Back to bathroom remodel contractors
Sasso Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to May 2026
- Last 24 months
- 9 permits filed
231 permits since 2000: 197 completed, 5 in progress, 19 never finaled, 10 expired or cancelled.
Of the 19 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
77 bathroom remodel permits: 70 completed, 4 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2025 | Completed final sign-off Jan 2026 | 654 Funston Av | bathroom remodel like for like. no change to walls.Details
bathroom remodel like for like. no change to walls. | $35,000 |
| May 2, 2024 | Completed final sign-off Nov 2024 | 207 Guerrero St | interior remodel of extg bedroom and bath in extg condominium. no structural work, and no work to the exterior envelope of building.Details
interior remodel of extg bedroom and bath in extg condominium. no structural work, and no work to the exterior envelope of building. | $35,000 |
| Mar 19, 2024 | Completed final sign-off Jul 2024 | 1040 Masonic Av | bath remodel in kind with (e) washer dryer replacementDetails
bath remodel in kind with (e) washer dryer replacement | $20,000 |
| Oct 17, 2023 | Completed final sign-off Nov 2023 | 236 Hartford St | replace bathroom window in kind in lightwell area. same size, same location, max u-factor 0.30.Details
replace bathroom window in kind in lightwell area. same size, same location, max u-factor 0.30. | $400 |
| Oct 16, 2023 | Completed final sign-off Feb 2024 | 270 Valencia St | bathroom remodel in kind.Details
bathroom remodel in kind. | $25,000 |
| Sep 22, 2023 | Completed final sign-off Mar 2024 | 182 Maynard St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,000 |
| Jul 11, 2023 | Completed final sign-off Nov 2023 | 236 Hartford St | one bathroom remodel in kind w/ shower pan.Details
one bathroom remodel in kind w/ shower pan. | $21,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 950 Noe St | remodel one bathroom in kind- replace shower pan in kind.Details
remodel one bathroom in kind- replace shower pan in kind. | $25,000 |
| Dec 28, 2022 | Completed final sign-off Mar 2023 | 158 Corbett Av | bathroom remodel in kind.Details
bathroom remodel in kind. | $19,000 |
| Sep 9, 2022 | Completed final sign-off Dec 2022 | 468 Corbett Av | bathroom remodel in-kindDetails
bathroom remodel in-kind | $18,000 |
| Jul 11, 2022 | Completed final sign-off Mar 2023 | 3522 17th St | 2nd flr - remodel kitchen and one bathroom, drywall and insulation. replace all 9 wood windows in-kind (marvin) with integral lugs and 5 vinyl windows at the rear.Details
2nd flr - remodel kitchen and one bathroom, drywall and insulation. replace all 9 wood windows in-kind (marvin) with integral lugs and 5 vinyl windows at the rear. | $100,000 |
| Jun 10, 2022 | Completed final sign-off Nov 2023 | 537 Magellan Av | renovation on floors 1 & 2: 1st fl - kitchen remodel. incorporate portion of garage into habitable space; relocate guest bath; rebuild interior stair @ half level; 2nd fl - relocate hall bath & mater bedroom; add laundry roomDetails
renovation on floors 1 & 2: 1st fl - kitchen remodel. incorporate portion of garage into habitable space; relocate guest bath; rebuild interior stair @ half level; 2nd fl - relocate hall bath & mater bedroom; add laundry room | $150,000 |
| Jul 13, 2021 | Completed final sign-off Oct 2021 | 51 Douglass St | (1) bathroom remodel in-kind, non structuralDetails
(1) bathroom remodel in-kind, non structural | $16,000 |
| Jul 6, 2021 | Completed final sign-off Nov 2021 | 250 Red Rock Wy | remodel 2 bathroom, 1 powder room in kind. non structuralDetails
remodel 2 bathroom, 1 powder room in kind. non structural | $17,500 |
