Back to bathroom remodel contractors
San Miguel Construction
- Based in
- Concord
- On San Francisco permits
- Apr 2021 to Sep 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 21 days from filing to permit and 721 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2023 | Completed final sign-off Sep 2025 | 1050 North Point St | unit# 709: remodel 1 existing bath with like/kind fixtures & tiles, replace existing recessed lights w/new hi efficiency lights, new tile @ bath, replace 1 existing single glazed alum window w/ new dual glazed alum window per npa spec, lik/kind replacement. replace three existing sliding glass doorsDetails
unit# 709: remodel 1 existing bath with like/kind fixtures & tiles, replace existing recessed lights w/new hi efficiency lights, new tile @ bath, replace 1 existing single glazed alum window w/ new dual glazed alum window per npa spec, lik/kind replacement. replace three existing sliding glass doors | $98,500 |
| Apr 16, 2021 | Never finaled issued May 2021, no final | 50 Henry St | remodel (e) bathrooms. add additional bathroom. upgrade electrical & plumbing.Details
remodel (e) bathrooms. add additional bathroom. upgrade electrical & plumbing. | $50,000 |