Saarman Construction,Ltd.
- Based in
- Alameda
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 42 permits filed
544 permits since 2000: 415 completed, 24 in progress, 53 never finaled, 52 expired or cancelled.
Of the 53 never-finaled permits, 4 are 3 to 5 years old, 24 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
74 deck permits: 68 completed, 1 in progress, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2026 | Completed final sign-off Aug 2026 | 101 Maple St | in kind water intrusion repair at decks and around posts at roof. associated repairs of damage insulation and drywall at interior.Details
in kind water intrusion repair at decks and around posts at roof. associated repairs of damage insulation and drywall at interior. | $256,853 |
| Jun 20, 2024 | In progress issued Apr 2025 | 2200 Pacific Av | replacement of the roof at pool, pool deck and perimeter area.Details
replacement of the roof at pool, pool deck and perimeter area. | $1,900,000 |
| Feb 16, 2024 | Completed final sign-off May 2025 | 1200 04th St | block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing.Details
block 5 roof memebrane and insulation. demo (e) roof membrane and insulation. provide vapor retarder, roof insulation with single ply roof membrane. repair possible wood rot at (e) wood crickets and wood/deck parapet framing. | $3,560,000 |
| Feb 15, 2024 | Completed final sign-off Apr 2026 | 1521 Sutter St | install small expansion joints b/t window frames and surrounding stucco wall, b/t stucco wall control joints, and fill with sealant. seal exterior window frame and sash seams with sealant. clean and service window hard sashes and hardware. seal and repair or replace deck access doors as req'd.Details
install small expansion joints b/t window frames and surrounding stucco wall, b/t stucco wall control joints, and fill with sealant. seal exterior window frame and sash seams with sealant. clean and service window hard sashes and hardware. seal and repair or replace deck access doors as req'd. | $650,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2019 | 216 Roosevelt Wy | 4th floor: deck remove siding to repair leak and replace in kind. 40sq ft approx. work not visible from the street.Details
4th floor: deck remove siding to repair leak and replace in kind. 40sq ft approx. work not visible from the street. | $3,000 |
| Aug 8, 2018 | Completed final sign-off Aug 2018 | 1790 Broadway | replace balcony soffit vents on all balcony soffits at 21 private decks. install removables vents to facilitate future inspectionsDetails
replace balcony soffit vents on all balcony soffits at 21 private decks. install removables vents to facilitate future inspections | $30,000 |
| Jun 22, 2018 | Completed final sign-off Jul 2020 | 1 Church St | ref pa# 201702240118; added scope of work to courtyards, sliding glass door replacements, deck coating, exterior, siding stucco, interior cosmetic repairsDetails
ref pa# 201702240118; added scope of work to courtyards, sliding glass door replacements, deck coating, exterior, siding stucco, interior cosmetic repairs | $11,000,000 |
| Aug 21, 2017 | Completed final sign-off Oct 2017 | 555 Bartlett St | remove (e) deck boards and privacy boards, replace with redwood con heart at deck and privacy walls in 2nd floor courtyard. replacement in-kind, "like for like. maher naDetails
remove (e) deck boards and privacy boards, replace with redwood con heart at deck and privacy walls in 2nd floor courtyard. replacement in-kind, "like for like. maher na | $254,562 |
| Jun 30, 2017 | Completed final sign-off Mar 2018 | 260 King St | replace 1 doors inkind at units 419. 1 private deck at podium level 419 (concrete prep & coating).Details
replace 1 doors inkind at units 419. 1 private deck at podium level 419 (concrete prep & coating). | $216,997 |
| Feb 24, 2017 | Never finaled issued Mar 2017, no final | 1 Church St | replace all windows (except 1 in unit #217 and 1 in unit #317), r&r stucco, waterproof all decks. all windows and sliders are vinyl in kind. like for likeDetails
replace all windows (except 1 in unit #217 and 1 in unit #317), r&r stucco, waterproof all decks. all windows and sliders are vinyl in kind. like for like | $3,200,000 |
| Dec 28, 2015 | Completed final sign-off Aug 2017 | 1035 Folsom St | replace all existing windows, replace all existing windows, repair cement plaster, metal siding, cement board around windows. rplace e flooring,lighting, boiler. paint exterior, creconfigure to create 5 units as accessible. garage doors, deck repairDetails
replace all existing windows, replace all existing windows, repair cement plaster, metal siding, cement board around windows. rplace e flooring,lighting, boiler. paint exterior, creconfigure to create 5 units as accessible. garage doors, deck repair | $4,000,000 |