| Apr 9, 2021 | Completed final sign-off Jan 2022 | 925 Grove St | 1 bathroom remodel in-kind. no new wall & no (e) wall relocation. all new plumbing to be remain. at same location new lighting comply w/ cec 150.0 (k) s.Details
1 bathroom remodel in-kind. no new wall & no (e) wall relocation. all new plumbing to be remain. at same location new lighting comply w/ cec 150.0 (k) s. | $12,000 |
| Nov 30, 2020 | Completed final sign-off Oct 2023 | 3520 17th St | interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen 7 bathroom, new water heater, new furnace.Details
interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen 7 bathroom, new water heater, new furnace. | $96,000 |
| Oct 26, 2020 | Completed final sign-off Oct 2021 | 790 Lyon St | remodel kitchen & 2 bathrooms. replace windows in-kind. remove chimney.Details
remodel kitchen & 2 bathrooms. replace windows in-kind. remove chimney. | $75,000 |
| Sep 21, 2020 | Expired or cancelled expired Nov 2023 | 3520 17th St | interior remodel: finishes, clean ouyt, repair in kind. withinb envelope. no addition. replace in kind. kitchen, cabinets & counters. mep finish, trom, fixtures. (n) switch, (n) receptacles, replace in kind. tiles back splash at kitchen and bath. new flooring, paint, replace heating furnace. no wallDetails
interior remodel: finishes, clean ouyt, repair in kind. withinb envelope. no addition. replace in kind. kitchen, cabinets & counters. mep finish, trom, fixtures. (n) switch, (n) receptacles, replace in kind. tiles back splash at kitchen and bath. new flooring, paint, replace heating furnace. no wall | $42,000 |
| Aug 14, 2020 | Completed final sign-off Nov 2020 | 1378 Bacon St | unit # 2: reomdel 1 bathroom in-kind. no walls moving.Details
unit # 2: reomdel 1 bathroom in-kind. no walls moving. | $12,000 |
| Feb 5, 2020 | Completed final sign-off Aug 2020 | 999 Green St | unit # 1105: kitchen and bath remodel in kind 9x14 bath 7x7Details
unit # 1105: kitchen and bath remodel in kind 9x14 bath 7x7 | $40,000 |
| Jan 27, 2020 | Completed final sign-off Aug 2021 | 201 Berkeley Wy | revision to pa 2020-0123-2595 2 1/2 bathrooms & garage w/1hr rating. dry wall and insulationDetails
revision to pa 2020-0123-2595 2 1/2 bathrooms & garage w/1hr rating. dry wall and insulation | $10,000 |
| Jan 23, 2020 | Completed final sign-off Aug 2021 | 201 Berkeley Wy | revision to pa# 2019-1031-6143: remodel half bathroom in kind comply w/ cec 150.0(k)5Details
revision to pa# 2019-1031-6143: remodel half bathroom in kind comply w/ cec 150.0(k)5 | $20,000 |
| Dec 20, 2019 | Completed final sign-off Jul 2020 | 4412 17th St | interior remodel, convert bsmt / garage into master suite, bonus ramily rm and mud rm. relocate kitchen, add new bath. replace 3 windows in kind in rear with metal clad. modify two bedrm relocate stairs.Details
interior remodel, convert bsmt / garage into master suite, bonus ramily rm and mud rm. relocate kitchen, add new bath. replace 3 windows in kind in rear with metal clad. modify two bedrm relocate stairs. | $65,000 |
| Aug 30, 2019 | Completed final sign-off Dec 2020 | 574 18th Av | revision to pa 201907035134. demo e 3rd fl bathroom and add 2 new baths. remodel (e) 3rd fl master bathDetails
revision to pa 201907035134. demo e 3rd fl bathroom and add 2 new baths. remodel (e) 3rd fl master bath | $25,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2019 | 601 Van Ness Av | unit 809: bathroom (75 sq. ft.) & kitchen (90 sq. ft.) remodel in-kind, all walls to remainDetails
unit 809: bathroom (75 sq. ft.) & kitchen (90 sq. ft.) remodel in-kind, all walls to remain | $19,000 |
