, 2021 | Completed final sign-off May 2022 | 151 Saturn St | replacement of finishes in kind of 2 upstairs bathrooms. no electrical or structual to be performed.Details
replacement of finishes in kind of 2 upstairs bathrooms. no electrical or structual to be performed. | $20,000 |
| Apr 12, 2021 | Completed final sign-off Dec 2021 | 2158 Larkin St | remodel kitchen and bath in kind. replace existing wooden flooring.Details
remodel kitchen and bath in kind. replace existing wooden flooring. | $45,000 |
| Feb 9, 2021 | Completed final sign-off Jul 2021 | 2545 Union St | remodel 2 bathrooms in kind. replace finishes only. no change to walls and openings layout.Details
remodel 2 bathrooms in kind. replace finishes only. no change to walls and openings layout. | $30,000 |
| Feb 2, 2021 | Completed final sign-off Feb 2022 | 526 Connecticut St | bathroom & kitchen remodel on 1st floor. no change of use. no structural work.Details
bathroom & kitchen remodel on 1st floor. no change of use. no structural work. | $35,000 |
| Oct 2, 2020 | Completed final sign-off Jun 2021 | 507 Rhode Island St | amend to pa202008312940: 1/f: new concrete footing and post at house centerline. 2/f:remove walls between kitchen & living room & sunroom.3/f expand master bedroom into nw eavespace, add master bath and closet. expand 2 bedroom into se eavespace. new closet.(n) attic pull down stair.Details
amend to pa202008312940: 1/f: new concrete footing and post at house centerline. 2/f:remove walls between kitchen & living room & sunroom.3/f expand master bedroom into nw eavespace, add master bath and closet. expand 2 bedroom into se eavespace. new closet.(n) attic pull down stair. | $60,000 |
| Aug 4, 2020 | Completed final sign-off Aug 2021 | 1340 Clay St | unit #802: remodel (e) master bath & closet, no structural work. remodel (e) bathroom in current location, no structural work. revise living room cabinetryDetails
unit #802: remodel (e) master bath & closet, no structural work. remodel (e) bathroom in current location, no structural work. revise living room cabinetry | $120,000 |
| Jul 7, 2020 | Completed final sign-off Jul 2021 | 725 Naples St | remodel bathroom, r/r in-kind.Details
remodel bathroom, r/r in-kind. | $20,000 |
| Jun 10, 2020 | Never finaled issued Jun 2020, no final | 97 Amber Dr | replace in-kind finishes such as flooring, fixtures in 2 small bathrooms and fixtures in one kitchen.Details
replace in-kind finishes such as flooring, fixtures in 2 small bathrooms and fixtures in one kitchen. | $30,000 |
| Jun 4, 2020 | Never finaled issued Sep 2020, no final | 126 Commonwealth Av | convert 3rd floor single bedroom with one bathroom into two bedrooms and one bathroomDetails
convert 3rd floor single bedroom with one bathroom into two bedrooms and one bathroom | $80,000 |
| Feb 19, 2020 | Completed final sign-off Jun 2022 | 1348 South Van Ness Av | revision to pa 2017-1215-6648 increase scope to remodel (e) bathroomDetails
revision to pa 2017-1215-6648 increase scope to remodel (e) bathroom | $20,000 |
| Oct 1, 2019 | Completed final sign-off Nov 2020 | 11 Cook St | master bathroom remodel in kind. no plans, no structural work.Details
master bathroom remodel in kind. no plans, no structural work. | $10,000 |
| Sep 30, 2019 | Completed final sign-off Jan 2021 | 151 Saturn St | interior remodel including new stair, bathroom and storage rooms, new partitionsDetails
interior remodel including new stair, bathroom and storage rooms, new partitions | $50,000 |
| Sep 11, 2019 | Completed final sign-off Jan 2021 | 468 Pennsylvania Av | 2nd floor kitchen and bathroom remodel, replace extg door with bi-fold. 3rd floor bathroom remodel, replace rear bedroom door/window with new window and remove bridge to rear yardDetails