| Apr 29, 2015 | Completed final sign-off May 2015 | 2450 Octavia St | perform structural and cosmetic repairs to facilitate the reconstruction of one balcony at 2450 unit #1c (not visible from the street). repair in kind with (n) decking and railing.Details
perform structural and cosmetic repairs to facilitate the reconstruction of one balcony at 2450 unit #1c (not visible from the street). repair in kind with (n) decking and railing. | $26,792 |
| May 15, 2014 | Completed final sign-off Jun 2014 | 468 Tehama St | remove and reinstall metal deck to install spacer between wall and deck attachment. 1/4 to 1/2 inch shim.Details
remove and reinstall metal deck to install spacer between wall and deck attachment. 1/4 to 1/2 inch shim. | $4,274 |
| Oct 9, 2013 | Completed final sign-off May 2014 | 18 Clyde St | replace rear siding and deck including walkway. replacement ofwindows and doors at rear elevation.Details
replace rear siding and deck including walkway. replacement ofwindows and doors at rear elevation. | $139,000 |
| Aug 22, 2013 | Completed final sign-off Oct 2013 | 627 Corbett Av | repair decayed joist at 2 exterior decks, rear of building. min of 3 full replacement joists & 3 partial repairs at each deck, less than 50%Details
repair decayed joist at 2 exterior decks, rear of building. min of 3 full replacement joists & 3 partial repairs at each deck, less than 50% | $20,000 |
| Jul 26, 2013 | Completed final sign-off Aug 2013 | 1718 20th Av | perform water testing of windows, sliding glass doors & exterior decks to determine the location of water leakage. testing areas will be approx. 2'x2' & not visible from street. repatch to match exist'g. where scope of work is determined to exceed the work as described, separate permit will be filedDetails
perform water testing of windows, sliding glass doors & exterior decks to determine the location of water leakage. testing areas will be approx. 2'x2' & not visible from street. repatch to match exist'g. where scope of work is determined to exceed the work as described, separate permit will be filed | $17,000 |
| Mar 6, 2012 | Completed final sign-off Mar 2013 | 45 Scenic Wy | new deck and stair addition.Details
new deck and stair addition. | $45,000 |
| Mar 6, 2012 | Completed final sign-off May 2012 | 627 Corbett Av | to comply w/his nov 201171493 dated 11.22.2011 - repair & replace in-kind dryrotted support beams & all other covers where dryrot is present on decks above unit #2.Details
to comply w/his nov 201171493 dated 11.22.2011 - repair & replace in-kind dryrotted support beams & all other covers where dryrot is present on decks above unit #2. | $18,000 |
| Oct 14, 2011 | Expired or cancelled expired Mar 2013 | 1 Crescent Wy | bldg# 3 & 4: remove and replace stucco in kind approx. 24 sq. ft. remove and reinstall (2) windows in kind. u=.4 or better. deck membrane system patch approx 64 sq. ft. compy with 201036211Details
bldg# 3 & 4: remove and replace stucco in kind approx. 24 sq. ft. remove and reinstall (2) windows in kind. u=.4 or better. deck membrane system patch approx 64 sq. ft. compy with 201036211 | $37,200 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 525 Gough St | remove e deck topping slab. perform framing repairs to rail wall. install new traffic membrane and pavers. remove sliding glass door. waterproof and reinstall.all work at unit 404 only.Details
remove e deck topping slab. perform framing repairs to rail wall. install new traffic membrane and pavers. remove sliding glass door. waterproof and reinstall.all work at unit 404 only. | $68,000 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 1079 Capitol Av | perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work.Details
perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 392 Faxon Av | perform deck decay repair @ edge of decks scupper. replace in kind. replace in kind metal flashing. post saddles at 3 locations on deck. no structural.Details
perform deck decay repair @ edge of decks scupper. replace in kind. replace in kind metal flashing. post saddles at 3 locations on deck. no structural. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 396 Faxon Av | perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work.Details
perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 352 Faxon Av | perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work.Details
perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 366 Faxon Av | perform deck decay repair @ edge of decks scupper. replace in kind. replace in kind metal flashing. post saddles at 3 locations on deck. no structural.Details
perform deck decay repair @ edge of decks scupper. replace in kind. replace in kind metal flashing. post saddles at 3 locations on deck. no structural. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 368 Faxon Av | perform deck decay repair @ edge of decks scupper. replace in kind. replace in kind metal flashing. post saddles at 3 locations on deck. no structural.Details
