Back to bathroom remodel contractors
Rothman Construction
- Based in
- Mill Valey
- On San Francisco permits
- Sep 2017 to Jan 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 21 days from filing to permit and 456 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2024 | Completed final sign-off Mar 2024 | 854 43rd Av | legalized remodeled bathroom in garage & shower -work done in 2019 refinish garage basement, reccessed lights, plugs, drywall. (gf only)Details
legalized remodeled bathroom in garage & shower -work done in 2019 refinish garage basement, reccessed lights, plugs, drywall. (gf only) | $15,000 |
| Dec 3, 2023 | Expired or cancelled cancelled Dec 2023 | 854 43rd Av | in-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in basement and in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s). | $15,000 |
| May 28, 2021 | Completed final sign-off Nov 2023 | 541 15th Av | remodel kitchen, open wall, add columbs & new ftgs in garage. add 1/2 bath at 2nd fl. remodel 3rd fl bath. add a masterbath. reconfig closets. add family rm & a bath on g/f. seismic upgrade new rooms. (e) int. stair to remain but make rail safer. 432 sf nw habitable space, bolt found, mep upgradesDetails
remodel kitchen, open wall, add columbs & new ftgs in garage. add 1/2 bath at 2nd fl. remodel 3rd fl bath. add a masterbath. reconfig closets. add family rm & a bath on g/f. seismic upgrade new rooms. (e) int. stair to remain but make rail safer. 432 sf nw habitable space, bolt found, mep upgrades | $125,000 |