2nd floor kitchen and bathroom remodel, replace extg door with bi-fold. 3rd floor bathroom remodel, replace rear bedroom door/window with new window and remove bridge to rear yard | $160,000 |
| Aug 29, 2019 | Completed final sign-off Feb 2024 | 2518 Great Hy | horizontal & vertical addition of (e) 3 story sfr to comply with current zoning. interior remodel. no significant grading. 4 bedrooms & 3.4 baths.Details
horizontal & vertical addition of (e) 3 story sfr to comply with current zoning. interior remodel. no significant grading. 4 bedrooms & 3.4 baths. | $275,000 |
| Jul 11, 2019 | Completed final sign-off Jul 2020 | 333 Texas St | remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace.Details
remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace. | $180,000 |
| Jun 12, 2019 | Completed final sign-off Oct 2019 | 4140 22nd St | bathroom remodel; finishes only.Details
bathroom remodel; finishes only. | $10,000 |
| Jan 10, 2019 | Completed final sign-off Jun 2019 | 430 College Av | remodel 1 kitchen, 2 bathrooms (same fixture count) now wall moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel 1 kitchen, 2 bathrooms (same fixture count) now wall moved, removed, added or infilled. all existing layouts to remain unchanged. | $40,000 |
| Jun 18, 2018 | Completed final sign-off Nov 2018 | 126 Commonwealth Av | add bathroom to ground floorDetails
add bathroom to ground floor | $15,000 |
| Jan 4, 2018 | Completed final sign-off Sep 2018 | 250 Elsie St | remodel kitchen. relocate bathroom. remove 1 window, replace extg slider, extg window, extg door, extg skylight update all electrical.Details
remodel kitchen. relocate bathroom. remove 1 window, replace extg slider, extg window, extg door, extg skylight update all electrical. | $80,000 |
| Dec 4, 2017 | Completed final sign-off Jul 2019 | 384 Fair Oaks St | (n) master bath at 3rd fl. remodel roof to raise ceiling height at location of new master bathroom and laundry area. new air conditioning condenser unit to be installed on top of new flat roof. new roof does not exceed (e) roof ridge heightDetails
(n) master bath at 3rd fl. remodel roof to raise ceiling height at location of new master bathroom and laundry area. new air conditioning condenser unit to be installed on top of new flat roof. new roof does not exceed (e) roof ridge height | $17,000 |
| Oct 18, 2017 | Completed final sign-off Sep 2018 | 1051 Powhattan Av | remodel master bathroom in kind. add (n) bathroom. (n) window in bedroom. rpelace 3 windows on rear facade.Details
remodel master bathroom in kind. add (n) bathroom. (n) window in bedroom. rpelace 3 windows on rear facade. | $30,000 |
| Oct 5, 2017 | Completed final sign-off Jul 2019 | 384 Fair Oaks St | interior and exterior alterations to a 3-story, 2 unit residence. kitchen, bath & powder rm remodel at 1st fl. kitchen & bath remodel @ 2nd fl. bath & laundry remodel, new water heaters, hvac equip. repair garage roofDetails
interior and exterior alterations to a 3-story, 2 unit residence. kitchen, bath & powder rm remodel at 1st fl. kitchen & bath remodel @ 2nd fl. bath & laundry remodel, new water heaters, hvac equip. repair garage roof | $215,350 |
| Apr 21, 2017 | Completed final sign-off Oct 2019 | 765 Market St | grand penthouse a- interior renovation of grand penthouse a in four seasons residences. work to include renovation of master bedroom, bath, closets & guest bedrooms, baths, closets; front entry foyer/hall; powder room, kitchen; dining room; family/living rooms; new media roomDetails
