Back to bathroom remodel contractors
Safe Step Walk-In Tub Llc
- Based in
- Nashville
- On San Francisco permits
- Nov 2021 to Sep 2026
- Last 24 months
- 19 permits filed
60 permits since 2000: 50 completed, 3 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | Completed final sign-off Jun 2026 | 2574 19th Av | hall bathroom: replace existing shower with a walk-in shower.Details
hall bathroom: replace existing shower with a walk-in shower. | $10,000 |
| Sep 29, 2023 | Completed final sign-off Nov 2023 | 370 15th Av | bath remodel: replace tub with walk-in tub, patch drywall.Details
bath remodel: replace tub with walk-in tub, patch drywall. | $9,500 |
| Jun 5, 2023 | Completed final sign-off Jun 2023 | 160 Bridgeview Dr | bathroom tub replacement- (n) walk in tub 20amp drywall patchDetails
bathroom tub replacement- (n) walk in tub 20amp drywall patch | $9,500 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 601 Van Ness Av | bathroom remodel: remove (e) tub install (n) walk in tub replace outlet @ vanity wi/ gfci; dry wall patehDetails
bathroom remodel: remove (e) tub install (n) walk in tub replace outlet @ vanity wi/ gfci; dry wall pateh | $9,500 |
| Dec 29, 2022 | Completed final sign-off Jan 2023 | 94 Uranus Tr | (1) bathroom remodel: replace (e) tub with a walk in tub. install (1) new 20-amp circuit for the tub outlet. drywall patch.Details
(1) bathroom remodel: replace (e) tub with a walk in tub. install (1) new 20-amp circuit for the tub outlet. drywall patch. | $9,500 |
| Sep 7, 2022 | Completed final sign-off Oct 2022 | 201 Wawona St | bathroom remodel- no change to layout or wall layout- install walkin tub and (1) 20amp circuitDetails
bathroom remodel- no change to layout or wall layout- install walkin tub and (1) 20amp circuit | $9,500 |
| Jul 19, 2022 | Completed final sign-off Aug 2022 | 1422 Somerset St | replace one partial bath remodel: existing tub with a tub: install 1 new 20 amo circuit for the tub outlets: drywall patchDetails
replace one partial bath remodel: existing tub with a tub: install 1 new 20 amo circuit for the tub outlets: drywall patch | $9,500 |