Roofworx Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2023 to Jun 2026
- Last 24 months
- 79 permits filed
122 permits since 2000: 111 completed, 9 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 1 days from filing to permit and 11 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2025 | Completed final sign-off Feb 2025 | 816 Victoria St | demo (e) shingles, vents, pipes, flashings and haul away. replace rotten wood as needed. install new o'haggin vents, install metal drip edge: install gaf leak barrier, install gaf deck underlayment. install gaf grand sequoia rs shingles, install ridge shingles. re seal all sensitives areas.....Details
demo (e) shingles, vents, pipes, flashings and haul away. replace rotten wood as needed. install new o'haggin vents, install metal drip edge: install gaf leak barrier, install gaf deck underlayment. install gaf grand sequoia rs shingles, install ridge shingles. re seal all sensitives areas..... | $20,000 |