grand penthouse a- interior renovation of grand penthouse a in four seasons residences. work to include renovation of master bedroom, bath, closets & guest bedrooms, baths, closets; front entry foyer/hall; powder room, kitchen; dining room; family/living rooms; new media room | $500,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2018 | 169 Amber Dr | remodel 2 bathrooms & 1 half bathroom; add (n) bathroom to 2nd floor. remodel kitchen & bedrooms. update electrical & plumbingDetails
remodel 2 bathrooms & 1 half bathroom; add (n) bathroom to 2nd floor. remodel kitchen & bedrooms. update electrical & plumbing | $120,000 |
| Sep 15, 2016 | Completed final sign-off Sep 2016 | 317 Missouri St | add valuation to pa# 201604296202 per inspector's note"add valuation $35,000 for kitchen/bathroom remodel at 2nd floor"Details
add valuation to pa# 201604296202 per inspector's note"add valuation $35,000 for kitchen/bathroom remodel at 2nd floor" | $35,000 |
| Aug 18, 2016 | Completed final sign-off Sep 2017 | 209 Arkansas St | in unit 209, to add interior stairs from the second floor to the ground floor & add a new bedroom & bathroom. in unit 211, add a pop out into the existing lightwell.Details
in unit 209, to add interior stairs from the second floor to the ground floor & add a new bedroom & bathroom. in unit 211, add a pop out into the existing lightwell. | $50,000 |
| Jun 7, 2016 | Completed final sign-off Apr 2017 | 70 Lopez Av | partial 1st fl interior remodel including kitchen, bath, laundry. new breakfast rm, new side door, rear door, window. partial 2nd flr interior remodel including master bath, wic, kids bathDetails
partial 1st fl interior remodel including kitchen, bath, laundry. new breakfast rm, new side door, rear door, window. partial 2nd flr interior remodel including master bath, wic, kids bath | $125,000 |
| May 17, 2016 | Completed final sign-off Feb 2017 | 2545 Union St | in-kind master bathroom renovation. replacing finishes. no change to layout, wall, doors.Details
in-kind master bathroom renovation. replacing finishes. no change to layout, wall, doors. | $20,000 |
| Apr 13, 2016 | Completed final sign-off Dec 2016 | 2101 Scott St | revision to pa# 201506048045 & #201507171787, (n) roof framing @ upper roof only, switch laundry & bath @ upper level, (n) beam option @ lower level, replace inadequate perimeter foundation @ property line where required.Details
revision to pa# 201506048045 & #201507171787, (n) roof framing @ upper roof only, switch laundry & bath @ upper level, (n) beam option @ lower level, replace inadequate perimeter foundation @ property line where required. | $15,000 |
| Mar 31, 2016 | Completed final sign-off Feb 2017 | 1124 De Haro St | renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heaterDetails
renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heater | $162,000 |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 43 Everson St | (n) foundation & interior remodel 1/f: (n) home gym, sauna, lounge/wet bar, 1.5 baths, exercise area & stairs. 2/f: (n) bedroom, 1-1/2 baths, closets & media room. existing 3/f to remain.Details
(n) foundation & interior remodel 1/f: (n) home gym, sauna, lounge/wet bar, 1.5 baths, exercise area & stairs. 2/f: (n) bedroom, 1-1/2 baths, closets & media room. existing 3/f to remain. | $195,000 |
| Jan 27, 2016 | Never finaled issued Jul 2018, no final | 43 Everson St | horiz add @ rear of(e)single-family res. expand 1/fl w/ half basketball court. expand 2nd fl. w/(n)catwalk, (n) bedroom & (n)stairs. expand 3rd fl w/remodeled entry/foyer, kit,din rm & liv rm (n) bedroom, (n) util rm, bath & deck,(n)window,doors. addition of accessory dwelling unit per 207(c)(6).Details
horiz add @ rear of(e)single-family res. expand 1/fl w/ half basketball court. expand 2nd fl. w/(n)catwalk, (n) bedroom & (n)stairs. expand 3rd fl w/remodeled entry/foyer, kit,din rm & liv rm (n) bedroom, (n) util rm, bath & deck,(n)window,doors. addition of accessory dwelling unit per 207(c)(6). | $375,000 |
