Back to bathroom remodel contractors
Saap Construction
- Based in
- Newark
- On San Francisco permits
- Jul 2025 to Feb 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2026 | Completed final sign-off Jun 2026 | 338 Main St | unit 36c: primary bathroom shower remodel, replace vanity countertop, replace gfci receptacle.Details
unit 36c: primary bathroom shower remodel, replace vanity countertop, replace gfci receptacle. | $7,350 |
| Jan 6, 2026 | Expired or cancelled cancelled Feb 2026 | 338 Main St | 36b: bathroom remodel like for like.demo shower walls and floor, demo vanity top & sinks 2, install shower pan tile & porcelain slab for shower walls. install sinks 2 like for like. replace vanity top with new porcelain slab. replace 3 gfci recepticles in bathroom. bathroom type:master bathroom.Details
36b: bathroom remodel like for like.demo shower walls and floor, demo vanity top & sinks 2, install shower pan tile & porcelain slab for shower walls. install sinks 2 like for like. replace vanity top with new porcelain slab. replace 3 gfci recepticles in bathroom. bathroom type:master bathroom. | $6,000 |
| Jul 21, 2025 | Completed final sign-off Nov 2025 | 3976 Alemany Bl | guest bathroom remodel: remove tub, replace with curbed walk in shower. replace all plumbing fixtures, exhaust fan, bath accessories, wall paint, shower wall and all floor tile. adding new lighting, outlets and switches.Details
guest bathroom remodel: remove tub, replace with curbed walk in shower. replace all plumbing fixtures, exhaust fan, bath accessories, wall paint, shower wall and all floor tile. adding new lighting, outlets and switches. | $9,000 |