Safeway Roofing & Siding Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jul 2013
- Last 24 months
- 0 permits filed
404 permits since 2000: 332 completed, 11 never finaled, 61 expired or cancelled.
Of the 11 never-finaled permits, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 12 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2009 | Completed final sign-off Aug 2009 | 4065 19th Av | remove all existing roofs to deck. install new roof with 1ply 30lb. modified base. 1 ply tupe iv glass ply and 1 ply modified bitumen w/ intermopping of hot asphalt cover parapet wall & 2 ply flashing felt. shingle area remove & replace new underlayment & 40 yr shingles. new metal around perimeterDetails
remove all existing roofs to deck. install new roof with 1ply 30lb. modified base. 1 ply tupe iv glass ply and 1 ply modified bitumen w/ intermopping of hot asphalt cover parapet wall & 2 ply flashing felt. shingle area remove & replace new underlayment & 40 yr shingles. new metal around perimeter | $11,700 |
| Feb 23, 2004 | Completed final sign-off Mar 2004 | 3885 24th St | reroofing (only rear deck, not entire building.)Details
reroofing (only rear deck, not entire building.) | $6,500 |