Back to bathroom remodel contractors
Sail Forth Builders Inc
- Based in
- Corte Madera
- On San Francisco permits
- Oct 2008 to Jun 2014
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 8 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2012 | Completed final sign-off May 2014 | 2465 Pacific Av | remodel kitchen powder room, bath at 2nd floor. upgrade foundation. install plywood panel and footings under walls, install hold downs. this work is separate from future vertical addition permit.Details
remodel kitchen powder room, bath at 2nd floor. upgrade foundation. install plywood panel and footings under walls, install hold downs. this work is separate from future vertical addition permit. | $150,000 |
| May 30, 2012 | Completed final sign-off Oct 2012 | 104 Funston Av | reconfiguration and alteration to an extg residence of 2nd floor bathrooms and 2 closets. three skylights will be added as part of the master bathroom and closet alteration and an extg wood window will be relocated.Details
reconfiguration and alteration to an extg residence of 2nd floor bathrooms and 2 closets. three skylights will be added as part of the master bathroom and closet alteration and an extg wood window will be relocated. | $105,000 |
| Sep 9, 2011 | Completed final sign-off Dec 2011 | 3920 Washington St | demolish (e) jack & jill bathrooms and replace with (n) separated bathrooms 2-shower/steam shower vanities, toilets in (e) space on 2nd. flr., add closet space in same location.Details
demolish (e) jack & jill bathrooms and replace with (n) separated bathrooms 2-shower/steam shower vanities, toilets in (e) space on 2nd. flr., add closet space in same location. | $75,000 |
| Oct 31, 2008 | Completed final sign-off Apr 2010 | 531 10th Av | northwest corner is curently a back porch. project is to reconstruct this area is a 3 story horizontal addition. lower flr. on the 1st. flr. for legal headroom, create fam. rm., bath, stor. & bedrm., extend kitchen add deck & remodel kitchen on 2nd. flr., rebuild bedrm. & add bath on 3rd. flr. rev.Details
northwest corner is curently a back porch. project is to reconstruct this area is a 3 story horizontal addition. lower flr. on the 1st. flr. for legal headroom, create fam. rm., bath, stor. & bedrm., extend kitchen add deck & remodel kitchen on 2nd. flr., rebuild bedrm. & add bath on 3rd. flr. rev. | $350,000 |