perform deck decay repair @ edge of decks scupper. replace in kind. replace in kind metal flashing. post saddles at 3 locations on deck. no structural. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 1053 Capitol Av | perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work.Details
perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 1093 Capitol Av | perfrom deck decay repair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work.Details
perfrom deck decay repair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work. | $4,220 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 1075 Capitol Av | perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work.Details
perfrom deck decay rrepair at edge of deck's upper. replace in-kind. replace in kind metal of flushing post saddles at three locations on deck. no structural work. | $4,220 |
| Mar 10, 2011 | Completed final sign-off Jun 2011 | 220 Lombard St | maintenance coat on deck, waterprofing repairs, replace storefront solarium in-kind of unit only.Details
maintenance coat on deck, waterprofing repairs, replace storefront solarium in-kind of unit only. | $86,000 |
| Oct 13, 2010 | Completed final sign-off Feb 2011 | 725 Greenwich St | exterior leak repair at siding and side deck. under 50%, non structural work only under this permit, siding replace in kind, repair deck with dex-o-tex roof covering, handicapped access issues exempted for this work.Details
exterior leak repair at siding and side deck. under 50%, non structural work only under this permit, siding replace in kind, repair deck with dex-o-tex roof covering, handicapped access issues exempted for this work. | $14,000 |
| Jan 22, 2010 | Completed final sign-off May 2010 | 101 Lombard St | remove (e) liner at pool & spa & install (n) fiberglass coating. installs (n) windscreen around pool deck @ 5'-0".Details
remove (e) liner at pool & spa & install (n) fiberglass coating. installs (n) windscreen around pool deck @ 5'-0". | $134,733 |
| Nov 13, 2009 | Completed final sign-off Dec 2009 | 6124 Fulton St | remove head & jamb trim @ garage door opening. remove stucco @ garage door to top deck. install gsm flashing collars at deck support. install building papel tied into (e). install new head & jamb trim, new flusing, new stucco, paint.Details
remove head & jamb trim @ garage door opening. remove stucco @ garage door to top deck. install gsm flashing collars at deck support. install building papel tied into (e). install new head & jamb trim, new flusing, new stucco, paint. | $4,987 |
| Oct 16, 2009 | Completed final sign-off Mar 2010 | 4538 17th St | waterproofing repairs sto siding, windows, doors at 4th and 5th fl decks. visible from street. front of building. non structuralDetails
waterproofing repairs sto siding, windows, doors at 4th and 5th fl decks. visible from street. front of building. non structural | $38,000 |
| Sep 28, 2009 | Completed final sign-off Jun 2010 | 955 Leavenworth St | replace (e) 55 windows & replace trim at windows. maintain any existing rescue/egress windows. replace siding & gypsum @ south wall and maintain existing fire rating. replace deck membranes on south & north decks. raise (e) skylight curb on roof. repair gwp ceiling of garage due to water damage.Details
replace (e) 55 windows & replace trim at windows. maintain any existing rescue/egress windows. replace siding & gypsum @ south wall and maintain existing fire rating. replace deck membranes on south & north decks. raise (e) skylight curb on roof. repair gwp ceiling of garage due to water damage. | $240,000 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 158 Clara St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 157 Shipley St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 161 Shipley St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 156 Clara St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 151 Shipley St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 154 Clara St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 155 Shipley St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 153 Shipley St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 163 Shipley St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Sep 3, 2009 | Completed final sign-off Oct 2009 | 2407 Harrison St | remove stucco around door & window to install new waterproof. remove railing lags & install scalant reinstall lags, remove 1st row of tiles on deck. install new edge metal & saddles. apply new waterproof membrance to tie in with (e). reinstall tile & stucco, not visible from streetDetails