| Jan 22, 2016 | Completed final sign-off Jan 2017 | 549 Connecticut St | interior remodel of entry level, relocate existing bathroom, add dormers to existing roof, interior remodel of level 2, add 1 bathroom & 1 bedroom.Details
interior remodel of entry level, relocate existing bathroom, add dormers to existing roof, interior remodel of level 2, add 1 bathroom & 1 bedroom. | $185,000 |
| Dec 11, 2015 | Completed final sign-off Jan 2017 | 549 Connecticut St | 128 sq ft fill-in addition at rear and interior basement remodel. fill-in of (e) rear open area under cantilevered room built on columns. interior basement remodel is relocation of (e) bathroom and laundryDetails
128 sq ft fill-in addition at rear and interior basement remodel. fill-in of (e) rear open area under cantilevered room built on columns. interior basement remodel is relocation of (e) bathroom and laundry | $350,000 |
| Nov 4, 2015 | Completed final sign-off Nov 2015 | 1199 Church St | additional mep submittal for lighting and plumbing. replace lighting as necessary and 1 new bath fan. replace 1 toilet, 3 faucets and water heater. (pw20150901942 & building applic. #201507161645)Details
additional mep submittal for lighting and plumbing. replace lighting as necessary and 1 new bath fan. replace 1 toilet, 3 faucets and water heater. (pw20150901942 & building applic. #201507161645) | $8,000 |
| Oct 14, 2015 | Completed final sign-off Jun 2019 | 471 Hickory St | vertical addition to single family dwelling to change from (e) 1-story over garage to proposed 2-story over garage. add (1) (n) bathroom.Details
vertical addition to single family dwelling to change from (e) 1-story over garage to proposed 2-story over garage. add (1) (n) bathroom. | $533,000 |
| Sep 25, 2015 | Completed final sign-off Feb 2016 | 946 Wisconsin St | revision to pa #201504234415 - add bathroom on 2nd level where closet currently exists in lower unit.Details
revision to pa #201504234415 - add bathroom on 2nd level where closet currently exists in lower unit. | $9,000 |
| Sep 18, 2015 | Completed final sign-off Dec 2016 | 2101 Scott St | revision to app#201506048045. revise residential unit front door on scott street north of "c" line. revise commercial unit front door on scott street. south of "c" line. make commercial unit bathroom ada compliant.Details
revision to app#201506048045. revise residential unit front door on scott street north of "c" line. revise commercial unit front door on scott street. south of "c" line. make commercial unit bathroom ada compliant. | $5,000 |
| Jul 20, 2015 | Completed final sign-off Nov 2015 | 958 Carolina St | bathroom remodel, same location, 2nd flrDetails
bathroom remodel, same location, 2nd flr | $30,000 |
| Jul 17, 2015 | Completed final sign-off Dec 2016 | 2101 Scott St | revision to app#201506048045. revise location of kitchen. revise windows on d line between 3 and 5. revise location of bath, 1st floor between c and d line, to east of 3 line.Details
revision to app#201506048045. revise location of kitchen. revise windows on d line between 3 and 5. revise location of bath, 1st floor between c and d line, to east of 3 line. | |
| Jul 16, 2015 | Completed final sign-off Nov 2015 | 1199 Church St | repair and replace flooring, new ada bathroom in e location, replace bar casework, patch/repair wall finish and sheetrock, paint, replace lighting, add 1 new walkin remove part of 2 non structural walls. mep under separate permitDetails
repair and replace flooring, new ada bathroom in e location, replace bar casework, patch/repair wall finish and sheetrock, paint, replace lighting, add 1 new walkin remove part of 2 non structural walls. mep under separate permit | $100,000 |
