Rony's Dream Construction
- Based in
- Millbrae
- On San Francisco permits
- Aug 2026 to Aug 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 83 Noe St | replacing the plaster walls w/sheetrock in unit 83. all work is interior. replacing 9 windows & 1 sliding door like for like. 3 window are street-facing window in wood hung - not being curved sashes as they were already removed.Details
replacing the plaster walls w/sheetrock in unit 83. all work is interior. replacing 9 windows & 1 sliding door like for like. 3 window are street-facing window in wood hung - not being curved sashes as they were already removed. | $36,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 83 Noe St | demolition of kitchen and bathroom, remodel kitchen and bathroom in kind. no change to floor layout and structual foot print. no wall stud demolition or configuration. will relocate vanity and toilet in bathroom.Details
demolition of kitchen and bathroom, remodel kitchen and bathroom in kind. no change to floor layout and structual foot print. no wall stud demolition or configuration. will relocate vanity and toilet in bathroom. | $32,100 |