| Apr 1, 2019 | Completed final sign-off Jul 2019 | 1 Mercato Ct | replace kitchen cabinets in-kind; remodel 2 bathrooms in-kind.Details
replace kitchen cabinets in-kind; remodel 2 bathrooms in-kind. | $25,000 |
| Mar 27, 2019 | Completed final sign-off Aug 2019 | 1662 Union St | remodel lower bathroom in-kindDetails
remodel lower bathroom in-kind | $18,000 |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 1320 Natoma St | remodel kitchen in kind. retile bathroom, clawfoot tub to remain. to abate complaint # 201801671 & 201899081. approx 10x10 kitchen.Details
remodel kitchen in kind. retile bathroom, clawfoot tub to remain. to abate complaint # 201801671 & 201899081. approx 10x10 kitchen. | $12,500 |
| Jun 6, 2018 | Never finaled issued Jun 2018, no final | 1 Daniel Burnham Ct | unit #423: kitchen and bath remodelDetails
unit #423: kitchen and bath remodel | $35,000 |
| Jan 29, 2018 | Completed final sign-off Apr 2018 | 1 Daniel Burnham Ct | replace bath tub and tile surround; n/a maherDetails
replace bath tub and tile surround; n/a maher | $2,000 |
| Jan 22, 2018 | Completed final sign-off Oct 2018 | 120 Cortland Av | at (e) 1st fl: rmeove (e) partition between (e) kitchen & (e) dining rm; relocate kitchen & dining room; rmeove and replace floor tile in (e) bathroom & (e) toilet rm. 2nd fl: add door to (e) study; replace (e) door to (e) bar; remove (e) bar and replace with (n) bathroom & (n) hallway;Details
at (e) 1st fl: rmeove (e) partition between (e) kitchen & (e) dining rm; relocate kitchen & dining room; rmeove and replace floor tile in (e) bathroom & (e) toilet rm. 2nd fl: add door to (e) study; replace (e) door to (e) bar; remove (e) bar and replace with (n) bathroom & (n) hallway; | $199,250 |
| Oct 13, 2017 | Completed final sign-off Jan 2018 | 849 Mason St | unit #2 - additional 2 bathroom remodel , ref # 201709067025Details
unit #2 - additional 2 bathroom remodel , ref # 201709067025 | $22,000 |
| Sep 19, 2017 | Completed final sign-off Jan 2019 | 2245 09th Av | kitchen remodel, master bath remodel. no walls moved, removed, added or installed. all existing layout to remain unchanged.Details
kitchen remodel, master bath remodel. no walls moved, removed, added or installed. all existing layout to remain unchanged. | $25,000 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 849 Mason St | unit 2: hallway bathroom remodel in-kind. no walls mofidied, no layout changes.Details
unit 2: hallway bathroom remodel in-kind. no walls mofidied, no layout changes. | $11,000 |
| Jul 18, 2017 | Completed final sign-off Mar 2018 | 55 Palm Av | unit #1: bathroom remodel, in-kindDetails
unit #1: bathroom remodel, in-kind | $12,000 |
| Jun 19, 2017 | Completed final sign-off Aug 2017 | 242 Hartford St | bathroom remodel.Details
bathroom remodel. | $12,000 |
| Nov 8, 2016 | Completed final sign-off May 2017 | 1 Daniel Burnham Ct | bathroom remodelDetails
bathroom remodel | $10,000 |
| Oct 12, 2016 | Completed final sign-off Apr 2017 | 317 Harriet St | unit #23: remodel(1) bathroom in kind.Details
unit #23: remodel(1) bathroom in kind. | $15,000 |
| Sep 12, 2016 | Completed final sign-off Dec 2016 | 1201 California St | #206: remodel bath and kitchenDetails
#206: remodel bath and kitchen | $25,000 |
| Jun 21, 2016 | Completed final sign-off Oct 2016 | 1 Daniel Burnham Ct | remodel two baths in kindDetails
remodel two baths in kind | $15,000 |
| May 11, 2016 | Completed final sign-off Aug 2016 | 523 Natoma St | remodel bath & kitchen, like for like, no change to walls.Details
remodel bath & kitchen, like for like, no change to walls. | $10,000 |
| Mar 9, 2016 | Completed final sign-off Oct 2016 | 823 Castro St | project proposes extg kitchen and bathroom renovation. relocation of laundry closet. scope includes a new master closet and bathroom.Details
