Back to bathroom remodel contractors
S C Saroff
- Based in
- Redwood City
- On San Francisco permits
- Dec 2003 to May 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 5 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2015 | Completed final sign-off May 2016 | 47 Harrington St | 1st floor: add 2 baths, 2 bedrooms, one family room and laundry. 2nd floor: remodel kitchen and bathroom and add one full bath.Details
1st floor: add 2 baths, 2 bedrooms, one family room and laundry. 2nd floor: remodel kitchen and bathroom and add one full bath. | $90,000 |
| Jul 30, 2014 | Completed final sign-off Aug 2015 | 2295 Vallejo St | replace (e) kitchen cabinets, counter & appliances, retile shower, retile bath floor, replace (e) vanity sink. no structural work.Details
replace (e) kitchen cabinets, counter & appliances, retile shower, retile bath floor, replace (e) vanity sink. no structural work. | $11,000 |
| Feb 5, 2014 | Completed final sign-off Mar 2014 | 633 Banks St | remodel downstairs bathroom and bedroom, remodel upstairs bathroom, install new furnace, install new windows, fiberglass at front.Details
remodel downstairs bathroom and bedroom, remodel upstairs bathroom, install new furnace, install new windows, fiberglass at front. | $60,000 |
| Feb 28, 2011 | Completed final sign-off Aug 2011 | 755 Sanchez St | remodel middle story of (e) residence, relocate washer & dryer, add new bathroom, building interior walls to divide space into 2 bedrooms, bathroom & laundry roomDetails
remodel middle story of (e) residence, relocate washer & dryer, add new bathroom, building interior walls to divide space into 2 bedrooms, bathroom & laundry room | $63,800 |
| Jul 11, 2005 | Completed final sign-off Nov 2005 | 2243 Francisco St | remodel kitchen and 2 baths. install can lights, fluorescent lts,replace e kitchen wndws with u val.Details
remodel kitchen and 2 baths. install can lights, fluorescent lts,replace e kitchen wndws with u val. | $30,000 |