remove stucco around door & window to install new waterproof. remove railing lags & install scalant reinstall lags, remove 1st row of tiles on deck. install new edge metal & saddles. apply new waterproof membrance to tie in with (e). reinstall tile & stucco, not visible from street | $17,000 |
| Sep 3, 2009 | Completed final sign-off Jan 2010 | 150 Clara St | replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street.Details
replace deck railing in kind( 42" hieght with 4" space). replace decayed trim in kind. recoat traffic membrain on extg deck. paint complex. not visible from the street. | $5,400 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 169 Shipley St | replace deck railings in kind, repl decayed trim in kind, recoat traffic membrane on existing decks, paint complex, repairs not visible from streetDetails
replace deck railings in kind, repl decayed trim in kind, recoat traffic membrane on existing decks, paint complex, repairs not visible from street | $5,400 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 165 Shipley St | repl deck rail in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from streetDetails
repl deck rail in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from street | $5,400 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 149 Shipley St | repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from streetDetails
repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from street | $5,400 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 152 Clara St | repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from streetDetails
repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from street | $5,400 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 167 Shipley St | repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from stDetails
repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from st | $5,400 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 171 Shipley St | repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from streetDetails
repl deck railing in kind, repl decayed trim in kind, re-coat traffic membrane on existing deck, paint complex, repairs not visible from street | $5,400 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 159 Shipley St | repl deck railing in kind, repl decayed trim in kind re-coat traffic membrane on deck, paint complex, repairs not visible from streetDetails
repl deck railing in kind, repl decayed trim in kind re-coat traffic membrane on deck, paint complex, repairs not visible from street | $5,400 |
| Oct 20, 2008 | Completed final sign-off Apr 2009 | 1025 17th St | work @ unit# 9 & unit# 10 only. install new polyurethane deck coating system, approx 1753 sq. ft. install new flashing metal at deck's perimeter. replace 6 new french doors and self adhering flashing and door pan.Details
work @ unit# 9 & unit# 10 only. install new polyurethane deck coating system, approx 1753 sq. ft. install new flashing metal at deck's perimeter. replace 6 new french doors and self adhering flashing and door pan. | $125,506 |
| Sep 5, 2008 | Completed final sign-off Jul 2009 | 2440 Bush St | front/west facade demo (e) siding & cement plaster & install new bldg paper, flashing, siding, & cement plaster (3,800 sq ft). remove & install new deck waterprofing system. (4 decks 500 sq ft). remove & install 10 new wndws. remove & install 4 new sliding glass doors.all work replace in kind.Details
front/west facade demo (e) siding & cement plaster & install new bldg paper, flashing, siding, & cement plaster (3,800 sq ft). remove & install new deck waterprofing system. (4 decks 500 sq ft). remove & install 10 new wndws. remove & install 4 new sliding glass doors.all work replace in kind. | $182,000 |
| Sep 2, 2008 | Completed final sign-off Oct 2008 | 1225 Washington St | #401- remove existing sliding glass door & install new sgd & flashing, 1 loc. demo existing tile & plywood sheathing on private deck, re-install new plywood, water proofing membrane system, metal flashing & deck tile (40sq.ft.) install new metal flashing along stairs from garage to rear deck (20 lf)Details
#401- remove existing sliding glass door & install new sgd & flashing, 1 loc. demo existing tile & plywood sheathing on private deck, re-install new plywood, water proofing membrane system, metal flashing & deck tile (40sq.ft.) install new metal flashing along stairs from garage to rear deck (20 lf) | $20,000 |
| Mar 6, 2008 | Completed final sign-off Mar 2008 | 479 Chenery St | decay repair around windows and siding. replace approx 150 sq ft of siding in like kind. install new rim joists for deck (rear)Details
decay repair around windows and siding. replace approx 150 sq ft of siding in like kind. install new rim joists for deck (rear) | $6,100 |
