Back to bathroom remodel contractors
S F Builders
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Aug 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2015 | Completed final sign-off Dec 2015 | 6930 California St | revision to pa 2014 0320 1209s1. revise wording to reflect new full bath at 1st floor.Details
revision to pa 2014 0320 1209s1. revise wording to reflect new full bath at 1st floor. | |
| Mar 20, 2014 | Completed final sign-off Dec 2015 | 6930 California St | single story rear addition 8'x13'4", new half bathroom at 1/f and full bath at 2/f.Details
single story rear addition 8'x13'4", new half bathroom at 1/f and full bath at 2/f. | $80,000 |
| Feb 24, 2012 | Completed final sign-off Dec 2012 | 3445 Clay St | install new lights in bedrooms, hallway, living room, dining room. shower pan and re-tiel master bathroom. re-sheetrock ceilingsthat are open. refinish hardwood floors. lighting that complies with cec 150 (k)10Details
install new lights in bedrooms, hallway, living room, dining room. shower pan and re-tiel master bathroom. re-sheetrock ceilingsthat are open. refinish hardwood floors. lighting that complies with cec 150 (k)10 | $50,000 |
| Dec 16, 2010 | Completed final sign-off Jan 2011 | 3446 Clay St | remodel master bathroom, install new fixtures of old location, replace tile, install 4 new cnas in living room with dimmer switch, no structural work, new lighting comply with cec 150(k)Details
remodel master bathroom, install new fixtures of old location, replace tile, install 4 new cnas in living room with dimmer switch, no structural work, new lighting comply with cec 150(k) | $8,500 |
| Feb 5, 2010 | Completed final sign-off Jan 2011 | 1650 42nd Av | horizontal addition to rear bldg, alteration (e) entrance ktichen & bedrooms. add 2 bedrooms at 2nd floor, add 2 bedrooms & bathroom at 1st floor.Details
horizontal addition to rear bldg, alteration (e) entrance ktichen & bedrooms. add 2 bedrooms at 2nd floor, add 2 bedrooms & bathroom at 1st floor. | $100,000 |