| Jun 3, 2015 | Completed final sign-off Feb 2016 | 471 Lombard St | remodel 1st flr & add (n) bathroom, laundry & closet, remodel 2nd flr & add 1/2 bathroom, replace (e) windows on both floors, remodel (e) deck & remove (e) spiral staircase.Details
remodel 1st flr & add (n) bathroom, laundry & closet, remodel 2nd flr & add 1/2 bathroom, replace (e) windows on both floors, remodel (e) deck & remove (e) spiral staircase. | $180,000 |
| Apr 13, 2015 | Completed final sign-off Mar 2016 | 4338 Cesar Chavez St | remove partition wall in family rm. renovate full bathroom, relocate laundry; rev. to pa # 2013 0918 7186Details
remove partition wall in family rm. renovate full bathroom, relocate laundry; rev. to pa # 2013 0918 7186 | $20,000 |
| Apr 2, 2015 | Completed final sign-off Jun 2015 | 727 Ashbury St | remove and replace in kind finishes in bathroom on second floor. new tile, vanity, med. cabinet. bathroom remodelDetails
remove and replace in kind finishes in bathroom on second floor. new tile, vanity, med. cabinet. bathroom remodel | $10,000 |
| Mar 13, 2015 | Completed final sign-off Jul 2016 | 748 Church St | removal of a non-conforming rear decks. int renovation of (e) two unit w/expansion of the lower unit into unconditioned space on the 1st flr (n) full bathroom, (n) laundry rm, (n) bedroom. (n) kitchen in (e) location, (n) full bath on 2nd flr. 3rd flr remains. add roof deck. new interior stair.Details
removal of a non-conforming rear decks. int renovation of (e) two unit w/expansion of the lower unit into unconditioned space on the 1st flr (n) full bathroom, (n) laundry rm, (n) bedroom. (n) kitchen in (e) location, (n) full bath on 2nd flr. 3rd flr remains. add roof deck. new interior stair. | $489,000 |
| Feb 13, 2015 | Completed final sign-off Feb 2016 | 1072 Sanchez St | bath remodel: add a shower new finishes on 2nd floor, revision to 201310219769-s1Details
bath remodel: add a shower new finishes on 2nd floor, revision to 201310219769-s1 | $12,000 |
| Feb 6, 2015 | Completed final sign-off Dec 2015 | 1108 Page St | ground fl: remove (e) fireplace base, add moment frame, remodel bathroom. 2nd fl: remove fireplace, add moment frame, remodel kitchen, relocate bathroom.Details
ground fl: remove (e) fireplace base, add moment frame, remodel bathroom. 2nd fl: remove fireplace, add moment frame, remodel kitchen, relocate bathroom. | $120,000 |
| Jul 2, 2014 | Completed final sign-off Nov 2014 | 948 Wisconsin St | bathroom tile, floor tile, glass shower door, new sink, new toilet. replace kitchen counter top and back splash.Details
bathroom tile, floor tile, glass shower door, new sink, new toilet. replace kitchen counter top and back splash. | $16,000 |
| Jun 27, 2014 | Completed final sign-off Feb 2015 | 315 Missouri St | #315: interior remodel to include new kitchen & bath, ew forced air heater, exterior work limited to 3 new skylights & and 3 window replacement in kind; voluntary seismic upgrade, grnd flr dry rot repair & voluntary shear wall upgradesDetails
#315: interior remodel to include new kitchen & bath, ew forced air heater, exterior work limited to 3 new skylights & and 3 window replacement in kind; voluntary seismic upgrade, grnd flr dry rot repair & voluntary shear wall upgrades | $85,000 |
| Jun 19, 2014 | Completed final sign-off Nov 2017 | 1209 Douglass St | renovation & addition to (e) 3-story single family dwelling. work to include modification to interior layout, 3-story addition @ rear yard, leveling of rear yard surface, including bathroom & kithchen.Details
renovation & addition to (e) 3-story single family dwelling. work to include modification to interior layout, 3-story addition @ rear yard, leveling of rear yard surface, including bathroom & kithchen. | $430,000 |