| Aug 30, 2007 | Completed final sign-off Jun 2008 | 1700 Gough St | replace exterior woodsiding and shingles with fiber cement siding products. replace aluminum wndw and doors with same size and location at 5th level and roof. replacement at public and private balaconies and decks. traffic coat replacement at private decks. replace exterior lights with like kindDetails
replace exterior woodsiding and shingles with fiber cement siding products. replace aluminum wndw and doors with same size and location at 5th level and roof. replacement at public and private balaconies and decks. traffic coat replacement at private decks. replace exterior lights with like kind | $1,053,698 |
| Mar 13, 2006 | Completed final sign-off Jun 2006 | 14 28th St | siding replacement at the rear elevation and trim. install new window at rear. water proofing the (e) deck.Details
siding replacement at the rear elevation and trim. install new window at rear. water proofing the (e) deck. | $76,823 |
| Nov 1, 2005 | Completed final sign-off Feb 2006 | 158 Carnelian Wy | remove (e)floor tile on deck approx 8x7 expose membrane underneath & replace walk on membrane.no retile make back into deck.Details
remove (e)floor tile on deck approx 8x7 expose membrane underneath & replace walk on membrane.no retile make back into deck. | $8,000 |
| Jun 3, 2005 | Completed final sign-off Oct 2005 | 875 La Playa | delete interior corridor membrane work&replc all 2/fl sliding glass dr&new membrane on all 2/fl deckDetails
delete interior corridor membrane work&replc all 2/fl sliding glass dr&new membrane on all 2/fl deck | $150,000 |
| Jun 3, 2005 | Completed final sign-off Oct 2005 | 855 La Playa | delete interior corridor membrane work&replc all 2/fl sliding glass dr&new membrane on all 2/fl deckDetails
delete interior corridor membrane work&replc all 2/fl sliding glass dr&new membrane on all 2/fl deck | $150,000 |
| Nov 17, 2003 | Completed final sign-off Mar 2004 | 865 Vallejo St | remove/replace (e) deck membrane, edge flashing, install new doors sheet metal pan, new adjacent dooDetails
remove/replace (e) deck membrane, edge flashing, install new doors sheet metal pan, new adjacent doo | $22,500 |
| Oct 2, 2003 | Completed final sign-off Mar 2004 | 2859 Clay St | remove & replace doors as in kind,remove & replace siding as in kind,reflash,recoat decks,repairDetails
remove & replace doors as in kind,remove & replace siding as in kind,reflash,recoat decks,repair | $56,000 |
| Jun 20, 2003 | Completed final sign-off Jul 2003 | 1150 Lombard St | replace decayed deck members (rim joist per drawing)Details
replace decayed deck members (rim joist per drawing) | $9,000 |
| May 23, 2003 | Expired or cancelled expired Aug 2006 | 57 Arbor St | replace & remove as in kind,deck membrane,sheet metal & corners flashing,install new membrane,sheetDetails
replace & remove as in kind,deck membrane,sheet metal & corners flashing,install new membrane,sheet | $10,000 |
| Mar 13, 2003 | Completed final sign-off Aug 2003 | 600 Fulton St | reflash sliding glass door/repair deck/sheet metal/repair & rplc stucco in kindDetails
reflash sliding glass door/repair deck/sheet metal/repair & rplc stucco in kind | $24,000 |
| Dec 4, 2002 | Completed final sign-off Aug 2003 | 807 Laguna St | reflash siiding glass door , repair deck, shoot metal flashing ortopping of the deck, one unit only,Details
reflash siiding glass door , repair deck, shoot metal flashing ortopping of the deck, one unit only, | $12,000 |
| Oct 29, 2002 | Completed final sign-off Aug 2003 | 725 Greenwich St | leak repair & remove sliding glass doors for gill-dan flashing installation & deck coating resurfaciDetails
leak repair & remove sliding glass doors for gill-dan flashing installation & deck coating resurfaci | $50,000 |
| Oct 11, 2002 | Completed final sign-off Apr 2003 | 1930 Eddy St | siding replacement, trim, bldg paper,windows louvers,decks edge flashing,parapet copings incorporateDetails
siding replacement, trim, bldg paper,windows louvers,decks edge flashing,parapet copings incorporate | $65,500 |
| Sep 30, 2002 | Never finaled issued Sep 2002, no final | 1839 15th St | remove/replace belly bend trimmer, recoatiing 1 deck,Details
remove/replace belly bend trimmer, recoatiing 1 deck, | $10,000 |
| Feb 23, 2001 | Expired or cancelled expired Aug 2001 | 900 Green St | decking repair: windscreen, hadrail to external balcony per/plansDetails
decking repair: windscreen, hadrail to external balcony per/plans | $8,000 |
| Aug 25, 2000 | Completed final sign-off Jan 2001 | 3240 Sacramento St | repair decks membrane including adjacent stucco repair, greenhouse window system, walls perimeter,Details
repair decks membrane including adjacent stucco repair, greenhouse window system, walls perimeter, | $80,000 |
| Feb 4, 2000 | Completed final sign-off Sep 2000 | 1057 Lombard St | repair deck leaks, remove & replace deteriorated ext. doorsDetails
repair deck leaks, remove & replace deteriorated ext. doors |