Back to bathroom remodel contractors
S F Rehabitat
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Jun 2010
- Last 24 months
- 0 permits filed
24 permits since 2000: 16 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2010 | Completed final sign-off Apr 2011 | 95 05th Av | revision to pa# 2008-0418-0055s, 2009-1211-3062 & 2010-0323-8732-construct staircase from 1st floor to basement/storage. construct 1/2 bathroom at basement/storage.Details
revision to pa# 2008-0418-0055s, 2009-1211-3062 & 2010-0323-8732-construct staircase from 1st floor to basement/storage. construct 1/2 bathroom at basement/storage. | $30,000 |
| Jan 22, 2009 | Never finaled issued May 2009, no final | 2715 Scott St | remodel 2 bathrooms, add 2 flat skylights, replace 8 windows, replace interior stair on 2nd and 3rd floors, add pocket doors at kitchen, reface garage, replace garage doors, add closets, n cabinetryDetails
remodel 2 bathrooms, add 2 flat skylights, replace 8 windows, replace interior stair on 2nd and 3rd floors, add pocket doors at kitchen, reface garage, replace garage doors, add closets, n cabinetry | $75,000 |
| Jun 2, 2008 | Completed final sign-off Dec 2008 | 44 Macondray Ln | explorator-non structural -light demo 1st bedroom(between rooms) 2nd master bath.Details
explorator-non structural -light demo 1st bedroom(between rooms) 2nd master bath. | $7,000 |
| Sep 14, 2005 | Expired or cancelled expired Aug 2006 | 2522 Broadway | demo non-structural demo kitchen and two bathrooms (in kind)Details
demo non-structural demo kitchen and two bathrooms (in kind) | $2,000 |
| Jan 10, 2005 | Completed final sign-off Sep 2005 | 1118 Broadway | non structural kitchen & bathroom remodel including new electrical, cabinets, tiles and bath fixtureDetails
non structural kitchen & bathroom remodel including new electrical, cabinets, tiles and bath fixture | $25,000 |
| Aug 16, 2004 | Completed final sign-off Mar 2005 | 1430 Masonic Av | remodel bathroom-new wiring, replumbing-no structural alteration. plumbing & electrical works in sepDetails
remodel bathroom-new wiring, replumbing-no structural alteration. plumbing & electrical works in sep | $9,000 |