Sam Hoyer Construction Inc
- Based in
- San Diego
- On San Francisco permits
- Dec 2018 to Nov 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2021 | Completed final sign-off Jun 2023 | 1566 48th Av | remove (e) stucco on street facing facade due to dryrot damage. replace in-kind. no change to approved elevation. remove (e) siding @ south wall to living room & garage. approx 1000 sfDetails
remove (e) stucco on street facing facade due to dryrot damage. replace in-kind. no change to approved elevation. remove (e) siding @ south wall to living room & garage. approx 1000 sf | |
| Aug 25, 2020 | Completed final sign-off Jun 2023 | 1566 48th Av | construction of an adu unit per ord#95-17. a bpa # 2018-1211-7970 has already been filed to add a residential unit to the existing single family home. cost of construction is already included in the original bpa. the adu would be the 3rd unit.Details
construction of an adu unit per ord#95-17. a bpa # 2018-1211-7970 has already been filed to add a residential unit to the existing single family home. cost of construction is already included in the original bpa. the adu would be the 3rd unit. | |
| Dec 11, 2018 | Completed final sign-off Jun 2023 | 1566 48th Av | remodel (e) 2-story single family home w/ ground & 2nd floor extension & addition of 1 story. convert to 2 unit building. new unit to be 3 bedrooms & 3 baths. sprinkler and sprinkler monitoring under separate permits.Details
remodel (e) 2-story single family home w/ ground & 2nd floor extension & addition of 1 story. convert to 2 unit building. new unit to be 3 bedrooms & 3 baths. sprinkler and sprinkler monitoring under separate permits. | $500,000 |