project proposes extg kitchen and bathroom renovation. relocation of laundry closet. scope includes a new master closet and bathroom. | $53,000 |
| Jan 25, 2016 | Completed final sign-off Apr 2016 | 937 Leavenworth St | bathroom remodel, one bathroom to walls, to be relocated or renewed.Details
bathroom remodel, one bathroom to walls, to be relocated or renewed. | $7,500 |
| Oct 6, 2015 | Completed final sign-off Aug 2016 | 1201 California St | unit 104: interior remodel including kitchen & bath, no structural or exterior modifications. no alteration of wall, window & door.Details
unit 104: interior remodel including kitchen & bath, no structural or exterior modifications. no alteration of wall, window & door. | $20,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2016 | 1201 California St | remodel (3) bathrooms [2.5 baths < 13 sq. ft.], replace kitchen counters. compliance with maher ordinance no 155-13 not required.Details
remodel (3) bathrooms [2.5 baths < 13 sq. ft.], replace kitchen counters. compliance with maher ordinance no 155-13 not required. | $25,000 |
| Aug 18, 2015 | Completed final sign-off Aug 2016 | 124 Eureka St | remodel 2 baths and kitchen, move laundry room.Details
remodel 2 baths and kitchen, move laundry room. | $50,000 |
| Jul 2, 2015 | Never finaled issued Jul 2015, no final | 3004 Taraval St | alterations to provide ada bathroom & ada compliant front entry, (n) lighting to meet title 24 requirements, (n) non load bearing interior walls.Details
alterations to provide ada bathroom & ada compliant front entry, (n) lighting to meet title 24 requirements, (n) non load bearing interior walls. | $53,500 |
| Mar 9, 2015 | Completed final sign-off Mar 2016 | 1076 Dolores St | lower unit only -interior remodel kitchen and bath. install marvin widows. all wood.Details
lower unit only -interior remodel kitchen and bath. install marvin widows. all wood. | $25,000 |
| Feb 24, 2015 | Completed final sign-off Jul 2015 | 776 Rhode Island St | unit 201 -remodel 2 bathrooms and 1 kitchen. no change in layout and opening. all high efficacy lightingDetails
unit 201 -remodel 2 bathrooms and 1 kitchen. no change in layout and opening. all high efficacy lighting | $26,000 |
| Feb 9, 2015 | Completed final sign-off Sep 2015 | 494 Mangels Av | new bedroom, bath, hall and stair at 1st level.reconfigure closets on 2nd level. new window at rear, infill extg garage door, and new skylight.Details
new bedroom, bath, hall and stair at 1st level.reconfigure closets on 2nd level. new window at rear, infill extg garage door, and new skylight. | $40,000 |
| Jan 30, 2015 | Completed final sign-off Dec 2015 | 74 States St | remove interior stairs at split level unit #1. remodel extg kitchen in unit #2 and expand into split level of unit 1 (same level). remodel bath in unit #2.Details
remove interior stairs at split level unit #1. remodel extg kitchen in unit #2 and expand into split level of unit 1 (same level). remodel bath in unit #2. | $45,000 |
| Oct 27, 2014 | Completed final sign-off Feb 2015 | 2418 Gough St | remodel bathroom.Details
remodel bathroom. | $12,000 |
| Aug 8, 2014 | Completed final sign-off Sep 2014 | 935 Leavenworth St | refinish bathroom; maher n/aDetails
refinish bathroom; maher n/a | $5,000 |
| Mar 21, 2014 | Completed final sign-off Jul 2014 | 277 Hartford St | remodel bathroom.Details
remodel bathroom. | $8,500 |
| Mar 3, 2014 | Completed final sign-off Oct 2014 | 66 Bret Harte Tr | remodel kitchen & bath, remove wall from kitchen & dining room. compliance with ordinance #155-13 not requiredDetails
