Room By Room Maintenance Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Dec 2021
- Last 24 months
- 0 permits filed
30 permits since 2000: 23 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 0 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2018 | Completed final sign-off Apr 2019 | 249 Allison St | reframe 3 (e) bathroom walls in-kind out to dryrot. replace 450sf of subfloor due to dry rott. drywall repairs for mep. replace 30% of rear deck & stairs, in-kind due to dry rot.Details
reframe 3 (e) bathroom walls in-kind out to dryrot. replace 450sf of subfloor due to dry rott. drywall repairs for mep. replace 30% of rear deck & stairs, in-kind due to dry rot. | $10,000 |
| Nov 24, 2015 | Completed final sign-off Jul 2016 | 1351 Harrison St | repair fire damage as per n.o.v. dated 9-25-15includes roof, deck & stair in-kind @ rear of bldg. n/a maher ordinanceDetails
repair fire damage as per n.o.v. dated 9-25-15includes roof, deck & stair in-kind @ rear of bldg. n/a maher ordinance | $20,000 |
| Feb 5, 2014 | Completed final sign-off Aug 2014 | 778 26th Av | add 3 bedroom & 2 bath @ ground floor, rearrange floor layout, add 2 bedroom & one bath @ 2/f. replace dry-rotted wall & broken foundation @ rear of bldg. remove existing deck & stair @ rear of bldg.Details
add 3 bedroom & 2 bath @ ground floor, rearrange floor layout, add 2 bedroom & one bath @ 2/f. replace dry-rotted wall & broken foundation @ rear of bldg. remove existing deck & stair @ rear of bldg. | $98,000 |