Ruschke Management & Construction
- Based in
- Novato
- On San Francisco permits
- Jul 2011 to Jun 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2014 | Completed final sign-off Nov 2014 | 2600 18th St | unit #19: replace bath tub with shower/toilet slab/sgheetrock, replace toilet, fan, new lights and switches, paint; compliance with ord 155-13 not requiredDetails
unit #19: replace bath tub with shower/toilet slab/sgheetrock, replace toilet, fan, new lights and switches, paint; compliance with ord 155-13 not required | $5,000 |