Back to bathroom remodel contractors
S.E.A Construction
- Based in
- San Mateo
- On San Francisco permits
- Mar 2000 to Oct 2022
- Last 24 months
- 0 permits filed
62 permits since 2000: 52 completed, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 14 completed, 1 expired or cancelled. Typically 8 days from filing to permit and 227 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2016 | Completed final sign-off Jan 2018 | 345 Vicente St | two bedrooms and 1 bath in (e) basement garage area. entertainment roomDetails
two bedrooms and 1 bath in (e) basement garage area. entertainment room | $55,000 |
| Apr 16, 2015 | Completed final sign-off Jul 2016 | 79 Everson St | remodel upper level kitchen, s. window wall and deck. at lower level remodel bedrooms, baths, media room and laundry. upgrage all windows. extend (e) concrete stair and landing to sidewalk.Details
remodel upper level kitchen, s. window wall and deck. at lower level remodel bedrooms, baths, media room and laundry. upgrage all windows. extend (e) concrete stair and landing to sidewalk. | $125,000 |
| Sep 22, 2014 | Completed final sign-off Jul 2015 | 1938 16th Av | 2nd flr: remodel existing master bedroom and master bathroom, new powder room. no bearing walls to be removed.Details
2nd flr: remodel existing master bedroom and master bathroom, new powder room. no bearing walls to be removed. | $50,000 |
| Jun 28, 2013 | Completed final sign-off Oct 2013 | 650 Delancey St | remodel of 2 existing bathroomsDetails
remodel of 2 existing bathrooms | $35,000 |
| May 17, 2013 | Completed final sign-off Oct 2013 | 650 Delancey St | unit #411:renovate kitchen and 2 bathrooms. new floor covering.Details
unit #411:renovate kitchen and 2 bathrooms. new floor covering. | $85,000 |
| Mar 20, 2013 | Completed final sign-off Oct 2013 | 245 05th St | add half bath, refinish floors, new paint, relocate interior stairs, tile.Details
add half bath, refinish floors, new paint, relocate interior stairs, tile. | $85,000 |
| Mar 13, 2013 | Completed final sign-off Sep 2013 | 650 Delancey St | #205 - remodel master bathroom & guest bathroomDetails
#205 - remodel master bathroom & guest bathroom | $90,000 |
| Feb 28, 2013 | Expired or cancelled cancelled Oct 2013 | 125 Connecticut St | convert storage room to laundry room with bathroom and spiral staircase from 1st to second floor.Details
convert storage room to laundry room with bathroom and spiral staircase from 1st to second floor. | $39,000 |
| Dec 11, 2012 | Completed final sign-off Sep 2013 | 245 05th St | #305 - remodel of existing kitchen and bathroom, provide new shower and master closet.Details
#305 - remodel of existing kitchen and bathroom, provide new shower and master closet. | $90,000 |
| Oct 26, 2012 | Completed final sign-off Nov 2013 | 650 Delancey St | unit #103 - remodel of 2 existing bathrooms & 1 kitchen, full demo of spaces plus all new fixtures, finishes & lighting.Details
unit #103 - remodel of 2 existing bathrooms & 1 kitchen, full demo of spaces plus all new fixtures, finishes & lighting. | $60,000 |
| Sep 26, 2012 | Completed final sign-off Oct 2013 | 1659 47th Av | full renovation of (e) 1964 sq ft home. new bathroom at 1st floor, replace windows in kind per plan. remodel kitchen & bath on 2nd floor. structural upgrades per plan.Details
full renovation of (e) 1964 sq ft home. new bathroom at 1st floor, replace windows in kind per plan. remodel kitchen & bath on 2nd floor. structural upgrades per plan. | $120,000 |
| May 3, 2011 | Completed final sign-off Oct 2011 | 1668 Fulton St | #1670 - remodel 575 sf for kitchen, family room, dining area, hall bathroom & water closet. heating and t-24 under separate permit.Details
#1670 - remodel 575 sf for kitchen, family room, dining area, hall bathroom & water closet. heating and t-24 under separate permit. | $88,560 |
| May 21, 2009 | Completed final sign-off Jan 2010 | 3536 Broderick St | kitchen remodel, reconfigure interior walls to add master bath, remodel existing hall bath, replace select windows. all work on 2nd floor. windows do not face the street.same size & same location. no structural work for this project.Details
kitchen remodel, reconfigure interior walls to add master bath, remodel existing hall bath, replace select windows. all work on 2nd floor. windows do not face the street.same size & same location. no structural work for this project. | $74,847 |
| Aug 31, 2006 | Completed final sign-off Dec 2007 | 75 Pierce St | construct new attic dormers for a new closet & bathroom, new roof deck. enlarge an (e) dining room.Details
construct new attic dormers for a new closet & bathroom, new roof deck. enlarge an (e) dining room. | $125,000 |
| Mar 13, 2000 | Completed final sign-off Sep 2000 | 60 Pinehurst Wy | create new ground floor bedroom, remodel (e) ground floor fam rm, bath, upgrade (e) stairwayDetails
create new ground floor bedroom, remodel (e) ground floor fam rm, bath, upgrade (e) stairway | $40,000 |