remodel kitchen & bath, remove wall from kitchen & dining room. compliance with ordinance #155-13 not required | $40,000 |
| Feb 28, 2014 | Completed final sign-off Jul 2014 | 300 03rd St | unit #806: remodel bathroom - no partition movement.Details
unit #806: remodel bathroom - no partition movement. | $8,500 |
| Feb 7, 2014 | Completed final sign-off Jun 2014 | 2134 Green St | #3. remodel bathroom, remove partition wall b/t toilet and shower non bearing wall.Details
#3. remodel bathroom, remove partition wall b/t toilet and shower non bearing wall. | $9,500 |
| Nov 6, 2013 | Completed final sign-off Mar 2014 | 1201 California St | unit 1201. re-tile two bathrooms and replace two shower pans.Details
unit 1201. re-tile two bathrooms and replace two shower pans. | $8,500 |
| Jul 15, 2013 | Completed final sign-off Sep 2013 | 911 Central Av | remodel bathroom, replace tile and bathtub, replace window in-kind, no structu5ral.Details
remodel bathroom, replace tile and bathtub, replace window in-kind, no structu5ral. | $9,500 |
| Oct 11, 2012 | Never finaled issued Oct 2012, no final | 3700 Folsom St | one basement bath remodel/ to comply with complaint #201270110Details
one basement bath remodel/ to comply with complaint #201270110 | $8,000 |
| Aug 28, 2012 | Completed final sign-off May 2013 | 103 Banks St | remodel basement-add 1 bedroom, 1 bathroom & closetDetails
remodel basement-add 1 bedroom, 1 bathroom & closet | $60,000 |
| May 14, 2012 | Completed final sign-off Jun 2012 | 2295 Vallejo St | remodel bathroom and replace kitchen coutner tops, bathrm lighting shall comply with cec 150(k)8,10Details
remodel bathroom and replace kitchen coutner tops, bathrm lighting shall comply with cec 150(k)8,10 | $8,500 |
| Dec 9, 2011 | Completed final sign-off Mar 2012 | 1 Daniel Burnham Ct | remodel kitchen and bathroom in kind. non structural.Details
remodel kitchen and bathroom in kind. non structural. | $15,000 |
| Nov 17, 2011 | Completed final sign-off Feb 2012 | 875 Filbert St | replace bath tub and sink in one bathroom tile floor and walls for tub on 2nd flrDetails
replace bath tub and sink in one bathroom tile floor and walls for tub on 2nd flr | $3,200 |
| Feb 8, 2011 | Completed final sign-off May 2011 | 1839 15th St | remodel kitchen and bathroom. provide high efficacy lighting for title 24 energy code.Details
remodel kitchen and bathroom. provide high efficacy lighting for title 24 energy code. | $20,000 |
| Jan 25, 2011 | Completed final sign-off Aug 2013 | 222 Hartford St | remodel existing ground floor unit. new relocated kitchen, new relocated bath room, new configuration at gargage. single parking space to remainDetails
remodel existing ground floor unit. new relocated kitchen, new relocated bath room, new configuration at gargage. single parking space to remain | $20,000 |
| Jan 20, 2011 | Completed final sign-off Mar 2011 | 1383 South Van Ness Av | bathroom remodel in kind. replace tub and tile shower. replace sink and toilet.Details
bathroom remodel in kind. replace tub and tile shower. replace sink and toilet. | $4,500 |
| Nov 10, 2010 | Completed final sign-off Mar 2011 | 2425 Market St | remodel bathroom; unit#6. replace fixtures finishes & cabinetry.Details
remodel bathroom; unit#6. replace fixtures finishes & cabinetry. | $9,000 |
| Apr 20, 2010 | Expired or cancelled expired Feb 2013 | 1122 Page St | interior remodel @ (e) second floor dwelling unit #1. remove selected interior partitions relocate entry door remodel (e) bath, relocate kitchen, (n) laundry closet, (n) master bath.Details
interior remodel @ (e) second floor dwelling unit #1. remove selected interior partitions relocate entry door remodel (e) bath, relocate kitchen, (n) laundry closet, (n) master bath. | $65,000 |
