Back to bathroom remodel contractors
S And L Tec Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Oct 2024
- Last 24 months
- 1 permit filed
55 permits since 2000: 53 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 28 completed, 1 never finaled, 1 expired or cancelled. Typically 14 days from filing to permit and 217 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2024 | Completed final sign-off Apr 2025 | 1334 17th Av | revision to pa#202403278740. unit 1334: reconfigure bathrooms per layout. relocate new fireplace. unit 1336:reconfigure bathroom per layout. relocate new fire place. 3 new skylights. replace all sheetrock and insulation on 2nd and 3rd floors.Details
revision to pa#202403278740. unit 1334: reconfigure bathrooms per layout. relocate new fireplace. unit 1336:reconfigure bathroom per layout. relocate new fire place. 3 new skylights. replace all sheetrock and insulation on 2nd and 3rd floors. | $1,000 |
| Mar 27, 2024 | Completed final sign-off Apr 2025 | 1334 17th Av | unit# 1334: remodel kitchen and bath, add 1-bath, add insulation at front and rear walls of bldg. unit# 1336:remodel kitchen and bath, add insulation at front and rear walls of bldg and ceiling.Details
unit# 1334: remodel kitchen and bath, add 1-bath, add insulation at front and rear walls of bldg. unit# 1336:remodel kitchen and bath, add insulation at front and rear walls of bldg and ceiling. | $95,000 |
| Mar 20, 2023 | Completed final sign-off Oct 2023 | 533 Thornton Av | 2/f: relocate kitchen, convert (e) kitchen space to bedroom. remodel (e) bathroom. replace (e) sheet rock with new and replace 5 windows in kind. repair (e) staircase at rear in kind. 50 percent or less repair on the stair and no new firewalls.Details
2/f: relocate kitchen, convert (e) kitchen space to bedroom. remodel (e) bathroom. replace (e) sheet rock with new and replace 5 windows in kind. repair (e) staircase at rear in kind. 50 percent or less repair on the stair and no new firewalls. | $68,400 |
| Jan 11, 2023 | Completed final sign-off Jun 2023 | 780 Monterey Bl | kitchen and one bathroom remodel. replace one subpanel, install 40 recessed lights. layout unchanged.Details
kitchen and one bathroom remodel. replace one subpanel, install 40 recessed lights. layout unchanged. | $35,000 |
| May 3, 2022 | Completed final sign-off May 2023 | 1336 38th Av | g/f reduce (e) garage into 1 car; enclose bottom rear area (e) 2nf fl into hab. space. bld 2 (n) bed/bath; (n) media rm w/ wet bar, fam rm, & ldry; replace (e) & bld (n) int strs. 2nd fl remove (e) bearing wall, create open lvng/dining/kit. bld 2 bed/bath, enlrg rear deck & replace str to r yrdDetails
g/f reduce (e) garage into 1 car; enclose bottom rear area (e) 2nf fl into hab. space. bld 2 (n) bed/bath; (n) media rm w/ wet bar, fam rm, & ldry; replace (e) & bld (n) int strs. 2nd fl remove (e) bearing wall, create open lvng/dining/kit. bld 2 bed/bath, enlrg rear deck & replace str to r yrd | $285,000 |
| Mar 23, 2022 | Completed final sign-off Sep 2022 | 115 Britton St | add 2 bedrooms, 1 media room, hallway add 2 full bathrooms @ ground floorDetails
add 2 bedrooms, 1 media room, hallway add 2 full bathrooms @ ground floor | $6,000 |
| Sep 2, 2021 | Completed final sign-off May 2022 | 2083 21st Av | construct 1 new bathroom & remodel (e) bathroom at 2nd floor. construct 2 bedroom & 2 bathroom at ground floor.Details
construct 1 new bathroom & remodel (e) bathroom at 2nd floor. construct 2 bedroom & 2 bathroom at ground floor. | $82,000 |
| Aug 30, 2021 | Completed final sign-off Apr 2023 | 245 Lakeshore Dr | remove and replace all sheet rock. remodel kitchen, 2 bathrooms and replace 10 windows on second floor- 3 windows street facingDetails
remove and replace all sheet rock. remodel kitchen, 2 bathrooms and replace 10 windows on second floor- 3 windows street facing | $50,000 |
| Aug 4, 2021 | Completed final sign-off Apr 2023 | 245 Lakeshore Dr | 1/f: add 2 new bedroom suites, 1 family room and 1 full bathDetails
