Back to bathroom remodel contractors
Rong Guo Zhu
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2022
- Last 24 months
- 0 permits filed
23 permits since 2000: 20 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2019 | Completed final sign-off Jul 2019 | 20 Dellbrook Av | remodel of single fam dwelling. add 2 bedrooms, 1 family and 1 bathroom at 1st flr. add recessed lights and replace (e) windows at 2nd flr. mech electr plumb under separate permitDetails
remodel of single fam dwelling. add 2 bedrooms, 1 family and 1 bathroom at 1st flr. add recessed lights and replace (e) windows at 2nd flr. mech electr plumb under separate permit | $60,000 |
| Apr 5, 2017 | Completed final sign-off Jun 2017 | 1494 42nd Av | adding bedroom and bathroom(195 sq ft) on first floor of extg family dwelling.Details
adding bedroom and bathroom(195 sq ft) on first floor of extg family dwelling. | $30,000 |
| Mar 23, 2017 | Completed final sign-off Apr 2017 | 355 24th Av | #301- remodel existing kitchen & bathroom. no structural work.Details
#301- remodel existing kitchen & bathroom. no structural work. | $25,000 |
| Feb 24, 2016 | Completed final sign-off May 2016 | 775 09th Av | unit a&c: remodel kitchen & bathroom with exhaust fan & rangehood, comply with table cmc403.7, cbc 714.4 & 717.6; 3 ft from p.l. & openings. all led lights.Details
unit a&c: remodel kitchen & bathroom with exhaust fan & rangehood, comply with table cmc403.7, cbc 714.4 & 717.6; 3 ft from p.l. & openings. all led lights. | $40,000 |
| Oct 13, 2011 | Completed final sign-off Jan 2012 | 2179 30th Av | revision to appl #201108162510 - relocate & reconfigure the location of bathroom & half bath on 1st floor.Details
revision to appl #201108162510 - relocate & reconfigure the location of bathroom & half bath on 1st floor. | |
| Aug 16, 2011 | Completed final sign-off Jan 2012 | 2179 30th Av | add one family room, bedroom, bathroom, half bath & storage on first floor (more or less than 505 sf). replace (e) exterior siding w/new exterior siding at rear wall.Details
add one family room, bedroom, bathroom, half bath & storage on first floor (more or less than 505 sf). replace (e) exterior siding w/new exterior siding at rear wall. | $38,000 |
| Dec 17, 2007 | Completed final sign-off Mar 2008 | 277 Paris St | add 1 bedroom, 1 play room, laundry rm, 1 full bath and storage on ex. ground floorDetails
add 1 bedroom, 1 play room, laundry rm, 1 full bath and storage on ex. ground floor | $38,000 |
| Jan 10, 2002 | Completed final sign-off Mar 2002 | 68 Springfield Dr | remodel kitchen and bathroom no structural workDetails
remodel kitchen and bathroom no structural work | $10,000 |