| May 19, 2014 | Completed final sign-off Sep 2014 | 1958 Vallejo St | interior remodel unit #11 remodel bathrooms, bedrooms, and laundry. no structural work.Details
interior remodel unit #11 remodel bathrooms, bedrooms, and laundry. no structural work. | $187,000 |
| Apr 22, 2014 | Completed final sign-off Sep 2014 | 1958 Vallejo St | refinish flooring, reface cabinets, in kitchen, repaint house, retile master bathroom, new bathroom fixtures at master bathroom, new fixtures in kitchenDetails
refinish flooring, reface cabinets, in kitchen, repaint house, retile master bathroom, new bathroom fixtures at master bathroom, new fixtures in kitchen | $50,000 |
| Apr 14, 2014 | Completed final sign-off Nov 2014 | 597 Connecticut St | fill-in (e) rear deck under canelevered room. interior remodel of (e) basement to include new (3) bedrooms and (2) baths. interior remodel of (e) ground level bathroom and addition of interior stair. no change to exterior stair at rear.Details
fill-in (e) rear deck under canelevered room. interior remodel of (e) basement to include new (3) bedrooms and (2) baths. interior remodel of (e) ground level bathroom and addition of interior stair. no change to exterior stair at rear. | $200,000 |
| Oct 31, 2013 | Completed final sign-off Jun 2014 | 432 Fair Oaks St | 2nd floor-remove & replace finishes in 1 bathroom, replace plumbing fixtures, complete interior paint. no chnage in wall openings or layout. bathroom lighting shall be high efficacy or controlled by manual-on sensorsDetails
2nd floor-remove & replace finishes in 1 bathroom, replace plumbing fixtures, complete interior paint. no chnage in wall openings or layout. bathroom lighting shall be high efficacy or controlled by manual-on sensors | $25,000 |
| Sep 18, 2013 | Completed final sign-off Mar 2016 | 4338 Cesar Chavez St | square (e) rear bay windows. install 7 new windows, 1 skylite, 4 n ext doors not visible to street. new flat roof@rear & new side dormer. replace &enlarge 2 e rear decks.kitchen removation.convert 1/2 bath to full bath. renovate mst bath & bath 3.remove garage post.Details
square (e) rear bay windows. install 7 new windows, 1 skylite, 4 n ext doors not visible to street. new flat roof@rear & new side dormer. replace &enlarge 2 e rear decks.kitchen removation.convert 1/2 bath to full bath. renovate mst bath & bath 3.remove garage post. | $150,000 |
| Aug 14, 2013 | Completed final sign-off Feb 2014 | 4031 21st St | interior remodel, no change to bldg envelope, no structural change, remove/replac einterior finsihes & remodel of 2 existing bathrooms. to comply with cec(150)10.Details
interior remodel, no change to bldg envelope, no structural change, remove/replac einterior finsihes & remodel of 2 existing bathrooms. to comply with cec(150)10. | $120,000 |
| Feb 8, 2013 | Completed final sign-off Jul 2013 | 251 Hartford St | relocate kitchen and remodel bath at ground floor level.Details
relocate kitchen and remodel bath at ground floor level. | $50,000 |
| Jan 23, 2013 | Completed final sign-off Aug 2013 | 681 Duncan St | remodel kitchen, bathroom, replace (3) existing skylights in kind replacement, replace (e) wood floors.Details
remodel kitchen, bathroom, replace (3) existing skylights in kind replacement, replace (e) wood floors. | $50,000 |
| Sep 26, 2012 | Completed final sign-off Dec 2013 | 1050 North Point St | revision to 2001109295796. delete new wall from scope to reduce unit size and enlarge neighboring unit. relocate approved bathroom. no structural work. no area changesDetails
revision to 2001109295796. delete new wall from scope to reduce unit size and enlarge neighboring unit. relocate approved bathroom. no structural work. no area changes | $525,000 |
