Back to bathroom remodel contractors
S F Bay Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Oct 2020
- Last 24 months
- 0 permits filed
124 permits since 2000: 102 completed, 9 never finaled, 13 expired or cancelled.
Of the 9 never-finaled permits, 5 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 18 completed, 1 never finaled, 1 expired or cancelled. Typically 10 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2018 | Never finaled issued Jul 2019, no final | 1750 Filbert St | rear building adu per ordiance 162-16. infill (e) 1st fl or (e) 2 unit flat. unit 1 bed and 1 bath, structural work. new electrical, plumbing and mechanical. 812 sf of unit and 168 sf mech,circulation and storageDetails
rear building adu per ordiance 162-16. infill (e) 1st fl or (e) 2 unit flat. unit 1 bed and 1 bath, structural work. new electrical, plumbing and mechanical. 812 sf of unit and 168 sf mech,circulation and storage | $120,000 |
| Sep 30, 2016 | Expired or cancelled expired Jun 2024 | 115 Cherry St | remodel of 1st flr stair - add connection to family room. new bath at basement. remodel kitchen (e), fill in rear stair for laundry room. new stair outside to yardDetails
remodel of 1st flr stair - add connection to family room. new bath at basement. remodel kitchen (e), fill in rear stair for laundry room. new stair outside to yard | $185,000 |
| Jan 12, 2015 | Completed final sign-off Aug 2015 | 341 Mississippi St | kitchen remodel, add upstairs bathroom & structural improvement.Details
kitchen remodel, add upstairs bathroom & structural improvement. | $45,000 |
| Dec 5, 2014 | Completed final sign-off Sep 2015 | 563 Waller St | kitchen remodel and bathroom and laundry addition to 3rd floor unit within existing building footprint.Details
kitchen remodel and bathroom and laundry addition to 3rd floor unit within existing building footprint. | $10,000 |
| Dec 3, 2013 | Completed final sign-off Mar 2014 | 1392 Plymouth Av | new family room, bathroom, office at extg storage area at 1st floor. install 7 new windows at side and rear yard. install french doors at rear, lower slab 6" at new rooms.Details
new family room, bathroom, office at extg storage area at 1st floor. install 7 new windows at side and rear yard. install french doors at rear, lower slab 6" at new rooms. | $75,000 |
| May 21, 2013 | Completed final sign-off Nov 2013 | 3343 Jackson St | remodel kitchen and 2 bathrooms - replace all fixtures and fittings/tile, etc. replace in kind. no strucutral work.Details
remodel kitchen and 2 bathrooms - replace all fixtures and fittings/tile, etc. replace in kind. no strucutral work. | $42,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 230 Santa Paula Av | revision to pa# 201208097007. excavate portions of basement & 1st fl level to add office at 1st, exercise & bed/bath at basement. reconfigure windows & insulated doors at basement & 1st level (rooms added). new electrical work. relocate laundry to 1st fl.Details
revision to pa# 201208097007. excavate portions of basement & 1st fl level to add office at 1st, exercise & bed/bath at basement. reconfigure windows & insulated doors at basement & 1st level (rooms added). new electrical work. relocate laundry to 1st fl. | $50,000 |
| Aug 23, 2012 | Completed final sign-off Feb 2015 | 1133 19th St | remove detached garage @ rear yard. expand (e) deck @ rear yard. new garage under deck, add approx 50 sq. ft. enclosed space under (e) building overhang @ rear year. add new 3rd story with family room, 2 bedrooms, 1 bath & 2 decks.Details
remove detached garage @ rear yard. expand (e) deck @ rear yard. new garage under deck, add approx 50 sq. ft. enclosed space under (e) building overhang @ rear year. add new 3rd story with family room, 2 bedrooms, 1 bath & 2 decks. | $362,000 |
| Aug 9, 2012 | Completed final sign-off May 2013 | 230 Santa Paula Av | relocate kitchen to entry level. reloacte master bm+ba to (e) kitchen area. remodle 2 baths. claim attic. add stair to attic+install (1) new bedrm+full bath,skyligh,dormDetails
relocate kitchen to entry level. reloacte master bm+ba to (e) kitchen area. remodle 2 baths. claim attic. add stair to attic+install (1) new bedrm+full bath,skyligh,dorm | $100,000 |
| Jun 22, 2012 | Completed final sign-off Aug 2013 | 708 03rd Av | horizontal addition. ground floor: add bath & family room. 2nd floor: horizontal addition & interior remodel. 3rd floor: interior alterations.Details
