Back to bathroom remodel contractors
S D W Construction
- Based in
- Richmond
- On San Francisco permits
- Apr 2016 to Nov 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 1 completed, 1 never finaled, 8 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 expired or cancelled. Typically 92 days from filing to permit and 557 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2018 | Expired or cancelled expired Oct 2022 | 269 Carl St | interior remodel to basement area inside enevelope, interior staircase from basement to 1st floor. add one bedroom & 2 bathrooms to basement areaDetails
interior remodel to basement area inside enevelope, interior staircase from basement to 1st floor. add one bedroom & 2 bathrooms to basement area | $50,000 |
| Apr 4, 2018 | Expired or cancelled cancelled Jan 2026 | 269 Carl St | addition to the rear of the house to the basement & 1st fl level. remodel (e) 1st flr and install moment fram @ both levels. includes bedroom, full bath, living room and courtyardDetails
addition to the rear of the house to the basement & 1st fl level. remodel (e) 1st flr and install moment fram @ both levels. includes bedroom, full bath, living room and courtyard | $95,000 |
| Jul 28, 2016 | Completed final sign-off Feb 2018 | 44 Hancock St | horizontal addition at 1/f -remodel of existing bathroom, in kind. infill of lightwell and skylight installation.Details
horizontal addition at 1/f -remodel of existing bathroom, in kind. infill of lightwell and skylight installation. | $15,000 |