Back to kitchen remodel contractors
S F Bay Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Oct 2020
- Last 24 months
- 0 permits filed
124 permits since 2000: 102 completed, 9 never finaled, 13 expired or cancelled.
Of the 9 never-finaled permits, 5 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2016 | Expired or cancelled expired Jun 2024 | 115 Cherry St | remodel of 1st flr stair - add connection to family room. new bath at basement. remodel kitchen (e), fill in rear stair for laundry room. new stair outside to yardDetails
remodel of 1st flr stair - add connection to family room. new bath at basement. remodel kitchen (e), fill in rear stair for laundry room. new stair outside to yard | $185,000 |
| Apr 21, 2015 | Completed final sign-off Aug 2015 | 96 Inverness Dr | renovate existing kitchen, remove segment of interior partition, add new interior partition; reconfigure existing coat closet, add new pantry.Details
renovate existing kitchen, remove segment of interior partition, add new interior partition; reconfigure existing coat closet, add new pantry. | $28,000 |
| Jan 12, 2015 | Completed final sign-off Aug 2015 | 341 Mississippi St | kitchen remodel, add upstairs bathroom & structural improvement.Details
kitchen remodel, add upstairs bathroom & structural improvement. | $45,000 |
| Dec 5, 2014 | Completed final sign-off Sep 2015 | 563 Waller St | kitchen remodel and bathroom and laundry addition to 3rd floor unit within existing building footprint.Details
kitchen remodel and bathroom and laundry addition to 3rd floor unit within existing building footprint. | $10,000 |
| May 21, 2013 | Completed final sign-off Nov 2013 | 3343 Jackson St | remodel kitchen and 2 bathrooms - replace all fixtures and fittings/tile, etc. replace in kind. no strucutral work.Details
remodel kitchen and 2 bathrooms - replace all fixtures and fittings/tile, etc. replace in kind. no strucutral work. | $42,000 |
| Aug 9, 2012 | Completed final sign-off May 2013 | 230 Santa Paula Av | relocate kitchen to entry level. reloacte master bm+ba to (e) kitchen area. remodle 2 baths. claim attic. add stair to attic+install (1) new bedrm+full bath,skyligh,dormDetails
relocate kitchen to entry level. reloacte master bm+ba to (e) kitchen area. remodle 2 baths. claim attic. add stair to attic+install (1) new bedrm+full bath,skyligh,dorm | $100,000 |
| Dec 29, 2011 | Completed final sign-off Jun 2013 | 944 Noe St | comply with nov# 200808589. demolish (e) stairway, rebuild stairway to 2010 bldg code. add new deck & balcony, alter rear facade, remodel (e) bathrooms & kitchens, regrade rear patio.Details
comply with nov# 200808589. demolish (e) stairway, rebuild stairway to 2010 bldg code. add new deck & balcony, alter rear facade, remodel (e) bathrooms & kitchens, regrade rear patio. | $240,000 |
| Jun 20, 2011 | Completed final sign-off Nov 2011 | 346 27th St | interior remodel-1st floor-add 1 bedroom, 1 bathroom, family room, laundry room. 2nd floor-remodel kitchen, new stairs to 1st floor, new deck at rear & west sideDetails
interior remodel-1st floor-add 1 bedroom, 1 bathroom, family room, laundry room. 2nd floor-remodel kitchen, new stairs to 1st floor, new deck at rear & west side | $110,000 |
| Apr 18, 2011 | Completed final sign-off Sep 2011 | 166 Madrone Av | new 1-story deck @ rear, interior remodel; 1st. flr.-(n) bed, family rm., bath+laundry rm. 2nd. flr. (e) kitchen remodel, 3rd. flr.-remodel (e) bath+(n) skylights. replace all (e) windows with (n) in-kind. replace (e) furnace+water heater.Details
new 1-story deck @ rear, interior remodel; 1st. flr.-(n) bed, family rm., bath+laundry rm. 2nd. flr. (e) kitchen remodel, 3rd. flr.-remodel (e) bath+(n) skylights. replace all (e) windows with (n) in-kind. replace (e) furnace+water heater. | $45,000 |
| Dec 22, 2010 | Completed final sign-off Feb 2011 | 1177 California St | replace wood flooring in kind, replace 1 kitchen countertop, paint unit, replace tile & fixtures in bathroom, replace existing electrical trim & lights. lighting changes to comply with cec 150(k)Details
replace wood flooring in kind, replace 1 kitchen countertop, paint unit, replace tile & fixtures in bathroom, replace existing electrical trim & lights. lighting changes to comply with cec 150(k) | $10,000 |
| Oct 20, 2010 | Completed final sign-off Dec 2010 | 1101 Green St | suite #304 - remove & replace kitchen cabinets & countertops. minimum 50% of kitchen lighting watt shall be high efficient lights, no wall relocation.Details
suite #304 - remove & replace kitchen cabinets & countertops. minimum 50% of kitchen lighting watt shall be high efficient lights, no wall relocation. | $7,000 |
| Aug 30, 2007 | Completed final sign-off Apr 2008 | 975 Lombard St | replace kitchen cabinets and countertops in both units cherry cabinets and laminate topsDetails
replace kitchen cabinets and countertops in both units cherry cabinets and laminate tops | $20,000 |