| Apr 16, 2010 | Completed final sign-off Sep 2011 | 1122 Page St | interior renovations @ third floor rear dwelling unit. remove selected, interior partitions. remodel (e) bath, relocate (e) kitchen, relocate (e) kit., relocate (e) bedrm. (n) laundry closet. repair (e) rear yard exit stair. (n) shear walls & associated footings. (n) perimeter footing @ basement.Details
interior renovations @ third floor rear dwelling unit. remove selected, interior partitions. remodel (e) bath, relocate (e) kitchen, relocate (e) kit., relocate (e) bedrm. (n) laundry closet. repair (e) rear yard exit stair. (n) shear walls & associated footings. (n) perimeter footing @ basement. | $45,000 |
| Mar 29, 2010 | Expired or cancelled withdrawn Jun 2010 | 1122 Page St | remodel (e) bathroom & kitchen in unit #3.Details
remodel (e) bathroom & kitchen in unit #3. | $15,000 |
| Dec 18, 2009 | Completed final sign-off Jan 2010 | 1904 Leavenworth St | replace bath tub & vanity in kindDetails
replace bath tub & vanity in kind | $4,500 |
| Nov 24, 2009 | Completed final sign-off Aug 2010 | 35 Florence St | remodel interior of building. kitchen & bathroom under seperate permit. change window at 3rd & 4th floor. add plywood walls & reframe bearing wallsDetails
remodel interior of building. kitchen & bathroom under seperate permit. change window at 3rd & 4th floor. add plywood walls & reframe bearing walls | $50,000 |
| Nov 18, 2009 | Completed final sign-off Sep 2010 | 35 Florence St | remodel 3 bathrooms, 1 kitchen. replace 2 tubs & 1 1/2 bathroom. install new cabinets in bathrooms, replace kitchen cabinets & counter. no structural work & new lighting. no exhaust fanDetails
remodel 3 bathrooms, 1 kitchen. replace 2 tubs & 1 1/2 bathroom. install new cabinets in bathrooms, replace kitchen cabinets & counter. no structural work & new lighting. no exhaust fan | $7,800 |
| Aug 31, 2009 | Completed final sign-off Oct 2009 | 794 Lyon St | additional storage; revised common area hallway of 1985 golden gate ave., 794 lyon st. to be 1-hour walls. replace rotted sills & walls in basement of 794 lyon st. & 1985 golden gate ave. revision to appl.#2009/0506/7865. correction of kit./bath remodel @ 794 lyon st. instead of 792 lyon st.Details
additional storage; revised common area hallway of 1985 golden gate ave., 794 lyon st. to be 1-hour walls. replace rotted sills & walls in basement of 794 lyon st. & 1985 golden gate ave. revision to appl.#2009/0506/7865. correction of kit./bath remodel @ 794 lyon st. instead of 792 lyon st. | $10,000 |
| May 6, 2009 | Completed final sign-off Oct 2009 | 790 Lyon St | remodel kitchen/baths, provide h.e. lighting as required by title 24, replace 7 basement windows, wood in kind, u<.067 typical, repair/replace floor in basement, concrete, replace 4 vinyl windows in light well, 2 in 792 lyon & 1985 golden gate ave. remodel 1 kitchen & 2 baths in 792 lyon/1985 goldenDetails
remodel kitchen/baths, provide h.e. lighting as required by title 24, replace 7 basement windows, wood in kind, u<.067 typical, repair/replace floor in basement, concrete, replace 4 vinyl windows in light well, 2 in 792 lyon & 1985 golden gate ave. remodel 1 kitchen & 2 baths in 792 lyon/1985 golden | $95,995 |
| Jan 6, 2009 | Completed final sign-off Mar 2009 | 300 03rd St | work @ unit# 406 only. replace shower drain & membrance. shower valve. install new can lights & occupancy switch. all work in bathroom @ unit# 406 only.Details
work @ unit# 406 only. replace shower drain & membrance. shower valve. install new can lights & occupancy switch. all work in bathroom @ unit# 406 only. | $2,800 |