| Sep 26, 2012 | Completed final sign-off Oct 2013 | 1050 North Point St | revision to 201109295794. delete approved opening between units to expand this unit.no structural work. no area changes. remodel existing kitchen and baths.Details
revision to 201109295794. delete approved opening between units to expand this unit.no structural work. no area changes. remodel existing kitchen and baths. | |
| Sep 20, 2012 | Completed final sign-off Jul 2013 | 1278 Clayton St | revision to app#201110217387. amend foundation at north property line and foundation at 1st fl00r bathroom. amend framing structural at deck on 2nd floor with water retaining underdeck system.Details
revision to app#201110217387. amend foundation at north property line and foundation at 1st fl00r bathroom. amend framing structural at deck on 2nd floor with water retaining underdeck system. | $5,000 |
| Jun 4, 2012 | Expired or cancelled expired Sep 2021 | 1450 Post St | remodel/replace finishes in 2 bathrooms, replace carpet with wood floor and paint throughout, no exterior or structural work.Details
remodel/replace finishes in 2 bathrooms, replace carpet with wood floor and paint throughout, no exterior or structural work. | $11,000 |
| Jan 20, 2012 | Completed final sign-off Aug 2012 | 251 Hartford St | minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard.Details
minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard. | $150,000 |
| Oct 21, 2011 | Completed final sign-off Jul 2013 | 1278 Clayton St | convert (e) 1st fl storage area @ rear to habitable space (bedroom, bathroom & laundry room). create addition along south side to enclosed stair from 1st to 2nd fl. renovate kitchen, add master bathroom @ rear on the 3rd fl.Details
convert (e) 1st fl storage area @ rear to habitable space (bedroom, bathroom & laundry room). create addition along south side to enclosed stair from 1st to 2nd fl. renovate kitchen, add master bathroom @ rear on the 3rd fl. | $75,000 |
| Jul 29, 2011 | Completed final sign-off Mar 2012 | 1200 California St | cosmetic remodeling to a residential apartment work includes remodeling of a coat closet, (n) wood paneling addition of recessed light fixtures to (e) new kitchen countertops. no other work to kitchen and/or bathrooms. no exterior work.Details
cosmetic remodeling to a residential apartment work includes remodeling of a coat closet, (n) wood paneling addition of recessed light fixtures to (e) new kitchen countertops. no other work to kitchen and/or bathrooms. no exterior work. | $100,000 |
| May 16, 2011 | Completed final sign-off Jul 2011 | 2510 Pacific Av | remove tub in guest bathroom & install a shower, replace tile @ 2nd floor guest suite, ne corner of residence.Details
remove tub in guest bathroom & install a shower, replace tile @ 2nd floor guest suite, ne corner of residence. | $12,000 |
| May 13, 2011 | Completed final sign-off Mar 2012 | 1514 Diamond St | new communication stair connecting 2nd floor to new 1st floor conditioned spaces. fire separation of garage from conditioned spaces. renovation of 1st floor spaces to allow new bedroom, bath and laundry. replace extg retaining wall at rear yard. replace extg deck posts with tube steel.nu highDetails
new communication stair connecting 2nd floor to new 1st floor conditioned spaces. fire separation of garage from conditioned spaces. renovation of 1st floor spaces to allow new bedroom, bath and laundry. replace extg retaining wall at rear yard. replace extg deck posts with tube steel.nu high | $115,000 |
| Jul 27, 2010 | Never finaled issued May 2011, no final | 3733 21st St | new horizontal 2 story rear addition that is to contain an expanded kitchen & renovated sitting room on the ground floor & a new bedroom, bathroom, & roof deck on the 2nd floor. (e) attic convert to 2nd floor.Details
