S Hall Builders Inc
- Based in
- S.F
- On San Francisco permits
- Aug 2002 to Apr 2022
- Last 24 months
- 0 permits filed
49 permits since 2000: 37 completed, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 362 days from filing to permit and 368 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2016 | Completed final sign-off Mar 2020 | 60 Eureka St | rear addition. (n) foundation & flat roof. (n) doors & windows @ rear wall. (n) exterior stair & deck. (n) elec & plumb. bathroomDetails
rear addition. (n) foundation & flat roof. (n) doors & windows @ rear wall. (n) exterior stair & deck. (n) elec & plumb. bathroom | $130,000 |
| Feb 22, 2016 | Completed final sign-off May 2017 | 575 28th St | remove exterior spiral stair from 3rd flr rear deck to grade. replace with a fire escape balcony & inclined ladder from 3rd flr deck to second flr deck. and new exterior wood stair from 2nd flr deck to grade.Details
remove exterior spiral stair from 3rd flr rear deck to grade. replace with a fire escape balcony & inclined ladder from 3rd flr deck to second flr deck. and new exterior wood stair from 2nd flr deck to grade. | $30,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2016 | 229 Oak Park Dr | add new deck from the second floor in the rear, replace existing low retaining wall with new low concrete retaining wall.Details
add new deck from the second floor in the rear, replace existing low retaining wall with new low concrete retaining wall. | $25,000 |
| Apr 16, 2014 | Completed final sign-off Dec 2016 | 273 Minerva St | construct rear 2 level deck with stairs. remove & replace 2 windows & 3 doors @ rear facade. install beam between family room / rec. room on 1st floor.Details
construct rear 2 level deck with stairs. remove & replace 2 windows & 3 doors @ rear facade. install beam between family room / rec. room on 1st floor. | $30,000 |