1/f: add 2 new bedroom suites, 1 family room and 1 full bath | $98,680 |
| Jan 29, 2021 | Completed final sign-off Aug 2022 | 1568 Cayuga Av | 1/f: add 2 bedrooms,media and 1 full bathroom, 2/f: remodel kitchen, bathroom. add home office and 1 full bathroom. relocate interior stair.Details
1/f: add 2 bedrooms,media and 1 full bathroom, 2/f: remodel kitchen, bathroom. add home office and 1 full bathroom. relocate interior stair. | $60,000 |
| Oct 28, 2020 | Completed final sign-off Oct 2021 | 168 Princeton St | 1st fl: remodel 1 bathroom, add 1 full bath, 2 bedrooms, & media room. 2nd fl: add new deck.Details
1st fl: remodel 1 bathroom, add 1 full bath, 2 bedrooms, & media room. 2nd fl: add new deck. | $85,000 |
| Nov 8, 2019 | Completed final sign-off Jul 2021 | 1347 Jackson St | unit 204 and unit 304 2nd fl & 3rd fl: maintenance and renovation work. replace cracked lath plaster finish with gypsum board finish. instrall bath insulation. replace kitchen and bath finishes. casework countertops and fixtures. fire alarm/sprinkler under sep permit.Details
unit 204 and unit 304 2nd fl & 3rd fl: maintenance and renovation work. replace cracked lath plaster finish with gypsum board finish. instrall bath insulation. replace kitchen and bath finishes. casework countertops and fixtures. fire alarm/sprinkler under sep permit. | $65,798 |
| Sep 23, 2019 | Never finaled issued Apr 2021, no final | 25 Appleton Av | to legalize ground floor unit to add one studio, kitchen, full bath and media room.Details
to legalize ground floor unit to add one studio, kitchen, full bath and media room. | $50,000 |
| Sep 23, 2019 | Completed final sign-off Aug 2021 | 1691 23rd Av | remodel (e) kitchen, (e) 2 baths, change electric service, in kindDetails
remodel (e) kitchen, (e) 2 baths, change electric service, in kind | $32,000 |
| Feb 25, 2019 | Completed final sign-off Sep 2019 | 1642 Alabama St | 1st flor remodel of kitchen and bathDetails
1st flor remodel of kitchen and bath | $25,000 |
| Aug 17, 2018 | Completed final sign-off Jun 2019 | 1347 Jackson St | units 202, 302, 402. maintenance renovation work, repair and replace plaster finish w/ gypsum board. add insulation to exterior walls, ceilings and interior walls separating units. replace kitchen and bath cabinets and fixtures. all repairs in-kindDetails
units 202, 302, 402. maintenance renovation work, repair and replace plaster finish w/ gypsum board. add insulation to exterior walls, ceilings and interior walls separating units. replace kitchen and bath cabinets and fixtures. all repairs in-kind | $60,000 |
| Jul 10, 2017 | Completed final sign-off Mar 2019 | 1638 Wallace Av | construct rear deck (9') with stairs at rear of existing building per plan. add 1 bedrm, 1 family rm, 1 full bath at e gr fl per planDetails
construct rear deck (9') with stairs at rear of existing building per plan. add 1 bedrm, 1 family rm, 1 full bath at e gr fl per plan | $50,000 |
| May 12, 2017 | Completed final sign-off Jun 2018 | 579 18th Av | 1st fl. 1) add 1 powder, mud room & media room per plan. 2) convert extg storage into bedroom. 2nd flr: 3)add one powder per plan, 4)swap extg dining & extg kitchen location per plan. 5) remove extg study room & full bath to enlarge dinning area. 6) enlarge extg deck space at rear of bldg.Details
1st fl. 1) add 1 powder, mud room & media room per plan. 2) convert extg storage into bedroom. 2nd flr: 3)add one powder per plan, 4)swap extg dining & extg kitchen location per plan. 5) remove extg study room & full bath to enlarge dinning area. 6) enlarge extg deck space at rear of bldg. | $55,000 |
| Feb 7, 2017 | Completed final sign-off Aug 2017 | 555 Head St | 1)add 1 bedroom, 1 family room, 1 full bath & mudroom on 1st floor per plan. 2)remodel kitchen inkind 3)remove & replace gyp bd at upper level 4)upgrade electrical at upper level.Details
1)add 1 bedroom, 1 family room, 1 full bath & mudroom on 1st floor per plan. 2)remodel kitchen inkind 3)remove & replace gyp bd at upper level 4)upgrade electrical at upper level. | $35,000 |