horizontal addition. ground floor: add bath & family room. 2nd floor: horizontal addition & interior remodel. 3rd floor: interior alterations. | $150,000 |
| Mar 20, 2012 | Completed final sign-off Jun 2012 | 821 Head St | interior remodel at gr floor, new full bath, family room, bedrooms. new stairs to 2nd fl. changes to e deck. new wood windows and patio doorsDetails
interior remodel at gr floor, new full bath, family room, bedrooms. new stairs to 2nd fl. changes to e deck. new wood windows and patio doors | $710,000 |
| Dec 29, 2011 | Completed final sign-off Jun 2013 | 944 Noe St | comply with nov# 200808589. demolish (e) stairway, rebuild stairway to 2010 bldg code. add new deck & balcony, alter rear facade, remodel (e) bathrooms & kitchens, regrade rear patio.Details
comply with nov# 200808589. demolish (e) stairway, rebuild stairway to 2010 bldg code. add new deck & balcony, alter rear facade, remodel (e) bathrooms & kitchens, regrade rear patio. | $240,000 |
| Jun 20, 2011 | Completed final sign-off Nov 2011 | 346 27th St | interior remodel-1st floor-add 1 bedroom, 1 bathroom, family room, laundry room. 2nd floor-remodel kitchen, new stairs to 1st floor, new deck at rear & west sideDetails
interior remodel-1st floor-add 1 bedroom, 1 bathroom, family room, laundry room. 2nd floor-remodel kitchen, new stairs to 1st floor, new deck at rear & west side | $110,000 |
| Apr 18, 2011 | Completed final sign-off Sep 2011 | 166 Madrone Av | new 1-story deck @ rear, interior remodel; 1st. flr.-(n) bed, family rm., bath+laundry rm. 2nd. flr. (e) kitchen remodel, 3rd. flr.-remodel (e) bath+(n) skylights. replace all (e) windows with (n) in-kind. replace (e) furnace+water heater.Details
new 1-story deck @ rear, interior remodel; 1st. flr.-(n) bed, family rm., bath+laundry rm. 2nd. flr. (e) kitchen remodel, 3rd. flr.-remodel (e) bath+(n) skylights. replace all (e) windows with (n) in-kind. replace (e) furnace+water heater. | $45,000 |
| Mar 11, 2011 | Completed final sign-off Apr 2011 | 218 20th Av | as-is bathroom remodel, replacing tub, sink and vanity, toilet, light and fan, wall tile, floor tile. all in same place. 64 sq. ft. bathroom. lighting chanes must comply with cec 150(k)Details
as-is bathroom remodel, replacing tub, sink and vanity, toilet, light and fan, wall tile, floor tile. all in same place. 64 sq. ft. bathroom. lighting chanes must comply with cec 150(k) | $15,000 |
| Dec 22, 2010 | Completed final sign-off Feb 2011 | 1177 California St | replace wood flooring in kind, replace 1 kitchen countertop, paint unit, replace tile & fixtures in bathroom, replace existing electrical trim & lights. lighting changes to comply with cec 150(k)Details
replace wood flooring in kind, replace 1 kitchen countertop, paint unit, replace tile & fixtures in bathroom, replace existing electrical trim & lights. lighting changes to comply with cec 150(k) | $10,000 |
| Feb 19, 2010 | Completed final sign-off Sep 2010 | 4037 25th St | dry rot repair through out (e)penthousebedroom. (n) roofdeck and bath, add tub to (e0 bath at 2nd fl. remodel (e0 breakfast room at 2nd flDetails
dry rot repair through out (e)penthousebedroom. (n) roofdeck and bath, add tub to (e0 bath at 2nd fl. remodel (e0 breakfast room at 2nd fl | $25,000 |
| Apr 8, 2008 | Completed final sign-off Mar 2011 | 1543 Felton St | horizontal addition of appx 624 sqft. new master bedroom, bath and closet on the ground floor. interior remodeling family room on the 2nd floor. new roof deck at on the 2nd floor.Details
horizontal addition of appx 624 sqft. new master bedroom, bath and closet on the ground floor. interior remodeling family room on the 2nd floor. new roof deck at on the 2nd floor. | $245,000 |
| Jan 30, 2006 | Completed final sign-off May 2006 | 2062 Pine St | revision 200505162451 new 1/2 bath. relocate full bath on bottom floor. e windows at closet not shown on orig app. new closet. all work is within existing envelope,all work is interiorDetails
revision 200505162451 new 1/2 bath. relocate full bath on bottom floor. e windows at closet not shown on orig app. new closet. all work is within existing envelope,all work is interior | $4,000 |
| Sep 2, 2005 | Completed final sign-off Nov 2005 | 2490 17th Av | convert 1/2 of current garage space into playroom, 1 bathroom and closet space.Details
convert 1/2 of current garage space into playroom, 1 bathroom and closet space. | $75,000 |