new horizontal 2 story rear addition that is to contain an expanded kitchen & renovated sitting room on the ground floor & a new bedroom, bathroom, & roof deck on the 2nd floor. (e) attic convert to 2nd floor. | $255,000 |
| Jul 14, 2010 | Completed final sign-off Jan 2011 | 3947 23rd St | remodel (e) kitchen and dining area on 2nd fl. remodel (e) bathroom on 3rd fl. redo deck floor of (e) deck at rear on 2nd fl adjacent to dining rm. remove door/wall and replace with new wall at ground flDetails
remodel (e) kitchen and dining area on 2nd fl. remodel (e) bathroom on 3rd fl. redo deck floor of (e) deck at rear on 2nd fl adjacent to dining rm. remove door/wall and replace with new wall at ground fl | $37,000 |
| Mar 17, 2010 | Completed final sign-off Jul 2010 | 1359 15th Av | renovation of 3rd. flr. closet into master bathroom. replacement in-kind of (e) double hung windows @ front facade, 3-story.Details
renovation of 3rd. flr. closet into master bathroom. replacement in-kind of (e) double hung windows @ front facade, 3-story. | $35,000 |
| Mar 2, 2010 | Completed final sign-off Feb 2011 | 3962 19th St | unit 3962 at 3rd floor. remodel of (e) unit. work includes renovation of kitch and bathrm, add new bathroom, 3 skylights. upgrade 2 (e) windows in lightwell. new radiant heating system. no expansion of envelope.Details
unit 3962 at 3rd floor. remodel of (e) unit. work includes renovation of kitch and bathrm, add new bathroom, 3 skylights. upgrade 2 (e) windows in lightwell. new radiant heating system. no expansion of envelope. | $250,000 |
| Dec 31, 2009 | Completed final sign-off May 2011 | 195 Santa Ana Av | add a basement level story under (e) home at garage level. interior remodel on the main level including removing a wall between 2 rooms, & providing a new stair to the basement level. addition of bull bath at basement level. window replacement.Details
add a basement level story under (e) home at garage level. interior remodel on the main level including removing a wall between 2 rooms, & providing a new stair to the basement level. addition of bull bath at basement level. window replacement. | $400,000 |
| Nov 4, 2009 | Completed final sign-off Oct 2010 | 245 Castro St | voluntary foundation upgrade. renovate (e) bath @ 2nd floor, remove existing greenhouse & replace w/new walls & roof at basement garage level. add shower to (e) bath, add new doors to garden.Details
voluntary foundation upgrade. renovate (e) bath @ 2nd floor, remove existing greenhouse & replace w/new walls & roof at basement garage level. add shower to (e) bath, add new doors to garden. | $90,000 |
| May 12, 2009 | Completed final sign-off Oct 2009 | 73 Pleasant St | interior remodel of existing kitchen, bath, closets, fixtures & finishes. construction of new non-load bearing partitions & 1-hr. separation.Details
interior remodel of existing kitchen, bath, closets, fixtures & finishes. construction of new non-load bearing partitions & 1-hr. separation. | $96,000 |
| Mar 7, 2008 | Completed final sign-off Jul 2008 | 4522 20th St | on 2nd floor: remodel existing kitchen. remodel existing closet into 1/2 bath. replacement of existing kitchen door and additoin of transom window above new finishes, new plumbing trim, elec outlets and lightingDetails
on 2nd floor: remodel existing kitchen. remodel existing closet into 1/2 bath. replacement of existing kitchen door and additoin of transom window above new finishes, new plumbing trim, elec outlets and lighting | $42,000 |
| Nov 22, 2005 | Completed final sign-off Jun 2006 | 151 Saturn St | change use of family room on garage level to storage and remove bathroom. per parroved app#200405275054.Details
change use of family room on garage level to storage and remove bathroom. per parroved app#200405275054. |