Back to bathroom remodel contractors
Ryan Construction
- Based in
- Burlingame
- On San Francisco permits
- Apr 2000 to Aug 2026
- Last 24 months
- 8 permits filed
108 permits since 2000: 86 completed, 6 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 8 completed, 2 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 328 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2025 | Completed final sign-off Apr 2026 | 237 Valley St | second floor unit: remodel bathroom. third floor unit: remodel kitchen and bathroom.Details
second floor unit: remodel bathroom. third floor unit: remodel kitchen and bathroom. | $45,000 |
| May 1, 2025 | Completed final sign-off Apr 2026 | 237 Valley St | add half bathroom to first floor unitDetails
add half bathroom to first floor unit | $8,000 |
| Dec 27, 2022 | Never finaled issued Mar 2023, no final | 920 Sanchez St | exterior work: replace and reconfigure (e) rear deck and staircase and (e) garage level windows. 1/f garage level: new bedroom, bath, closets and laundry in (e) garage space. 2/f: replace (e) rear window with door.Details
exterior work: replace and reconfigure (e) rear deck and staircase and (e) garage level windows. 1/f garage level: new bedroom, bath, closets and laundry in (e) garage space. 2/f: replace (e) rear window with door. | $175,000 |
| Jun 9, 2022 | Completed final sign-off Apr 2024 | 2296 Filbert St | unit #4: remodel of existing (1) kitchen and (1) bathroom in apt #4 only.Details
unit #4: remodel of existing (1) kitchen and (1) bathroom in apt #4 only. | $25,000 |
| Mar 25, 2022 | Completed final sign-off Jun 2023 | 743 Foerster St | 1st fl: reconfigure (e) full bath & storage. expand entry area into garage. 2nd fl: remodel (e) bathroom.Details
1st fl: reconfigure (e) full bath & storage. expand entry area into garage. 2nd fl: remodel (e) bathroom. | $46,187 |
| Jan 14, 2022 | Completed final sign-off Nov 2022 | 2341 27th Av | 1/f: convert portion of (e) storage space into conditioned spaces to include 1 new bedroom, 1 new bath, 1 new laundry area, new window to replace (e) same opening, new (e) double doors to replace (e) single door and window @ rear of houseDetails
1/f: convert portion of (e) storage space into conditioned spaces to include 1 new bedroom, 1 new bath, 1 new laundry area, new window to replace (e) same opening, new (e) double doors to replace (e) single door and window @ rear of house | $45,000 |
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 3847 22nd St | renovate 1st floor of (e) single-family house to provide (n) accessory dwelling unit. includes 1-hour rated partitions between (e) and (n) units and kitchen and fire sprinklers in new unit. building enevlope, laundry room, studio, stairs, bath, electrical, and plumbing work under #201212286987s.Details
renovate 1st floor of (e) single-family house to provide (n) accessory dwelling unit. includes 1-hour rated partitions between (e) and (n) units and kitchen and fire sprinklers in new unit. building enevlope, laundry room, studio, stairs, bath, electrical, and plumbing work under #201212286987s. | $20,000 |
| Jun 27, 2014 | Completed final sign-off May 2015 | 295 Guerrero St | g/f- commercial tenant improvement to existing limited corner commercial space to include new windows and ada bathroom remodelDetails
g/f- commercial tenant improvement to existing limited corner commercial space to include new windows and ada bathroom remodel | $25,000 |
| Sep 29, 2011 | Expired or cancelled expired Oct 2012 | 102 Alta St | remodel (e) bathroom in apt#3 only. update electrical, plumbing & finishes in bathroom. lighting must comply w/ cec 150(k).Details
remodel (e) bathroom in apt#3 only. update electrical, plumbing & finishes in bathroom. lighting must comply w/ cec 150(k). | $18,000 |
| Jul 12, 2011 | Completed final sign-off Dec 2011 | 3593 21st St | in unit 3593 - remodel existing bathroom, remove sheetrock & replace all plumbing fixtures, install new tile, high efficacy lighting or occupancy sensor control, exhaust fan connect to existing duct.Details
in unit 3593 - remodel existing bathroom, remove sheetrock & replace all plumbing fixtures, install new tile, high efficacy lighting or occupancy sensor control, exhaust fan connect to existing duct. | $16,500 |
| May 23, 2008 | Expired or cancelled expired Sep 2010 | 558 Chenery St | proposed 2 car garage addition below grade at basement level. interior renovation to include reconfiguration of bedrooms, bathroom addition, kitchen remodel and reconstruction of rear one-story enclosed room with roof deck ( no change in floor area)Details
proposed 2 car garage addition below grade at basement level. interior renovation to include reconfiguration of bedrooms, bathroom addition, kitchen remodel and reconstruction of rear one-story enclosed room with roof deck ( no change in floor area) | $300,000 |
| Oct 22, 2007 | Completed final sign-off Jul 2008 | 3591 21st St | to complete work of permit#200608078789. kitchen and bath remodelDetails
to complete work of permit#200608078789. kitchen and bath remodel | $10,000 |