Back to bathroom remodel contractors
Sablosky Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Jun 2018
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2016 | Expired or cancelled expired Apr 2019 | 170 Staples Av | demolish existing fireplace, relocate kitchen cabinet & sink. repair of (e) drains in bath. relocate 2 interior doors. replace (e) back door and 2 windows. replace hardwood floor. close in existing window.Details
demolish existing fireplace, relocate kitchen cabinet & sink. repair of (e) drains in bath. relocate 2 interior doors. replace (e) back door and 2 windows. replace hardwood floor. close in existing window. | $35,000 |
| Sep 25, 2015 | Completed final sign-off Feb 2016 | 130 Miraloma Dr | replace countertops. new sink and range hood, 1/2 bathDetails
replace countertops. new sink and range hood, 1/2 bath | $10,000 |