| Jan 18, 2017 | Completed final sign-off Jul 2017 | 119 Riverton Dr | to add one full bathroom, remodel extg kitchen and bath room on 2nd floor per plan.Details
to add one full bathroom, remodel extg kitchen and bath room on 2nd floor per plan. | $30,000 |
| Oct 13, 2016 | Completed final sign-off Jun 2017 | 519 London St | ground floor only: no structural, construct 2 (n) bedrooms, (n) recreation room and (n) full bath at ground floor (approx 430 sq ft); relocate (e) furnace, (e) water heater, (e) laundry, legalize (e) bathroomDetails
ground floor only: no structural, construct 2 (n) bedrooms, (n) recreation room and (n) full bath at ground floor (approx 430 sq ft); relocate (e) furnace, (e) water heater, (e) laundry, legalize (e) bathroom | $20,000 |
| Jul 5, 2016 | Completed final sign-off Sep 2016 | 348 Sussex St | remodel one bathroom, demo to stud, removed floor in bathroom.Details
remodel one bathroom, demo to stud, removed floor in bathroom. | $6,000 |
| May 1, 2015 | Expired or cancelled expired Mar 2026 | 1355 Jackson St | rear bldg - general remodel of existing kitchen & bathroom in each unit. convert existing storage room of each unit into new 2nd bathroom.Details
rear bldg - general remodel of existing kitchen & bathroom in each unit. convert existing storage room of each unit into new 2nd bathroom. | $70,000 |
| Jan 27, 2015 | Completed final sign-off May 2016 | 471 06th Av | unit 3 - remodel kitchen and 2 and a half bathroom ; no doors/walls/window under this permit. verify co/smoke hlang per cbc-2013Details
unit 3 - remodel kitchen and 2 and a half bathroom ; no doors/walls/window under this permit. verify co/smoke hlang per cbc-2013 | $15,000 |
| Oct 3, 2014 | Completed final sign-off Feb 2015 | 683 23rd Av | add 1 bedroom, 1storage, 1 family room, 1 bathroom on the 1st fl. e kitchen and power rm remodel on 2nd fl, add recessed lights on 2nd fl, add 1 bath, bath remodel on 3rd flDetails
add 1 bedroom, 1storage, 1 family room, 1 bathroom on the 1st fl. e kitchen and power rm remodel on 2nd fl, add recessed lights on 2nd fl, add 1 bath, bath remodel on 3rd fl | $35,000 |
| Aug 19, 2013 | Completed final sign-off Apr 2014 | 2051 Carroll Av | remodel ground floor. add one bedroom, family room, bath and study room. 2nd fl bathroom to be remodeled.Details
remodel ground floor. add one bedroom, family room, bath and study room. 2nd fl bathroom to be remodeled. | $40,000 |
| Feb 15, 2013 | Completed final sign-off Aug 2013 | 2675 37th Av | to add two bedroom, one family room, two full bathroom, one laundry room & storage on existing ground floor per plan.Details
to add two bedroom, one family room, two full bathroom, one laundry room & storage on existing ground floor per plan. | $80,000 |
| Feb 21, 2012 | Completed final sign-off Jul 2012 | 511 Crescent Av | convert gr floor store to habitable space: add 2 bedrooms, 1 family room legalize existing half bath on existing gr floor per plan. convert gift store to habitable space, add 2 new windowsDetails
convert gr floor store to habitable space: add 2 bedrooms, 1 family room legalize existing half bath on existing gr floor per plan. convert gift store to habitable space, add 2 new windows | $30,000 |
| Jan 26, 2012 | Completed final sign-off Mar 2012 | 407 Cornwall St | removal partial of drywall at kitchen & bath on 2nd floor. replace existing plumbing fixtures with new fixtures. add several outlets over kitchen.Details
removal partial of drywall at kitchen & bath on 2nd floor. replace existing plumbing fixtures with new fixtures. add several outlets over kitchen. | $1,000 |
| Mar 26, 2010 | Completed final sign-off Apr 2010 | 116 Waverly Pl | replace tile in kitchen floor and bathroom floor and wall, 150 sq. ft. (tile work only, no other work).Details
replace tile in kitchen floor and bathroom floor and wall, 150 sq. ft. (tile work only, no other work). | $3,000 |